ERP systems that operate from multiple decentralized databases were engineered to replace the older legacy MRP systems.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The process of converting a parent item's planned order releases into component gross requirements is referred to as the ERP Implosion.
سؤال
A Mixed Production Strategy uses a blend of chase and level strategies by striving to maintain a stable core workforce while using other means like temporary workers to manage short-term high demand.
سؤال
An MRP system has a subassembly with a lot size of 100 units.In terms of filling future requirements,this would mean that planned order releases for the subassembly would always have to be exactly 100 units.
سؤال
The three basic production strategies for addressing the aggregate planning problem are the chase production strategy,the level production strategy,and the mixed production strategy.
سؤال
Lead Capacity Strategy is a proactive approach that adds or subtracts capacity in anticipation of future market conditions and demand.
سؤال
Key requirements to a successful ERP implementation include adequate computer support,accurate system inputs,and flexible business processes that can conform to the approaches used in the ERP software logic.
سؤال
An ERP system is generally a multi-module application software for managing an enterprise's internal functional activities,as well as its suppliers and customers.
سؤال
Implementing a best-of-breed solution may cause firms to link databases from multiple software applications of different venders.
سؤال
Lack of communication between the implementing firm and its ERP software provider can become a major hindrance for a successful implementation.
سؤال
In general,single integrator ERP solutions are better suited to more intricate workplaces.
سؤال
The legacy MRP system was programmed to coordinate with other functional areas in the firm.
سؤال
A Master Production Schedule is a medium-range materials plan.
سؤال
According to the text,resource planning is the process of determining the production capacity required to meet demand.
سؤال
According to the text,a firm should always run its operations at 100 percent capacity to ensure changes affecting demand can be met.
سؤال
System nervousness is when even small changes to upper-level production plans cause major changes in lower-level production plans.
سؤال
Two reasons ERP implementations have been known to fail include: lack of employee training on the new ERP system and lack of adequate resources to support these complex and time consuming implementations.
سؤال
Legacy systems were designed to perform a very specific operational function.
سؤال
When a single company that is implementing an ERP system chooses to use one company to provide an operations module,another to provide the sales and marketing application,and yet another company to provide the finance and accounting module,that single company has chosen to utilize the best-of-breed solution.
سؤال
MRP is the production planning system intended to develop long-range plans (more than a year away)concerning product families manufactured by the organization.
سؤال
The acronym ERP is short for:

A)Enterprise Resource Planning
B)Electronic Resource Provider
C)Executive Resource Plan
D)Electronic Requirements Provider
سؤال
Which of the following results from using the chase production strategy?

A)The workforce fluctuates in response to the demand pattern
B)Finished goods inventories always remain constant
C)Both A & B
D)None of these
سؤال
The goal of resource planning is to minimize the discrepancy between capacity and:

A)Resources
B)Demand
C)Workload
D)Supply
سؤال
Which of the following is considered an advantage/benefit of utilizing an ERP system?

A)Fairly inexpensive to purchase and implement
B)Enables the company to utilize a single centralized database system,thus eliminating duplicate data entry.
C)Flexible enough that it allows different companies with different business models to mold the new ERP system to fit the company's business model
D)All of these
سؤال
Not all ERP software is designed to provide the exact same tools,nonetheless,some of the common modules usually included in ERP software packages include:

A)Customer Relationship Management and human resource management
B)Human resource management and accounting and finance
C)Supplier relationship management and customer relationship management
D)All of these
سؤال
According to the textbook,which of the following is considered a reason that ERP implementations fail?

A)The organization may lack the necessary workforce and expertise to properly implement the system
B)Top management becomes overcommitted to the point where they constantly encourage the employees during implementation
C)Organizations tend to spend too much time and money training their employees on the new system
D)All of these
سؤال
While ERP is a relatively new technology,it has grown rapidly since the early 1990s.Which of the following is the reason that has contributed to its rapid growth?

A)The year 2000 millennium bug
B)The trend for companies to eliminate their supply chain partners
C)The increased use of email during the 1990's
D)All of these
سؤال
Which of the following is considered an advantage/benefit of utilizing in ERP system?

A)Utilizes multiple databases in order to provide up-to-date information
B)Increases the privacy level within an organization,thus functional departments can more easily protect their data from supporting or dependent functional departments
C)Allows organizations to more easily communicate information about operational changes to supply chain members
D)Increases the bullwhip effect
سؤال
Which of the following is a Long Range Materials Plan:

A)Aggregate Production Plan
B)Master Capacity Plan
C)Materials Requirements Plan
D)Capacity Requirements Plan
سؤال
Which of the following is the hierarchical operations planning process order?

A)1st - Resource requirements plan (RRP),2nd - Rough-cut capacity plan (RCCP),3rd - Capacity requirements plan (CRP)
B)1st - Rough-cut capacity plan (RCCP),2nd - Resource requirements plan (RRP),3rd - Capacity requirements plan (CRP)
C)1st - Capacity requirements plan (CRP)2nd - Resource requirements plan (RRP),3rd - Rough-cut capacity plan (RCCP),
D)None of these
سؤال
Organizations that choose to implement the best applications or modules for each of the different functional departments associated with the supply chain versus choosing to implement one single system with all of the desired applications from a single vendor is said to have chosen a(n):

A)Best-of-breed solution
B)Elite integrator solution
C)Multi-modular solution
D)Premier application solution
سؤال
Which of the following seeks to develop short range plans seeking to effectively and efficiently manage components and/or subassemblies over time period of few days to a few weeks?

A)RRP
B)MPS
C)RCCP
D)MRP
سؤال
Which of the following basic production strategies used for addressing the aggregate planning problem would work best with make-to-order manufacturing firms?

A)Capacity Production Strategy
B)Chase Production Strategy
C)Level Production Strategy
D)Backlog Production Strategy
سؤال
Organizations that choose to implement one single system with all of the desired applications from a single vendor versus choosing to implement the best applications or modules for each of the different functional departments associated with the supply chain is said to have chosen a(n):

A)Best-of-breed solution
B)Elite integrator solution
C)Single integrator solution
D)Premier application solution
سؤال
Which of the following is an engineering document that shows an inclusive listing of all the component parts and assemblies making up the final product?

A)Master Production Schedule
B)Bill of Materials
C)Distribution Requirement Plan
D)Resource Requirement Plan
سؤال
Which strategy relies on a constant output rate and capacity while varying inventory and backlog levels to handle the fluctuating demand pattern?

A)Mixed Production Strategy
B)The Level Production Strategy
C)The Chase Production Strategy
D)The Aggregate Production Strategy
سؤال
In a bill of materials,items at which level are independent demand items?

A)Level 0
B)Level 1
C)Level 2
D)Level 3
سؤال
Which of the following is NOT one of the three basic methods used to calculate the available-to-promise quantities?

A)Discrete available-to-promise
B)Cumulative available-to-promise without looking ahead
C)Indiscrete available-to-promise
D)Cumulative available-to-promise with looking ahead
سؤال
To check the feasibility of the Master Production Schedule,one would look to:

A)Rough-Cut Capacity Plan
B)Material Requirement Plan
C)Capacity Requirement Plan
D)Distribution Requirement Plan
سؤال
Which of the following MRP terms represents the parts demanded by a parent?

A)Gross requirement
B)Component
C)Net requirement
D)Scheduled receipt
سؤال
Which of the following MRP terms represents a committed order awaiting delivery for a specific period?

A)​Projected on-hand inventory
B)​Time bucket
C)​Net requirement
D)​Scheduled receipt
سؤال
Which of the following was a limitation of the legacy MRP systems?

A)​The systems needed continuous modifications
B)​The systems were not user-friendly
C)​The systems were designed to perform a very specific operational function
D)​All of these
سؤال
What is the most important output of the MRP?

A)​Bill of materials
B)​Distribution requirements plan
C)​Planned order releases
D)​Aggregate production plan
سؤال
Which of the following is NOT a common module of ERP systems?

A)Human Resources Management
B)Customer Relationship Management
C)Marketing Resources Management
D)Supply Chain Management
سؤال
Which of the following is a reason firms are migrating to ERP systems?

A)​ERP systems are easy to implement,particularly in large organizations
B)​ERP systems are successful with two-dimensional processes
C)​ERP systems are successful with two-dimensional processes
D)​ERP systems are inexpensive to implement
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/45
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Resource Planning Systems
1
ERP systems that operate from multiple decentralized databases were engineered to replace the older legacy MRP systems.
False
2
The process of converting a parent item's planned order releases into component gross requirements is referred to as the ERP Implosion.
False
3
A Mixed Production Strategy uses a blend of chase and level strategies by striving to maintain a stable core workforce while using other means like temporary workers to manage short-term high demand.
True
4
An MRP system has a subassembly with a lot size of 100 units.In terms of filling future requirements,this would mean that planned order releases for the subassembly would always have to be exactly 100 units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
5
The three basic production strategies for addressing the aggregate planning problem are the chase production strategy,the level production strategy,and the mixed production strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
6
Lead Capacity Strategy is a proactive approach that adds or subtracts capacity in anticipation of future market conditions and demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
7
Key requirements to a successful ERP implementation include adequate computer support,accurate system inputs,and flexible business processes that can conform to the approaches used in the ERP software logic.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
8
An ERP system is generally a multi-module application software for managing an enterprise's internal functional activities,as well as its suppliers and customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
9
Implementing a best-of-breed solution may cause firms to link databases from multiple software applications of different venders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
10
Lack of communication between the implementing firm and its ERP software provider can become a major hindrance for a successful implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
11
In general,single integrator ERP solutions are better suited to more intricate workplaces.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
12
The legacy MRP system was programmed to coordinate with other functional areas in the firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
13
A Master Production Schedule is a medium-range materials plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
14
According to the text,resource planning is the process of determining the production capacity required to meet demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
15
According to the text,a firm should always run its operations at 100 percent capacity to ensure changes affecting demand can be met.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
16
System nervousness is when even small changes to upper-level production plans cause major changes in lower-level production plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
17
Two reasons ERP implementations have been known to fail include: lack of employee training on the new ERP system and lack of adequate resources to support these complex and time consuming implementations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
18
Legacy systems were designed to perform a very specific operational function.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
19
When a single company that is implementing an ERP system chooses to use one company to provide an operations module,another to provide the sales and marketing application,and yet another company to provide the finance and accounting module,that single company has chosen to utilize the best-of-breed solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
20
MRP is the production planning system intended to develop long-range plans (more than a year away)concerning product families manufactured by the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
21
The acronym ERP is short for:

A)Enterprise Resource Planning
B)Electronic Resource Provider
C)Executive Resource Plan
D)Electronic Requirements Provider
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following results from using the chase production strategy?

A)The workforce fluctuates in response to the demand pattern
B)Finished goods inventories always remain constant
C)Both A & B
D)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
23
The goal of resource planning is to minimize the discrepancy between capacity and:

A)Resources
B)Demand
C)Workload
D)Supply
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is considered an advantage/benefit of utilizing an ERP system?

A)Fairly inexpensive to purchase and implement
B)Enables the company to utilize a single centralized database system,thus eliminating duplicate data entry.
C)Flexible enough that it allows different companies with different business models to mold the new ERP system to fit the company's business model
D)All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
25
Not all ERP software is designed to provide the exact same tools,nonetheless,some of the common modules usually included in ERP software packages include:

A)Customer Relationship Management and human resource management
B)Human resource management and accounting and finance
C)Supplier relationship management and customer relationship management
D)All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
26
According to the textbook,which of the following is considered a reason that ERP implementations fail?

A)The organization may lack the necessary workforce and expertise to properly implement the system
B)Top management becomes overcommitted to the point where they constantly encourage the employees during implementation
C)Organizations tend to spend too much time and money training their employees on the new system
D)All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
27
While ERP is a relatively new technology,it has grown rapidly since the early 1990s.Which of the following is the reason that has contributed to its rapid growth?

A)The year 2000 millennium bug
B)The trend for companies to eliminate their supply chain partners
C)The increased use of email during the 1990's
D)All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following is considered an advantage/benefit of utilizing in ERP system?

A)Utilizes multiple databases in order to provide up-to-date information
B)Increases the privacy level within an organization,thus functional departments can more easily protect their data from supporting or dependent functional departments
C)Allows organizations to more easily communicate information about operational changes to supply chain members
D)Increases the bullwhip effect
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following is a Long Range Materials Plan:

A)Aggregate Production Plan
B)Master Capacity Plan
C)Materials Requirements Plan
D)Capacity Requirements Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is the hierarchical operations planning process order?

A)1st - Resource requirements plan (RRP),2nd - Rough-cut capacity plan (RCCP),3rd - Capacity requirements plan (CRP)
B)1st - Rough-cut capacity plan (RCCP),2nd - Resource requirements plan (RRP),3rd - Capacity requirements plan (CRP)
C)1st - Capacity requirements plan (CRP)2nd - Resource requirements plan (RRP),3rd - Rough-cut capacity plan (RCCP),
D)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
31
Organizations that choose to implement the best applications or modules for each of the different functional departments associated with the supply chain versus choosing to implement one single system with all of the desired applications from a single vendor is said to have chosen a(n):

A)Best-of-breed solution
B)Elite integrator solution
C)Multi-modular solution
D)Premier application solution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following seeks to develop short range plans seeking to effectively and efficiently manage components and/or subassemblies over time period of few days to a few weeks?

A)RRP
B)MPS
C)RCCP
D)MRP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following basic production strategies used for addressing the aggregate planning problem would work best with make-to-order manufacturing firms?

A)Capacity Production Strategy
B)Chase Production Strategy
C)Level Production Strategy
D)Backlog Production Strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
34
Organizations that choose to implement one single system with all of the desired applications from a single vendor versus choosing to implement the best applications or modules for each of the different functional departments associated with the supply chain is said to have chosen a(n):

A)Best-of-breed solution
B)Elite integrator solution
C)Single integrator solution
D)Premier application solution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is an engineering document that shows an inclusive listing of all the component parts and assemblies making up the final product?

A)Master Production Schedule
B)Bill of Materials
C)Distribution Requirement Plan
D)Resource Requirement Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which strategy relies on a constant output rate and capacity while varying inventory and backlog levels to handle the fluctuating demand pattern?

A)Mixed Production Strategy
B)The Level Production Strategy
C)The Chase Production Strategy
D)The Aggregate Production Strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
37
In a bill of materials,items at which level are independent demand items?

A)Level 0
B)Level 1
C)Level 2
D)Level 3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is NOT one of the three basic methods used to calculate the available-to-promise quantities?

A)Discrete available-to-promise
B)Cumulative available-to-promise without looking ahead
C)Indiscrete available-to-promise
D)Cumulative available-to-promise with looking ahead
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
39
To check the feasibility of the Master Production Schedule,one would look to:

A)Rough-Cut Capacity Plan
B)Material Requirement Plan
C)Capacity Requirement Plan
D)Distribution Requirement Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following MRP terms represents the parts demanded by a parent?

A)Gross requirement
B)Component
C)Net requirement
D)Scheduled receipt
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following MRP terms represents a committed order awaiting delivery for a specific period?

A)​Projected on-hand inventory
B)​Time bucket
C)​Net requirement
D)​Scheduled receipt
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which of the following was a limitation of the legacy MRP systems?

A)​The systems needed continuous modifications
B)​The systems were not user-friendly
C)​The systems were designed to perform a very specific operational function
D)​All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
43
What is the most important output of the MRP?

A)​Bill of materials
B)​Distribution requirements plan
C)​Planned order releases
D)​Aggregate production plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is NOT a common module of ERP systems?

A)Human Resources Management
B)Customer Relationship Management
C)Marketing Resources Management
D)Supply Chain Management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is a reason firms are migrating to ERP systems?

A)​ERP systems are easy to implement,particularly in large organizations
B)​ERP systems are successful with two-dimensional processes
C)​ERP systems are successful with two-dimensional processes
D)​ERP systems are inexpensive to implement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.