سؤال
Every project objective and every activity associated with that objective must be identified and sequenced.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Microsoft FrontPage is an example of an easy-to-use,end user website development tool.
سؤال
Systems analysts may recycle back at any time during the systems development cycle in order to modify and improve a system under development,but users do not.
سؤال
Some of the coolest stuff on the Web,such as streaming video,can't be accessed by most Web surfers.
سؤال
There is little that can be learned from studying the system that will be replaced.
سؤال
The resource allocation report contains information related to the difference between actual and planned project progress.
سؤال
"Shadow" IT is a culture where users install "rogue" software or tamper with existing software without the consent of the IT department.
سؤال
An RFQ is used as the basis for preparing a proposed purchase agreement.
سؤال
The danger of a technical feasibility study is finding technology that does not yet exist in a stable form.
سؤال
In a logical model,a person's inbox is treated just like a computer hard drive.
سؤال
In all cases,a preliminary feasibility assessment is a necessary step.
سؤال
According to the textbook case,IT departments are focusing too much on technology to solve a problem rather than on the problem itself.
سؤال
A well-designed system can survive an improperly-executed implementation.
سؤال
Analyzing the information needs of employees,customers,and other business stakeholders is done during the systems investigation stage of the application development life cycle.
سؤال
The application development capabilities built into a variety of software packages have made it easier for many users to develop their own computer-based solutions.
سؤال
Many Web sites have their own search engines,but very few are actually useful.
سؤال
The most basic protection against accidental lost or damage to end user files is to simply make backup copies on a frequent and systematic basis.
سؤال
User interface design is frequently a prototyping process with end user input.
سؤال
By creating a logical model,the various computer hardware components of a system can be incorporated,analyzed,and understood.
سؤال
The beginning of the end of a project is the implementation and installation of the project deliverables.
سؤال
Preventive maintenance activities involve changes to an existing system that are intended to improve the performance of a function or interface.
سؤال
According to the text case,some organizations using PPM simply end projects that go bad.
سؤال
The pilot conversion approach may be required if individual sites or locations have unique characteristics or idiosyncrasies that make a direct or parallel approach unfeasible.
سؤال
According to the text case,the success or failure of systems projects involving citizens and the democratic process is significantly determined by the political context.
سؤال
The parallel conversion approach takes the most time and,thus,creates the most disruption to the organization over time.
سؤال
Unless the operational costs of the new system are significantly less than the old system,the cost of parallel operation can be as much as four times greater than the old system alone.
سؤال
Direct conversion should be considered only in extreme circumstances,where no other conversion strategy is available.
سؤال
New systems can be designed to use existing data files,and that is normally the case.
سؤال
Other users are frequently the best source of the information needed to evaluate the claims of manufacturers and suppliers.
سؤال
Although having the advantage of low risk,the parallel conversion approach also brings with it the highest cost.
سؤال
Managers do not need to be trained on the new system as long as the end users have been trained.
سؤال
Improperly organized and formatted data are seldom found to be a major contributor to new system implementation failures.
سؤال
In a typical organization,more programmers and analysts are assigned to application maintenance activities than to application development.
سؤال
Systems integrators take over complete responsibility for an organization's computer facilities when an organization out-sources its computer operations.
سؤال
With a pilot conversion,the old and new systems are run simultaneously until the end users and project coordinators are fully satisfied that the new system is functioning correctly and the old system is no longer necessary.
سؤال
These days,evaluating hardware is pretty much limited to speed and pricing.
سؤال
Installing a new application may require converting the data elements in databases that are affected by the new application into new formats.
سؤال
Systems integrators specialize in providing industry-specific hardware,software,and services from selected manufacturers.
سؤال
The performance of hardware and software can nearly always be determined by obtaining and reading the documentation and case studies supplied by hardware and software suppliers.
سؤال
Pilot conversion may be the best choice in situations where an automated system is replacing a manual one.
سؤال
The operational feasibility assessment focuses on which of the following factors?

A)How well the proposed system supports the business priorities of the organization.
B)Cost savings.
C)Hardware,software,and network capability,reliability,and availability.
D)Patent,copyright,and licensing.
سؤال
A feasibility study will answer all of the following questions except:

A)Does the technology exist that is necessary to implement the proposed system?
B)Is the proposed system technologically,economically,and operationally feasible?
C)Which brand and model of computer will be used by the proposed system?
D)What impact will the proposed system have on current employees?
سؤال
Which of the following is an example of an intangible cost?

A)Employee salaries
B)Loss of customer goodwill
C)Reduced inventory-carrying costs
D)Improved customer service
سؤال
Systems thinking means that an individual sees:

A)Inter-relationships among systems and processes
B)Discrete snapshots of change,whenever it occurs
C)Linear cause-and-effects when events occur
D)All of the choices are correct.
سؤال
Which of the following are done during the systems design stage of application development?

A)Develop logical models of the current system.
B)Acquire or develop hardware and software.
C)Convert to the new business system.
D)Develop logical models of the new system.
سؤال
The overall process by which information systems are designed and implemented within organizations is referred to as systems _______________.

A)design
B)analysis
C)analysis and design
D)implementation
سؤال
Which of the following are done during the systems maintenance stage of application development?

A)Use a postimplementation review process to monitor,evaluate,and modify the business system as needed.
B)Acquire or develop hardware and software.
C)Convert to the new business system.
D)Develop logical models of the new system.
سؤال
A feasibility study is a preliminary study to investigate the information needs of prospective users and is used to determine the proposed system's _______________.

A)resource requirements
B)costs and benefits
C)feasibility
D)All of the choices are correct.
سؤال
The _______________ feasibility assessment focuses on the degree to which the proposed development project fits with the existing business environment and objectives,with regard to development schedule,delivery date,corporate culture,and existing business processes.

A)technical
B)legal/political
C)economic
D)operational
سؤال
Which of the following correctly reflects the stages of the system development life cycle?

A)Investigation,analysis,implementation,and maintenance
B)Analysis,design,and implementation
C)Investigation,analysis,design,implementation,and maintenance
D)Investigation,prototyping,design,conversion,and change management
سؤال
The legal/political feasibility assessment focuses on all of the following factors,except:

A)Affected stakeholders and reporting authority.
B)Cost/benefit analysis.
C)Governmental restrictions.
D)Patent,copyright,and licensing.
سؤال
Economic feasibility is concerned with:

A)How well a proposed information system supports the objectives of the organization and its strategic plan for information systems
B)Whether expected cost savings,increased revenue,increased profits,reductions in required investment,and other types of benefits will exceed the cost of developing and operating a proposed system
C)Determining if reliable hardware and software capable of meeting the needs of a proposed system can be acquired or developed by the business in the required time
D)The willingness and ability of management,employees,customers,suppliers,and others to operate,use,and support a proposed system
سؤال
The human factors feasibility assessment focuses on which of the following factors?

A)How well the proposed system supports the business priorities of the organization.
B)Cost/benefit analysis.
C)Governmental restrictions.
D)Management support.
سؤال
Which category of feasibility study focuses on determining if reliable hardware and software,capable of meeting the needs of a proposed system,can be acquired or developed in the required time?

A)Economic
B)Operational
C)Technical
D)Legal/political
سؤال
Which of the following are done during the systems analysis stage of application development?

A)Develop a project management plan and obtain management approval.
B)Analyze the information needs of employees,customers,and other business stakeholders.
C)Convert to the new business system.
D)Manage the effects of system changes on end users.
سؤال
All of the following would be a focus of a human factors feasibility study except:

A)Acceptance by employees
B)How well a proposed system fits the company plans
C)Customer and supplier acceptance
D)All of the choices are factors in human factors feasibility.
سؤال
All of the following are done during the systems implementation stage of application development except:

A)Develop logical models of the current system.
B)Acquire or develop hardware and software.
C)Convert to the new business system.
D)Manage the effects of system changes on end users.
سؤال
Which of the following are done during the systems investigation stage of application development?

A)Develop logical models of new system.
B)Analyze the information needs of employees,customers,and other business stakeholders.
C)Develop a project management plan and obtain management approval.
D)Manage the effects of system changes on end users.
سؤال
Determining whether expected cost savings,increased profits,and other benefits exceed the cost of developing and operating a system is related to _______________ feasibility.

A)economic
B)functional
C)operational
D)system
سؤال
The economic feasibility assessment focuses on all of the following factors,except:

A)Decreased investment requirements.
B)Cost/benefit analysis.
C)Governmental restrictions.
D)Increased revenue.
سؤال
No matter what the project,all of the following elements are necessary except:

A)Prototypes
B)Process
C)Tools
D)Techniques
سؤال
According to the text,all projects must deal with constraints,which is another term for _______________.

A)Corrections
B)Revisions
C)Limitations
D)None of the choices are correct
سؤال
Prototyping involves:

A)A standard systems development cycle using CASE tools
B)The rapid generation of a system by IS professionals,without the need for end user input
C)An iterative,interactive development process with extensive end user involvement
D)A fail-safe development process designed to ensure that an information system meets all user requirements,without revision
سؤال
The acronym RFP stands for:

A)Request for pricing
B)Request for proposal
C)Request for flat pricing
D)Request for fixed pricing
سؤال
Which of the following statements most accurately applies to the concept of prototyping?

A)Prototyping is not practical for large-scale projects
B)Prototyping produces an actual working model of the information system needed by users
C)Prototyping emphasizes getting the design right the first time
D)Prototyping reduces the need for user involvement in systems development
سؤال
Why are business end users frequently added to system development teams?

A)They have the greatest stake in a successful product
B)They know a lot about the business activities that affect the company's business processes
C)They are usually experienced in IS development
D)They are the most likely to eliminate unnecessary documentation and steps
سؤال
Which of the following statements applies to end user development?

A)IS professionals play a consulting role,while end users do their own application development.
B)Users act as consultants,directing the IS professionals who do the actual work.
C)End users are responsible for outsourcing their needs to outside firms which do the actual work instead of the overworked IS department.
D)None of the choices are correct.
سؤال
During the physical design stage,users and analysts focus on determining __________ the system will accomplish its objectives.

A)how
B)when
C)where
D)All of the choices are correct.
سؤال
The most important objective to achieve during the _______________ phase is the clear and succinct statement of the problem that the project is to solve,or the goals that it is to achieve.

A)initiating/defining
B)planning
C)executing
D)controlling
سؤال
When a company needs to evaluate competing proposals for hardware or software acquisition:

A)Each evaluation factor is assigned an equal weight
B)Each evaluation factor is assigned a different number of points,depending on its importance to the company
C)The lowest bid is always the ultimate selection factor
D)Only three things matter: cost,performance,and support
سؤال
User interface design refers to the development of:

A)Programs and procedures to be used by end-users
B)Display screens,forms and reports,and interactive computer user dialogs
C)User training manuals
D)The structure of databases and files accessible by end users
سؤال
All of the following are activities performed during the initiating/defining project management phase except:

A)Stating the problems/goals
B)Securing resources
C)Writing a detailed project plan
D)Exploring costs/benefits with a feasibility study
سؤال
A logical model of a current system is a blueprint of:

A)How the current system does what it does
B)What the current system does,without regard to how it does it
C)What the system does and how it does it
D)Documentation of what the new system will look like and how it will work
سؤال
Which of the following activities would normally be performed during the closing project management phase?

A)Document the project
B)Establish reporting obligations
C)Compare actual progress with baseline
D)Initiate control interventions,if necessary
سؤال
The systems implementation stage of application development involves:

A)Hardware and software acquisition
B)Conversion of data resources
C)Testing of programs and procedures
D)All of the choices are correct.
سؤال
Which of the following is a function of the systems analysis stage?

A)Conducting a feasibility study
B)Developing the functional requirements of the system
C)Writing program code
D)Data conversion
سؤال
Fast retrieval and update of data from product,pricing,and customer databases is an example of a _______________ requirement.

A)user interface
B)processing
C)control
D)storage
سؤال
In analyzing a potential application,you should focus first on the _______________ to be produced by the application.

A)input
B)processing
C)storage
D)output
سؤال
Control measures for end user applications vary greatly depending upon the:

A)Number and nature of the users of the application
B)Scope and duration of the application
C)Nature of the data involved
D)All of the choices are correct.
سؤال
All of the following would be a focus of a legal/political feasibility study except:

A)Copyright or patent infringements
B)Links to grassroots political parties
C)Identifying the key stakeholders and the degree to which the proposed system may affect the distribution of power
D)Existing contractual obligations
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/111
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Enterprise Resource Planning and Collaboration Systems
1
Every project objective and every activity associated with that objective must be identified and sequenced.
True
2
Microsoft FrontPage is an example of an easy-to-use,end user website development tool.
True
3
Systems analysts may recycle back at any time during the systems development cycle in order to modify and improve a system under development,but users do not.
False
4
Some of the coolest stuff on the Web,such as streaming video,can't be accessed by most Web surfers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
5
There is little that can be learned from studying the system that will be replaced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
6
The resource allocation report contains information related to the difference between actual and planned project progress.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
7
"Shadow" IT is a culture where users install "rogue" software or tamper with existing software without the consent of the IT department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
8
An RFQ is used as the basis for preparing a proposed purchase agreement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
9
The danger of a technical feasibility study is finding technology that does not yet exist in a stable form.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
10
In a logical model,a person's inbox is treated just like a computer hard drive.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
11
In all cases,a preliminary feasibility assessment is a necessary step.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
12
According to the textbook case,IT departments are focusing too much on technology to solve a problem rather than on the problem itself.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
13
A well-designed system can survive an improperly-executed implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
14
Analyzing the information needs of employees,customers,and other business stakeholders is done during the systems investigation stage of the application development life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
15
The application development capabilities built into a variety of software packages have made it easier for many users to develop their own computer-based solutions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
16
Many Web sites have their own search engines,but very few are actually useful.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
17
The most basic protection against accidental lost or damage to end user files is to simply make backup copies on a frequent and systematic basis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
18
User interface design is frequently a prototyping process with end user input.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
19
By creating a logical model,the various computer hardware components of a system can be incorporated,analyzed,and understood.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
20
The beginning of the end of a project is the implementation and installation of the project deliverables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
21
Preventive maintenance activities involve changes to an existing system that are intended to improve the performance of a function or interface.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
22
According to the text case,some organizations using PPM simply end projects that go bad.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
23
The pilot conversion approach may be required if individual sites or locations have unique characteristics or idiosyncrasies that make a direct or parallel approach unfeasible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
24
According to the text case,the success or failure of systems projects involving citizens and the democratic process is significantly determined by the political context.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
25
The parallel conversion approach takes the most time and,thus,creates the most disruption to the organization over time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
26
Unless the operational costs of the new system are significantly less than the old system,the cost of parallel operation can be as much as four times greater than the old system alone.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
27
Direct conversion should be considered only in extreme circumstances,where no other conversion strategy is available.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
28
New systems can be designed to use existing data files,and that is normally the case.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
29
Other users are frequently the best source of the information needed to evaluate the claims of manufacturers and suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
30
Although having the advantage of low risk,the parallel conversion approach also brings with it the highest cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
31
Managers do not need to be trained on the new system as long as the end users have been trained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
32
Improperly organized and formatted data are seldom found to be a major contributor to new system implementation failures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
33
In a typical organization,more programmers and analysts are assigned to application maintenance activities than to application development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
34
Systems integrators take over complete responsibility for an organization's computer facilities when an organization out-sources its computer operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
35
With a pilot conversion,the old and new systems are run simultaneously until the end users and project coordinators are fully satisfied that the new system is functioning correctly and the old system is no longer necessary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
36
These days,evaluating hardware is pretty much limited to speed and pricing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
37
Installing a new application may require converting the data elements in databases that are affected by the new application into new formats.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
38
Systems integrators specialize in providing industry-specific hardware,software,and services from selected manufacturers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
39
The performance of hardware and software can nearly always be determined by obtaining and reading the documentation and case studies supplied by hardware and software suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
40
Pilot conversion may be the best choice in situations where an automated system is replacing a manual one.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
41
The operational feasibility assessment focuses on which of the following factors?

A)How well the proposed system supports the business priorities of the organization.
B)Cost savings.
C)Hardware,software,and network capability,reliability,and availability.
D)Patent,copyright,and licensing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
42
A feasibility study will answer all of the following questions except:

A)Does the technology exist that is necessary to implement the proposed system?
B)Is the proposed system technologically,economically,and operationally feasible?
C)Which brand and model of computer will be used by the proposed system?
D)What impact will the proposed system have on current employees?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is an example of an intangible cost?

A)Employee salaries
B)Loss of customer goodwill
C)Reduced inventory-carrying costs
D)Improved customer service
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
44
Systems thinking means that an individual sees:

A)Inter-relationships among systems and processes
B)Discrete snapshots of change,whenever it occurs
C)Linear cause-and-effects when events occur
D)All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following are done during the systems design stage of application development?

A)Develop logical models of the current system.
B)Acquire or develop hardware and software.
C)Convert to the new business system.
D)Develop logical models of the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
46
The overall process by which information systems are designed and implemented within organizations is referred to as systems _______________.

A)design
B)analysis
C)analysis and design
D)implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following are done during the systems maintenance stage of application development?

A)Use a postimplementation review process to monitor,evaluate,and modify the business system as needed.
B)Acquire or develop hardware and software.
C)Convert to the new business system.
D)Develop logical models of the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
48
A feasibility study is a preliminary study to investigate the information needs of prospective users and is used to determine the proposed system's _______________.

A)resource requirements
B)costs and benefits
C)feasibility
D)All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
49
The _______________ feasibility assessment focuses on the degree to which the proposed development project fits with the existing business environment and objectives,with regard to development schedule,delivery date,corporate culture,and existing business processes.

A)technical
B)legal/political
C)economic
D)operational
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following correctly reflects the stages of the system development life cycle?

A)Investigation,analysis,implementation,and maintenance
B)Analysis,design,and implementation
C)Investigation,analysis,design,implementation,and maintenance
D)Investigation,prototyping,design,conversion,and change management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
51
The legal/political feasibility assessment focuses on all of the following factors,except:

A)Affected stakeholders and reporting authority.
B)Cost/benefit analysis.
C)Governmental restrictions.
D)Patent,copyright,and licensing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
52
Economic feasibility is concerned with:

A)How well a proposed information system supports the objectives of the organization and its strategic plan for information systems
B)Whether expected cost savings,increased revenue,increased profits,reductions in required investment,and other types of benefits will exceed the cost of developing and operating a proposed system
C)Determining if reliable hardware and software capable of meeting the needs of a proposed system can be acquired or developed by the business in the required time
D)The willingness and ability of management,employees,customers,suppliers,and others to operate,use,and support a proposed system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
53
The human factors feasibility assessment focuses on which of the following factors?

A)How well the proposed system supports the business priorities of the organization.
B)Cost/benefit analysis.
C)Governmental restrictions.
D)Management support.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which category of feasibility study focuses on determining if reliable hardware and software,capable of meeting the needs of a proposed system,can be acquired or developed in the required time?

A)Economic
B)Operational
C)Technical
D)Legal/political
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following are done during the systems analysis stage of application development?

A)Develop a project management plan and obtain management approval.
B)Analyze the information needs of employees,customers,and other business stakeholders.
C)Convert to the new business system.
D)Manage the effects of system changes on end users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
56
All of the following would be a focus of a human factors feasibility study except:

A)Acceptance by employees
B)How well a proposed system fits the company plans
C)Customer and supplier acceptance
D)All of the choices are factors in human factors feasibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
57
All of the following are done during the systems implementation stage of application development except:

A)Develop logical models of the current system.
B)Acquire or develop hardware and software.
C)Convert to the new business system.
D)Manage the effects of system changes on end users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following are done during the systems investigation stage of application development?

A)Develop logical models of new system.
B)Analyze the information needs of employees,customers,and other business stakeholders.
C)Develop a project management plan and obtain management approval.
D)Manage the effects of system changes on end users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
59
Determining whether expected cost savings,increased profits,and other benefits exceed the cost of developing and operating a system is related to _______________ feasibility.

A)economic
B)functional
C)operational
D)system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
60
The economic feasibility assessment focuses on all of the following factors,except:

A)Decreased investment requirements.
B)Cost/benefit analysis.
C)Governmental restrictions.
D)Increased revenue.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
61
No matter what the project,all of the following elements are necessary except:

A)Prototypes
B)Process
C)Tools
D)Techniques
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
62
According to the text,all projects must deal with constraints,which is another term for _______________.

A)Corrections
B)Revisions
C)Limitations
D)None of the choices are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
63
Prototyping involves:

A)A standard systems development cycle using CASE tools
B)The rapid generation of a system by IS professionals,without the need for end user input
C)An iterative,interactive development process with extensive end user involvement
D)A fail-safe development process designed to ensure that an information system meets all user requirements,without revision
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
64
The acronym RFP stands for:

A)Request for pricing
B)Request for proposal
C)Request for flat pricing
D)Request for fixed pricing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
65
Which of the following statements most accurately applies to the concept of prototyping?

A)Prototyping is not practical for large-scale projects
B)Prototyping produces an actual working model of the information system needed by users
C)Prototyping emphasizes getting the design right the first time
D)Prototyping reduces the need for user involvement in systems development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
66
Why are business end users frequently added to system development teams?

A)They have the greatest stake in a successful product
B)They know a lot about the business activities that affect the company's business processes
C)They are usually experienced in IS development
D)They are the most likely to eliminate unnecessary documentation and steps
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following statements applies to end user development?

A)IS professionals play a consulting role,while end users do their own application development.
B)Users act as consultants,directing the IS professionals who do the actual work.
C)End users are responsible for outsourcing their needs to outside firms which do the actual work instead of the overworked IS department.
D)None of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
68
During the physical design stage,users and analysts focus on determining __________ the system will accomplish its objectives.

A)how
B)when
C)where
D)All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
69
The most important objective to achieve during the _______________ phase is the clear and succinct statement of the problem that the project is to solve,or the goals that it is to achieve.

A)initiating/defining
B)planning
C)executing
D)controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
70
When a company needs to evaluate competing proposals for hardware or software acquisition:

A)Each evaluation factor is assigned an equal weight
B)Each evaluation factor is assigned a different number of points,depending on its importance to the company
C)The lowest bid is always the ultimate selection factor
D)Only three things matter: cost,performance,and support
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
71
User interface design refers to the development of:

A)Programs and procedures to be used by end-users
B)Display screens,forms and reports,and interactive computer user dialogs
C)User training manuals
D)The structure of databases and files accessible by end users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
72
All of the following are activities performed during the initiating/defining project management phase except:

A)Stating the problems/goals
B)Securing resources
C)Writing a detailed project plan
D)Exploring costs/benefits with a feasibility study
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
73
A logical model of a current system is a blueprint of:

A)How the current system does what it does
B)What the current system does,without regard to how it does it
C)What the system does and how it does it
D)Documentation of what the new system will look like and how it will work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following activities would normally be performed during the closing project management phase?

A)Document the project
B)Establish reporting obligations
C)Compare actual progress with baseline
D)Initiate control interventions,if necessary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
75
The systems implementation stage of application development involves:

A)Hardware and software acquisition
B)Conversion of data resources
C)Testing of programs and procedures
D)All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
76
Which of the following is a function of the systems analysis stage?

A)Conducting a feasibility study
B)Developing the functional requirements of the system
C)Writing program code
D)Data conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
77
Fast retrieval and update of data from product,pricing,and customer databases is an example of a _______________ requirement.

A)user interface
B)processing
C)control
D)storage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
78
In analyzing a potential application,you should focus first on the _______________ to be produced by the application.

A)input
B)processing
C)storage
D)output
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
79
Control measures for end user applications vary greatly depending upon the:

A)Number and nature of the users of the application
B)Scope and duration of the application
C)Nature of the data involved
D)All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
80
All of the following would be a focus of a legal/political feasibility study except:

A)Copyright or patent infringements
B)Links to grassroots political parties
C)Identifying the key stakeholders and the degree to which the proposed system may affect the distribution of power
D)Existing contractual obligations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.