Deck 13: Acquiring Information Systems and Applications

ملء الشاشة (f)
exit full mode
سؤال
The _____ approach to systems development uses specialized tools to automate many of the tasks in the systems development life cycle.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Computer-aided software engineering tools provide which of the following disadvantages?

A) produce initial systems that are more expensive to build and maintain
B) require more extensive and accurate definition of user requirements
C) difficult to customize
D) difficult to use with existing systems
E) all of the above
سؤال
An application service provider is a vendor who assembles the software needed by an enterprise and packages the software with outsourced development, operations, maintenance, and other services.
سؤال
Which of the following are advantages of the buy option for acquiring IS applications?

A) many different types of off-the-shelf software are available
B) software can be tried out
C) saves time
D) company will know what it is getting
E) all of the above
سؤال
The feasibility study addresses which of the following issues?

A) economic feasibility
B) technical feasibility
C) behavioral feasibility
D) all of the above
سؤال
Computer-aided software engineering tools provide which of the following advantages?

A) can produce systems with longer effective operational lives
B) can produce systems that more closely meet user requirements
C) can speed up the development process
D) can produce systems that are more adaptable to changing business conditions
E) all of the above
سؤال
The _____ is a set of long-range goals that describe the IT infrastructure and identify the major IT initiatives needed to achieve the goals of the organization.

A) IT operational plan
B) application portfolio
C) IT strategic plan
D) user information requirements
E) IT mission
سؤال
In joint application design, systems analysts interview or directly observe potential users of the new system individually to understand each user's needs.
سؤال
The IT planning process begins with an analysis of the organization's IT infrastructure.
سؤال
Evaluating the benefits of IT projects is more complex than evaluating their costs for which of the following reasons?

A) benefits are harder to quantify
B) benefits are often intangible
C) IT can be used for several different purposes
D) probability of obtaining a return from an IT investment is based on the probability of implementation success
E) all of the above
سؤال
The goals of the _____ are to link corporate strategy and IT strategy, approve the allocation of resources for the MIS function, and establish performance measures for the MIS function and see that they are met.

A) CEO
B) CIO
C) IT operational committee
D) IT steering committee
E) Board of Directors
سؤال
The _____ approach to systems development defines an initial list of user requirements, then develops the system in an iterative fashion.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
E) systems development life cycle
سؤال
Advantages of Rapid Application Development include which of the following?

A) active involvement of users in the development process
B) faster development process
C) system better meets user needs
D) reduction in training costs
E) all of the above
سؤال
The main advantage of rapid application development is the active involvement of users in the development process.
سؤال
A typical IS operational plan contains which of the following elements?

A) mission of the IS function
B) summary of the information needs of the functional areas and of the entire organization
C) IS function's estimate of its goals
D) application portfolio
E) all of the above
سؤال
Leasing can be attractive to small and medium-size organizations that cannot afford major investments in software.
سؤال
IT applications can be developed in which of the following ways?

A) build the system in-house
B) buy an application and install it
C) lease software from an application service provider
D) outsource it
E) all of the above
سؤال
____ feasibility determines if the hardware, software, and communications components can be developed and/or acquired to solve the business problem.

A) Technical
B) Economic
C) Organizational
D) Behavioral
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/18
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Acquiring Information Systems and Applications
1
The _____ approach to systems development uses specialized tools to automate many of the tasks in the systems development life cycle.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
A
2
Computer-aided software engineering tools provide which of the following disadvantages?

A) produce initial systems that are more expensive to build and maintain
B) require more extensive and accurate definition of user requirements
C) difficult to customize
D) difficult to use with existing systems
E) all of the above
E
3
An application service provider is a vendor who assembles the software needed by an enterprise and packages the software with outsourced development, operations, maintenance, and other services.
True
4
Which of the following are advantages of the buy option for acquiring IS applications?

A) many different types of off-the-shelf software are available
B) software can be tried out
C) saves time
D) company will know what it is getting
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
5
The feasibility study addresses which of the following issues?

A) economic feasibility
B) technical feasibility
C) behavioral feasibility
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
6
Computer-aided software engineering tools provide which of the following advantages?

A) can produce systems with longer effective operational lives
B) can produce systems that more closely meet user requirements
C) can speed up the development process
D) can produce systems that are more adaptable to changing business conditions
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
7
The _____ is a set of long-range goals that describe the IT infrastructure and identify the major IT initiatives needed to achieve the goals of the organization.

A) IT operational plan
B) application portfolio
C) IT strategic plan
D) user information requirements
E) IT mission
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
8
In joint application design, systems analysts interview or directly observe potential users of the new system individually to understand each user's needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
9
The IT planning process begins with an analysis of the organization's IT infrastructure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
10
Evaluating the benefits of IT projects is more complex than evaluating their costs for which of the following reasons?

A) benefits are harder to quantify
B) benefits are often intangible
C) IT can be used for several different purposes
D) probability of obtaining a return from an IT investment is based on the probability of implementation success
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
11
The goals of the _____ are to link corporate strategy and IT strategy, approve the allocation of resources for the MIS function, and establish performance measures for the MIS function and see that they are met.

A) CEO
B) CIO
C) IT operational committee
D) IT steering committee
E) Board of Directors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
12
The _____ approach to systems development defines an initial list of user requirements, then develops the system in an iterative fashion.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
E) systems development life cycle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
13
Advantages of Rapid Application Development include which of the following?

A) active involvement of users in the development process
B) faster development process
C) system better meets user needs
D) reduction in training costs
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
14
The main advantage of rapid application development is the active involvement of users in the development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
15
A typical IS operational plan contains which of the following elements?

A) mission of the IS function
B) summary of the information needs of the functional areas and of the entire organization
C) IS function's estimate of its goals
D) application portfolio
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
16
Leasing can be attractive to small and medium-size organizations that cannot afford major investments in software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
17
IT applications can be developed in which of the following ways?

A) build the system in-house
B) buy an application and install it
C) lease software from an application service provider
D) outsource it
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
18
____ feasibility determines if the hardware, software, and communications components can be developed and/or acquired to solve the business problem.

A) Technical
B) Economic
C) Organizational
D) Behavioral
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 18 في هذه المجموعة.