Deck 9: Mitigation Strategies for Natural Hazards

ملء الشاشة (f)
exit full mode
سؤال
Levees can increase flooding in upstream or downstream by changing the natural flow and volume of a river
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Chose the best answer to complete the following statement: Wetlands that are located at the edge of the deep water bodies function as a ________________.

A) overlay zone
B) hazard area
C) buffer zone
D) safe area
سؤال
Which of the following is not a property protection mitigation measure?

A) Floodproofing
B) Windproofing
C) Seismic retrofit
D) Zoning
سؤال
The International Code Council's (ICC) family of International Codes includes:

A) International Building Code (IBC)
B) International Residential Code (IRC)
C) International Existing Building Code (IEBC)
D) All of the above
سؤال
Reservoirs are located behind dams and reduce flooding by storing water during peak runoff periods.
سؤال
Capital Improvement Programs (CIP) are taken by federal government to implement large scale projects in the community such as schools, bridges, police stations, recreation centers, and other public facilities.
سؤال
The fifth amendment of the U.S. Constitution ensures that when government wants to purchase land from an individual, it must provide fair and just compensation for that property.
سؤال
In the United States, majority of the dams are not privately owned.
سؤال
Select the answer below that best completes the following statement: Communities can require nonconforming structures to be replaced within a certain time as the former uses become illegal once the structures are replaced or destroyed. This process is called ________________.

A) Overlay zones
B) Mitigation
C) Amortization
D) Eminent Domain
سؤال
In terms of zoning, one effective method is by down-zoning, which can be accomplished increasing the minimum lot size or reducing the number of dwelling units permitted per acre.
سؤال
Which of the following is a sediment-trapping structure?

A) Bulkheads
B) Groins
C) Revetments
D) None of the above
سؤال
Which of the following method is used for prioritizing actions using review of benefits and costs?

A) simple listing
B) relative rating
C) simple score
D) all of the above
سؤال
Chose the best answer to complete the following statement: In the United States, federally regulated lending institutions are required to disclose information to mortgage or other loan applicants whether their property is on a floodplain as shown on the Flood Insurance Rate Map (FIRM). But the requirement has to be met only _________ days prior to closing.

A) 5
B) 10
C) 15
D) 20
سؤال
Flood retrofitting measures known as 'floodproofing' can be done in two ways- dry and wet.
سؤال
Which of the following is not usually one of the causes of dam failure?

A) Structural failures
B) Storm events
C) Mechanical failures
D) Hydraulic failures
سؤال
Property acquisition, also known as 'buy out' is the most permanent form of mitigating hazards.
سؤال
What was the name of the hypothetical hurricane used as an exercise in 2004 to analyze the impact of catastrophic hurricanes striking the coast of Louisiana?

A) Hurricane Emily
B) Hurricane Sandy
C) Hurricane Pam
D) Hurricane Irene
سؤال
The ________________, pertains to the modern property law requires that private property owners to refrain from using the property in a way that interferes with the rights of adjoining property owners or cause injury to general public.

A) eminent domain
B) law of nuisance
C) zoning law
D) building codes
سؤال
Chose the best answer to complete the following statement: The ICC "model" building codes are updated every ________________ years to reflect the latest scientific and engineering principles.

A) three
B) four
C) five
D) six
سؤال
The most common criticism about the structural mitigation projects is that they are very expensive and most of them are technically difficult to build.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Mitigation Strategies for Natural Hazards
1
Levees can increase flooding in upstream or downstream by changing the natural flow and volume of a river
True
2
Chose the best answer to complete the following statement: Wetlands that are located at the edge of the deep water bodies function as a ________________.

A) overlay zone
B) hazard area
C) buffer zone
D) safe area
C
3
Which of the following is not a property protection mitigation measure?

A) Floodproofing
B) Windproofing
C) Seismic retrofit
D) Zoning
D
4
The International Code Council's (ICC) family of International Codes includes:

A) International Building Code (IBC)
B) International Residential Code (IRC)
C) International Existing Building Code (IEBC)
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
Reservoirs are located behind dams and reduce flooding by storing water during peak runoff periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
Capital Improvement Programs (CIP) are taken by federal government to implement large scale projects in the community such as schools, bridges, police stations, recreation centers, and other public facilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
The fifth amendment of the U.S. Constitution ensures that when government wants to purchase land from an individual, it must provide fair and just compensation for that property.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
In the United States, majority of the dams are not privately owned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
Select the answer below that best completes the following statement: Communities can require nonconforming structures to be replaced within a certain time as the former uses become illegal once the structures are replaced or destroyed. This process is called ________________.

A) Overlay zones
B) Mitigation
C) Amortization
D) Eminent Domain
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
In terms of zoning, one effective method is by down-zoning, which can be accomplished increasing the minimum lot size or reducing the number of dwelling units permitted per acre.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is a sediment-trapping structure?

A) Bulkheads
B) Groins
C) Revetments
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following method is used for prioritizing actions using review of benefits and costs?

A) simple listing
B) relative rating
C) simple score
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
Chose the best answer to complete the following statement: In the United States, federally regulated lending institutions are required to disclose information to mortgage or other loan applicants whether their property is on a floodplain as shown on the Flood Insurance Rate Map (FIRM). But the requirement has to be met only _________ days prior to closing.

A) 5
B) 10
C) 15
D) 20
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
Flood retrofitting measures known as 'floodproofing' can be done in two ways- dry and wet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following is not usually one of the causes of dam failure?

A) Structural failures
B) Storm events
C) Mechanical failures
D) Hydraulic failures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
Property acquisition, also known as 'buy out' is the most permanent form of mitigating hazards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
What was the name of the hypothetical hurricane used as an exercise in 2004 to analyze the impact of catastrophic hurricanes striking the coast of Louisiana?

A) Hurricane Emily
B) Hurricane Sandy
C) Hurricane Pam
D) Hurricane Irene
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
The ________________, pertains to the modern property law requires that private property owners to refrain from using the property in a way that interferes with the rights of adjoining property owners or cause injury to general public.

A) eminent domain
B) law of nuisance
C) zoning law
D) building codes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
Chose the best answer to complete the following statement: The ICC "model" building codes are updated every ________________ years to reflect the latest scientific and engineering principles.

A) three
B) four
C) five
D) six
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
The most common criticism about the structural mitigation projects is that they are very expensive and most of them are technically difficult to build.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.