Deck 7: Additional Spc Techniques for Variables

ملء الشاشة (f)
exit full mode
سؤال
What type of process is the packaging of tooth paste?

A) continuance
B) batch
C) discrete
D) none of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following type(s) of short-run control is/are based on specifications?

A) Z and W
B) precontrol
C) deviation chart
D) a and b
سؤال
Before changing from the set up mode to the run mode in precontrol there must be

A) 3 consecutive goods in the green zone
B) 5 consecutive goods in the green zone
C) 7 consecutive goods in the green zone
D) acceptable parts
سؤال
Determine the plotted point for a PTPCC, where the specification for a part number is 5.23 ± 0.03 and an inspected measured value is 5.24.
سؤال
Determine the central lines for Z and MW charts and draw the charts. If the target X is 2.00 and the target R is 0.05, determine the plotted points for the following values. Determine the central lines for Z and MW charts and draw the charts. If the target X is 2.00 and the target R is 0.05, determine the plotted points for the following values.    <div style=padding-top: 35px>
Determine the central lines for Z and MW charts and draw the charts. If the target X is 2.00 and the target R is 0.05, determine the plotted points for the following values.    <div style=padding-top: 35px>
سؤال
Which of the following type(s) of short-run control is/are derived from the X and R charts?

A) Z and W charts
B ) precontrol
C) specification chart
D) b and c
سؤال
What type of process is the production of soup?

A) continuance
B) batch
C) discrete
D) none of the above
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/7
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Additional Spc Techniques for Variables
1
What type of process is the packaging of tooth paste?

A) continuance
B) batch
C) discrete
D) none of the above
A
2
Which of the following type(s) of short-run control is/are based on specifications?

A) Z and W
B) precontrol
C) deviation chart
D) a and b
B
3
Before changing from the set up mode to the run mode in precontrol there must be

A) 3 consecutive goods in the green zone
B) 5 consecutive goods in the green zone
C) 7 consecutive goods in the green zone
D) acceptable parts
B
4
Determine the plotted point for a PTPCC, where the specification for a part number is 5.23 ± 0.03 and an inspected measured value is 5.24.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
5
Determine the central lines for Z and MW charts and draw the charts. If the target X is 2.00 and the target R is 0.05, determine the plotted points for the following values. Determine the central lines for Z and MW charts and draw the charts. If the target X is 2.00 and the target R is 0.05, determine the plotted points for the following values.
Determine the central lines for Z and MW charts and draw the charts. If the target X is 2.00 and the target R is 0.05, determine the plotted points for the following values.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following type(s) of short-run control is/are derived from the X and R charts?

A) Z and W charts
B ) precontrol
C) specification chart
D) b and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
7
What type of process is the production of soup?

A) continuance
B) batch
C) discrete
D) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.