Deck 9: Multicriteria Decision Making

ملء الشاشة (f)
exit full mode
سؤال
The different objectives in a goal programming problem are referred to as goals.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A negative deviational variable is the amount by which a goal level is exceeded.
سؤال
The objective function in a goal programming model seeks to minimize the deviation from goals in the order of the goal priorities.
سؤال
One goal is never achieved at the expense of another higher-priority goal.
سؤال
All goal constraints are inequalities that include deviational variables.
سؤال
Goal programming solutions do not always achieve all goals.
سؤال
A pairwise comparison matrix summarizes the pairwise comparisons for a criterion.
سؤال
Goal constraints can include all deviational variables.
سؤال
Objective function terms are not summed in goal programming because not all goals are achievable.
سؤال
Goal programming provides a method for simultaneously striving to achieve several objectives.
سؤال
A goal can be achieved at the expense of another lower-priority goal.
سؤال
In a pairwise comparison, two alternatives are compared according to a criterion and one is preferred.
سؤال
In goal programming, terms are summed in the objective function in order to make consistent decisions.
سؤال
In a goal programming model, the terms in the objective function are summed to determine the maximum profit or minimum cost.
سؤال
A preference scale assigns numerical values to different levels of preference.
سؤال
At least one or both deviational variables in a goal constraint must equal 0.
سؤال
A requirement for the solution procedure for the goal programming problem is that all goals must be achieved.
سؤال
Goal programming violates the divisibility property of linear programming.
سؤال
In goal programming, problems cannot have two or more goals at the same priority level.
سؤال
On a preference scale for pairwise comparisons, the number "1" indicates that two objects are equally preferred.
سؤال
A ________ vector is the average of the values in each row of the normalized matrix in the AHP process.
سؤال
The analytic hierarchy process, scoring models, and goal programming are all considered to be ________ decision making techniques because they incorporate decisions based on more than one objective.
سؤال
A(n) ________ model is a similar to AHP, but simpler and easier to understand.
سؤال
A consistency index measures the degree of inconsistency in pairwise comparisons.
سؤال
In synthesization, decision alternatives are prioritized within each criterion.
سؤال
A preference scale assigns numerical values to different levels of preferences.
سؤال
At least one or both deviational variables in a goal constraint must equal ________.
سؤال
A(n) ________ measures the degree of inconsistency in pairwise comparisons.
سؤال
A(n) ________ variable is the amount by which a goal level is exceeded.
سؤال
If the CI/RI ratio is more than ________, then there are probably serious inconsistencies in the AHP results.
سؤال
A(n) ________ variable is the amount by which a goal level is underachieved.
سؤال
Consider the following constraint: 2x1 + 3x2 =60. Assume that we convert this constraint into a goal constraint with the value of x1 = 15 and the value of x2 = 15. Then the values of d1+ and d1- are ________ and ________, respectively.
سؤال
In a facility location problem, if location A receives a score of 45 for the criteria "traffic congestion", which has a weight of .30; a score of 50 for the criteria "labor force", which has a weight of .45; and a score of 60 for "utilities", which has a weight of .25, the overall score for location A is ________.
سؤال
A(n) ________ assigns numerical values to different levels of preferences.
سؤال
In a given AHP problem, the consistency index is .15, and the random index is .90. In this instance, there are probably serious inconsistencies and, therefore, the AHP result may not be meaningful.
سؤال
A scoring model is more subjective than the analytical hierarchy process.
سؤال
Scoring models use consistency indexes to measure the degree of consistency between choices.
سؤال
Deviational variables that occur in the objective function and the constraints of a goal programming model indicate the difference between all actual and ________ values.
سؤال
In scoring models, the two alternatives with the highest scores are compared to make the final decision.
سؤال
The objective function formulation for a goal programming model is as follows:
Min P1 d1 -, P2 d2 -, P3 d1 +, P4 d3 -
Which one of the variables would the program designers like to have as the second goal such that its deviation from zero is minimized?
سؤال
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the profit constraint?
سؤال
An investor has $80,000 to invest in three stocks, stock A costs $100, stock B costs $120 and stock C costs $80. Each stock A has a risk factor of 8, each stock B has a risk factor of 10 and each stock C has a risk factor of 7. The investor believes that the sum of the risk factors for all stocks purchase should not exceed 6000. The projected annual growth rate for the three stocks are 9%, 13% and 8% respectively. The projected annual dividend income from these stocks are as follows: Stock A: $14/stock, Stock B: $15/stock, and Stock C: $20/stock. The investor desires an annual dividend income of $10,000. The investor has established the following goals in order of their importance:

(1) The investor believes that the budget cannot be exceeded. (d1)
(2) The risk factor should not exceed the target amount of 6000. (d2)
(3) The average annual growth rate in stock prices must be at least 10%. (d3)
(4) The investor desires a dividend income of at least $10,000. (d4)


-Write the risk factor constraint
سؤال
Using the normalized matrix given below, calculate the row averages. Using the normalized matrix given below, calculate the row averages.  <div style=padding-top: 35px>
سؤال
Assume that a decision maker using analytical hierarchy process generated the following pairwise comparison matrix. Assume that a decision maker using analytical hierarchy process generated the following pairwise comparison matrix.   Calculate the normalized matrix.<div style=padding-top: 35px>
Calculate the normalized matrix.
سؤال
Assume that a plant manager has to decide where to locate its warehouse. The decision has been narrowed down to choices among the following three cities: Detroit, Cleveland, and St. Louis. The following pairwise comparison matrix summarizes the preferences of the plant manager.
Assume that a plant manager has to decide where to locate its warehouse. The decision has been narrowed down to choices among the following three cities: Detroit, Cleveland, and St. Louis. The following pairwise comparison matrix summarizes the preferences of the plant manager.   Determine the normalized matrix.<div style=padding-top: 35px>
Determine the normalized matrix.
سؤال
A production of 300 units of Twiddle Bugs, an educational toy for children, must be completed within 1 week by BugU Manufacturing. Two production lines are available, each for 30 hours during the week. Production line 1 can produce five units per hour and production line 2 can produce four units an hour. Line 1 costs $50 per hour to operate and line 2 costs $55 per hour. Overtime is available for line 1 at $15 per hour and for line 2 at $12 per hour. Management goals in decreasing order are:
P1: Produce 300 units.
P2: Maximum allowable overtime of 6 hours for line 1.
P3: Cost of overtime must not exceed $750.
P4: Avoid the underutilization of either production line. Assign weights that are proportional to their production capability.
P5: Producing more than 300 units is 1-1/2 times as undesirable as producing under 300 units.

-What are the constraints for this problem?
سؤال
Assume that a plant manager has to decide where to locate its warehouse The decision has been narrowed down to choices among the following three cities: Detroit,, Cleveland, and St. Louis. The company has weighted each of these criteria in terms of its relative importance in the decision making process, and it has analyzed each potential warehouse location and graded them according to each criteria as shown in the following table.
Assume that a plant manager has to decide where to locate its warehouse The decision has been narrowed down to choices among the following three cities: Detroit,, Cleveland, and St. Louis. The company has weighted each of these criteria in terms of its relative importance in the decision making process, and it has analyzed each potential warehouse location and graded them according to each criteria as shown in the following table.   Calculate the scores for each location and state where the warehouse should be located.<div style=padding-top: 35px>
Calculate the scores for each location and state where the warehouse should be located.
سؤال
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the packaging material constraint?
سؤال
An investor has $80,000 to invest in three stocks, stock A costs $100, stock B costs $120 and stock C costs $80. Each stock A has a risk factor of 8, each stock B has a risk factor of 10 and each stock C has a risk factor of 7. The investor believes that the sum of the risk factors for all stocks purchase should not exceed 6000. The projected annual growth rate for the three stocks are 9%, 13% and 8% respectively. The projected annual dividend income from these stocks are as follows: Stock A: $14/stock, Stock B: $15/stock, and Stock C: $20/stock. The investor desires an annual dividend income of $10,000. The investor has established the following goals in order of their importance:

(1) The investor believes that the budget cannot be exceeded. (d1)
(2) The risk factor should not exceed the target amount of 6000. (d2)
(3) The average annual growth rate in stock prices must be at least 10%. (d3)
(4) The investor desires a dividend income of at least $10,000. (d4)


-State the goal programming objective function.
سؤال
The analytical hierarchy process was used to determine which car to purchase. Four criteria were used: price, miles per gallon, comfort, and durability. Consider the following normalized matrix and the preference vector for durability.                            Durability Matrix           Preference  Car A  Car B  Car C  Vector  Car A 10.2540.36 Car B 410.50.59 Car C 0.252.001.000.41~~~~~~~~~~~~~~~~~~~~~~~~~~{ \text { Durability Matrix } } ~~~~~~~~~ \text { Preference } \\\begin{array} { l c c c c } & \text { Car A } & \text { Car B } & \text { Car C } & \text { Vector } \\\hline \text { Car A } & 1 & 0.25 & 4 & 0.36 \\\text { Car B } & 4 & 1 & 0.5 & 0.59 \\\text { Car C } & 0.25 & 2.00 & 1.00 & 0.41 \\\hline\end{array}
Multiplying the normalized matrix by the preference vector gives the following results:
2.172.261.69\begin{array} { | l | } \hline 2.17 \\\hline 2.26 \\\hline 1.69 \\\hline\end{array}
Compute the consistency index.
سؤال
Assume that a decision maker has to make a choice between three types of cars. Chevy, Honda, and Ford. Based on three criteria: comfort, MPG, and style.
The row averages for criteria is summarized in the following column vector: Assume that a decision maker has to make a choice between three types of cars. Chevy, Honda, and Ford. Based on three criteria: comfort, MPG, and style. The row averages for criteria is summarized in the following column vector:   The preference matrix for the three types of cars is given as follows:   Compute the overall score for each decision alternative (car).<div style=padding-top: 35px>
The preference matrix for the three types of cars is given as follows: Assume that a decision maker has to make a choice between three types of cars. Chevy, Honda, and Ford. Based on three criteria: comfort, MPG, and style. The row averages for criteria is summarized in the following column vector:   The preference matrix for the three types of cars is given as follows:   Compute the overall score for each decision alternative (car).<div style=padding-top: 35px>
Compute the overall score for each decision alternative (car).
سؤال
The objective function formulation for a goal programming model is as follows:
Min P1 d1 -, P2 d2 -, (4 P4 d3 - + 6P4 d2 +)
At the priority level 4, which one of the deviational variables is most important?
سؤال
A production of 300 units of Twiddle Bugs, an educational toy for children, must be completed within 1 week by BugU Manufacturing. Two production lines are available, each for 30 hours during the week. Production line 1 can produce five units per hour and production line 2 can produce four units an hour. Line 1 costs $50 per hour to operate and line 2 costs $55 per hour. Overtime is available for line 1 at $15 per hour and for line 2 at $12 per hour. Management goals in decreasing order are:
P1: Produce 300 units.
P2: Maximum allowable overtime of 6 hours for line 1.
P3: Cost of overtime must not exceed $750.
P4: Avoid the underutilization of either production line. Assign weights that are proportional to their production capability.
P5: Producing more than 300 units is 1-1/2 times as undesirable as producing under 300 units.

-What is the objective function?
سؤال
An investor has $80,000 to invest in three stocks, stock A costs $100, stock B costs $120 and stock C costs $80. Each stock A has a risk factor of 8, each stock B has a risk factor of 10 and each stock C has a risk factor of 7. The investor believes that the sum of the risk factors for all stocks purchase should not exceed 6000. The projected annual growth rate for the three stocks are 9%, 13% and 8% respectively. The projected annual dividend income from these stocks are as follows: Stock A: $14/stock, Stock B: $15/stock, and Stock C: $20/stock. The investor desires an annual dividend income of $10,000. The investor has established the following goals in order of their importance:

(1) The investor believes that the budget cannot be exceeded. (d1)
(2) The risk factor should not exceed the target amount of 6000. (d2)
(3) The average annual growth rate in stock prices must be at least 10%. (d3)
(4) The investor desires a dividend income of at least $10,000. (d4)


-Write the budget constraint
سؤال
Centerville city council is in the process of developing city tax rates. The annual tax base for real estate property is $750 million and for general sales, $80 million. Annual local gas consumption is estimated at 12 million gallons. They have three goals, listed in order of priority:
1. Tax revenues must be at least $25 million to meet the city's financial commitments.
2. Sales tax cannot exceed 25% of all taxes collected.
3. Gasoline tax cannot exceed 8 cents per gallon.
Formulate as a goal programming problem.
سؤال
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the objective function?
سؤال
A business is trying to decide which restaurant to hold its annual awards banquet. Use the information below to determine the best choice.
Restaurant
A business is trying to decide which restaurant to hold its annual awards banquet. Use the information below to determine the best choice. Restaurant  <div style=padding-top: 35px>
سؤال
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the production time constraint?
سؤال
Consider the following normalized matrix for car comfort that was computed using the analytical hierarchy process:
Consider the following normalized matrix for car comfort that was computed using the analytical hierarchy process:   Which car is the most preferred based on comfort?<div style=padding-top: 35px>
Which car is the most preferred based on comfort?
سؤال
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the fabric constraint?
سؤال
Deviational variables in a goal programming model constraint represent the

A) underachievement or overachievement of a goal level.
B) resource constraint as defined by the linear model.
C) probability of an optimal solution.
D) probabilistic variables in the objective constraints.
سؤال
The objective function in a goal programming model seeks to ________ the deviation from goals in the order of the goal priorities.

A) free
B) even out
C) maximize
D) minimize
سؤال
Consider the following constraint: 2x1 + 3x2 =60. Assume that we convert this constraint into a goal constraint with the value of x1 = 15 and the value of x2 = 15. Then the values of d1+ and d1- are ________ and ________, respectively.

A) 0, 15
B) 15, 0
C) 20, 0
D) 0, 20
سؤال
Goal constraints can include ________ deviational variables.

A) no
B) some
C) all
D) multiple
سؤال
A ________ deviational variable is the amount by which a goal level is underachieved.

A) negative
B) positive
C) positive or negative
D) positive and negative
سؤال
Deviation variables

A) represent the actual value of the function part of a goal constraint.
B) represent the difference between the target and actual values.
C) must sum to 1.
D) equal the difference between actual and predicted values of the decision variables.
سؤال
Two or more goals at the same priority level can be assigned weights to indicate their relative

A) meaning.
B) slack.
C) difference.
D) importance.
سؤال
A decision with more than one objective

A) should be decomposed into a separate model for each objective .
B) depends on the probability of satisfying each objective.
C) requires the decision maker to put the objectives in some order of importance.
D) cannot have an optimal solution.
سؤال
The objective function min P1d1- , P2d2+

A) attempts to avoid being below target for the priority 1 goal.
B) attempts to avoid being below target for the priority 2 goal.
C) will not have any feasible solutions.
D) will have a solution only if P1 > P2.
سؤال
Goal programming solutions ________ achieve all goals.

A) always
B) don't always
C) sometimes
D) never
سؤال
If the constraint 3x1 + 4x2 + (d1-) - (d1+) = 250 measures hours, then

A) 3x1 + 4x2 is equal to the actual time spent.
B) if d1- is equal to 25, then 3x1 + 4x2 must equal 25.
C) overtime could be represented by d1-.
D) hours can take only an integer value.
سؤال
A company has three goals, listed in order of importance.
1) Achieve a total profit of at least $240 million.
2) Maintain the current employment level of 3,000 employees
3) Invest no more than $70 million in capital.
What is the objective function for a goal program for this situation?

A) Min P1d1- , P2d2- , P3d3+
B) Min P1d1- , P2d2+ , P2d2- , P3d3-
C) Min P1d1- , P2d2- , P2d2- , P3d3+
D) Min P1d1+ , P2d2- , P2d2- , P3d3+
سؤال
At least one or both deviational variables in a goal constraint must equal:

A) 1
B) -1
C) 0
D) 2
سؤال
The objective function in all goal programming models is to ________ from the goal constraint levels.

A) maximize alternatives
B) minimize alternatives
C) minimize deviation
D) maximize deviation
سؤال
A company has a goal of calling on at least 400 customers a month (goal 1), but no fewer than 260 customers a month (goal 2). If X represents the number of customers contacted, which pair of constraints listed below is the appropriate representation in a goal programming problem?

A) X + d1-- d1+ = 400, X + d2- - d2+ = 260
B) X - d1-+ d1+ = 400, X - d2- - d2+ = 260
C) X - d1- + d1+ = 400, X + d2- - d2+ = 260
D) X + d1+ - d1+ = 400, X - d2- + d2+ = 260
سؤال
A ________ deviational variable is the amount by which a goal level is exceeded.

A) negative
B) positive
C) positive or negative
D) positive and negative
سؤال
A positive deviational variable is the amount by which a goal level is

A) underachieved.
B) exceeded.
C) minimized.
D) maximized.
سؤال
The majority of the goal constraints are equalities that include ________ variables.

A) only deviational
B) deviational and decision
C) only decision
D) neither deviational nor decision variables
سؤال
A company has a goal to maintain the current employment level, but places more importance on laying employees off than on hiring new employees. In other words, the company would rather hire than lay off employees. If the company assigns a "penalty weight" of 4 for the amount under the employment goal (goal 2) and a weight of 2 for the amount over the employment goal, how would this be expressed in the objective function?

A) Min 4P2d2- + 2P2d2+
B) Min 2P2d2-+ 4P2d2+
C) Max 4P2d2- + 2P2d2+
D) Min 4P2d2+ +2P2d2-
سؤال
One goal ________ achieved at the expense of another higher-priority goal.

A) is never
B) can sometimes be
C) is always
D) is under certain circumstances
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/103
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Multicriteria Decision Making
1
The different objectives in a goal programming problem are referred to as goals.
True
2
A negative deviational variable is the amount by which a goal level is exceeded.
False
3
The objective function in a goal programming model seeks to minimize the deviation from goals in the order of the goal priorities.
True
4
One goal is never achieved at the expense of another higher-priority goal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
5
All goal constraints are inequalities that include deviational variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
6
Goal programming solutions do not always achieve all goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
7
A pairwise comparison matrix summarizes the pairwise comparisons for a criterion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
8
Goal constraints can include all deviational variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
9
Objective function terms are not summed in goal programming because not all goals are achievable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
10
Goal programming provides a method for simultaneously striving to achieve several objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
11
A goal can be achieved at the expense of another lower-priority goal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
12
In a pairwise comparison, two alternatives are compared according to a criterion and one is preferred.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
13
In goal programming, terms are summed in the objective function in order to make consistent decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
14
In a goal programming model, the terms in the objective function are summed to determine the maximum profit or minimum cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
15
A preference scale assigns numerical values to different levels of preference.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
16
At least one or both deviational variables in a goal constraint must equal 0.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
17
A requirement for the solution procedure for the goal programming problem is that all goals must be achieved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
18
Goal programming violates the divisibility property of linear programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
19
In goal programming, problems cannot have two or more goals at the same priority level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
20
On a preference scale for pairwise comparisons, the number "1" indicates that two objects are equally preferred.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
21
A ________ vector is the average of the values in each row of the normalized matrix in the AHP process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
22
The analytic hierarchy process, scoring models, and goal programming are all considered to be ________ decision making techniques because they incorporate decisions based on more than one objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
23
A(n) ________ model is a similar to AHP, but simpler and easier to understand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
24
A consistency index measures the degree of inconsistency in pairwise comparisons.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
25
In synthesization, decision alternatives are prioritized within each criterion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
26
A preference scale assigns numerical values to different levels of preferences.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
27
At least one or both deviational variables in a goal constraint must equal ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
28
A(n) ________ measures the degree of inconsistency in pairwise comparisons.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
29
A(n) ________ variable is the amount by which a goal level is exceeded.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
30
If the CI/RI ratio is more than ________, then there are probably serious inconsistencies in the AHP results.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
31
A(n) ________ variable is the amount by which a goal level is underachieved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
32
Consider the following constraint: 2x1 + 3x2 =60. Assume that we convert this constraint into a goal constraint with the value of x1 = 15 and the value of x2 = 15. Then the values of d1+ and d1- are ________ and ________, respectively.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
33
In a facility location problem, if location A receives a score of 45 for the criteria "traffic congestion", which has a weight of .30; a score of 50 for the criteria "labor force", which has a weight of .45; and a score of 60 for "utilities", which has a weight of .25, the overall score for location A is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
34
A(n) ________ assigns numerical values to different levels of preferences.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
35
In a given AHP problem, the consistency index is .15, and the random index is .90. In this instance, there are probably serious inconsistencies and, therefore, the AHP result may not be meaningful.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
36
A scoring model is more subjective than the analytical hierarchy process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
37
Scoring models use consistency indexes to measure the degree of consistency between choices.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
38
Deviational variables that occur in the objective function and the constraints of a goal programming model indicate the difference between all actual and ________ values.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
39
In scoring models, the two alternatives with the highest scores are compared to make the final decision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
40
The objective function formulation for a goal programming model is as follows:
Min P1 d1 -, P2 d2 -, P3 d1 +, P4 d3 -
Which one of the variables would the program designers like to have as the second goal such that its deviation from zero is minimized?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
41
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the profit constraint?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
42
An investor has $80,000 to invest in three stocks, stock A costs $100, stock B costs $120 and stock C costs $80. Each stock A has a risk factor of 8, each stock B has a risk factor of 10 and each stock C has a risk factor of 7. The investor believes that the sum of the risk factors for all stocks purchase should not exceed 6000. The projected annual growth rate for the three stocks are 9%, 13% and 8% respectively. The projected annual dividend income from these stocks are as follows: Stock A: $14/stock, Stock B: $15/stock, and Stock C: $20/stock. The investor desires an annual dividend income of $10,000. The investor has established the following goals in order of their importance:

(1) The investor believes that the budget cannot be exceeded. (d1)
(2) The risk factor should not exceed the target amount of 6000. (d2)
(3) The average annual growth rate in stock prices must be at least 10%. (d3)
(4) The investor desires a dividend income of at least $10,000. (d4)


-Write the risk factor constraint
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
43
Using the normalized matrix given below, calculate the row averages. Using the normalized matrix given below, calculate the row averages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
44
Assume that a decision maker using analytical hierarchy process generated the following pairwise comparison matrix. Assume that a decision maker using analytical hierarchy process generated the following pairwise comparison matrix.   Calculate the normalized matrix.
Calculate the normalized matrix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
45
Assume that a plant manager has to decide where to locate its warehouse. The decision has been narrowed down to choices among the following three cities: Detroit, Cleveland, and St. Louis. The following pairwise comparison matrix summarizes the preferences of the plant manager.
Assume that a plant manager has to decide where to locate its warehouse. The decision has been narrowed down to choices among the following three cities: Detroit, Cleveland, and St. Louis. The following pairwise comparison matrix summarizes the preferences of the plant manager.   Determine the normalized matrix.
Determine the normalized matrix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
46
A production of 300 units of Twiddle Bugs, an educational toy for children, must be completed within 1 week by BugU Manufacturing. Two production lines are available, each for 30 hours during the week. Production line 1 can produce five units per hour and production line 2 can produce four units an hour. Line 1 costs $50 per hour to operate and line 2 costs $55 per hour. Overtime is available for line 1 at $15 per hour and for line 2 at $12 per hour. Management goals in decreasing order are:
P1: Produce 300 units.
P2: Maximum allowable overtime of 6 hours for line 1.
P3: Cost of overtime must not exceed $750.
P4: Avoid the underutilization of either production line. Assign weights that are proportional to their production capability.
P5: Producing more than 300 units is 1-1/2 times as undesirable as producing under 300 units.

-What are the constraints for this problem?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
47
Assume that a plant manager has to decide where to locate its warehouse The decision has been narrowed down to choices among the following three cities: Detroit,, Cleveland, and St. Louis. The company has weighted each of these criteria in terms of its relative importance in the decision making process, and it has analyzed each potential warehouse location and graded them according to each criteria as shown in the following table.
Assume that a plant manager has to decide where to locate its warehouse The decision has been narrowed down to choices among the following three cities: Detroit,, Cleveland, and St. Louis. The company has weighted each of these criteria in terms of its relative importance in the decision making process, and it has analyzed each potential warehouse location and graded them according to each criteria as shown in the following table.   Calculate the scores for each location and state where the warehouse should be located.
Calculate the scores for each location and state where the warehouse should be located.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
48
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the packaging material constraint?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
49
An investor has $80,000 to invest in three stocks, stock A costs $100, stock B costs $120 and stock C costs $80. Each stock A has a risk factor of 8, each stock B has a risk factor of 10 and each stock C has a risk factor of 7. The investor believes that the sum of the risk factors for all stocks purchase should not exceed 6000. The projected annual growth rate for the three stocks are 9%, 13% and 8% respectively. The projected annual dividend income from these stocks are as follows: Stock A: $14/stock, Stock B: $15/stock, and Stock C: $20/stock. The investor desires an annual dividend income of $10,000. The investor has established the following goals in order of their importance:

(1) The investor believes that the budget cannot be exceeded. (d1)
(2) The risk factor should not exceed the target amount of 6000. (d2)
(3) The average annual growth rate in stock prices must be at least 10%. (d3)
(4) The investor desires a dividend income of at least $10,000. (d4)


-State the goal programming objective function.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
50
The analytical hierarchy process was used to determine which car to purchase. Four criteria were used: price, miles per gallon, comfort, and durability. Consider the following normalized matrix and the preference vector for durability.                            Durability Matrix           Preference  Car A  Car B  Car C  Vector  Car A 10.2540.36 Car B 410.50.59 Car C 0.252.001.000.41~~~~~~~~~~~~~~~~~~~~~~~~~~{ \text { Durability Matrix } } ~~~~~~~~~ \text { Preference } \\\begin{array} { l c c c c } & \text { Car A } & \text { Car B } & \text { Car C } & \text { Vector } \\\hline \text { Car A } & 1 & 0.25 & 4 & 0.36 \\\text { Car B } & 4 & 1 & 0.5 & 0.59 \\\text { Car C } & 0.25 & 2.00 & 1.00 & 0.41 \\\hline\end{array}
Multiplying the normalized matrix by the preference vector gives the following results:
2.172.261.69\begin{array} { | l | } \hline 2.17 \\\hline 2.26 \\\hline 1.69 \\\hline\end{array}
Compute the consistency index.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
51
Assume that a decision maker has to make a choice between three types of cars. Chevy, Honda, and Ford. Based on three criteria: comfort, MPG, and style.
The row averages for criteria is summarized in the following column vector: Assume that a decision maker has to make a choice between three types of cars. Chevy, Honda, and Ford. Based on three criteria: comfort, MPG, and style. The row averages for criteria is summarized in the following column vector:   The preference matrix for the three types of cars is given as follows:   Compute the overall score for each decision alternative (car).
The preference matrix for the three types of cars is given as follows: Assume that a decision maker has to make a choice between three types of cars. Chevy, Honda, and Ford. Based on three criteria: comfort, MPG, and style. The row averages for criteria is summarized in the following column vector:   The preference matrix for the three types of cars is given as follows:   Compute the overall score for each decision alternative (car).
Compute the overall score for each decision alternative (car).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
52
The objective function formulation for a goal programming model is as follows:
Min P1 d1 -, P2 d2 -, (4 P4 d3 - + 6P4 d2 +)
At the priority level 4, which one of the deviational variables is most important?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
53
A production of 300 units of Twiddle Bugs, an educational toy for children, must be completed within 1 week by BugU Manufacturing. Two production lines are available, each for 30 hours during the week. Production line 1 can produce five units per hour and production line 2 can produce four units an hour. Line 1 costs $50 per hour to operate and line 2 costs $55 per hour. Overtime is available for line 1 at $15 per hour and for line 2 at $12 per hour. Management goals in decreasing order are:
P1: Produce 300 units.
P2: Maximum allowable overtime of 6 hours for line 1.
P3: Cost of overtime must not exceed $750.
P4: Avoid the underutilization of either production line. Assign weights that are proportional to their production capability.
P5: Producing more than 300 units is 1-1/2 times as undesirable as producing under 300 units.

-What is the objective function?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
54
An investor has $80,000 to invest in three stocks, stock A costs $100, stock B costs $120 and stock C costs $80. Each stock A has a risk factor of 8, each stock B has a risk factor of 10 and each stock C has a risk factor of 7. The investor believes that the sum of the risk factors for all stocks purchase should not exceed 6000. The projected annual growth rate for the three stocks are 9%, 13% and 8% respectively. The projected annual dividend income from these stocks are as follows: Stock A: $14/stock, Stock B: $15/stock, and Stock C: $20/stock. The investor desires an annual dividend income of $10,000. The investor has established the following goals in order of their importance:

(1) The investor believes that the budget cannot be exceeded. (d1)
(2) The risk factor should not exceed the target amount of 6000. (d2)
(3) The average annual growth rate in stock prices must be at least 10%. (d3)
(4) The investor desires a dividend income of at least $10,000. (d4)


-Write the budget constraint
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
55
Centerville city council is in the process of developing city tax rates. The annual tax base for real estate property is $750 million and for general sales, $80 million. Annual local gas consumption is estimated at 12 million gallons. They have three goals, listed in order of priority:
1. Tax revenues must be at least $25 million to meet the city's financial commitments.
2. Sales tax cannot exceed 25% of all taxes collected.
3. Gasoline tax cannot exceed 8 cents per gallon.
Formulate as a goal programming problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
56
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the objective function?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
57
A business is trying to decide which restaurant to hold its annual awards banquet. Use the information below to determine the best choice.
Restaurant
A business is trying to decide which restaurant to hold its annual awards banquet. Use the information below to determine the best choice. Restaurant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
58
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the production time constraint?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
59
Consider the following normalized matrix for car comfort that was computed using the analytical hierarchy process:
Consider the following normalized matrix for car comfort that was computed using the analytical hierarchy process:   Which car is the most preferred based on comfort?
Which car is the most preferred based on comfort?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
60
Ashley's manufactures home furnishings for department stores. Planning is underway for the production of the following items during the next production period:
 Quilts (x1) Blinds (x2) Pillows (x3) Fabric required (yards) (d1)749 Time required (hours) (d2)1.520.5 Packaging material (ounces) (d3)321 Profit (d4)12108\begin{array} { l c c c } & \text { Quilts } \left( x _ { \mathbf { 1 } } \right) & \text { Blinds } \left( \boldsymbol { x } _ { \mathbf { 2 } } \right) & \text { Pillows } \left( x _ { 3 } \right) \\\text { Fabric required (yards) } \left( \boldsymbol { d } _ { \mathbf { 1 } } \right) & 7 & 4 & 9 \\\text { Time required (hours) } \left( \boldsymbol { d } _ { \mathbf { 2 } } \right) & 1.5 & 2 & 0.5 \\\text { Packaging material (ounces) } \left( \boldsymbol { d } _ { \mathbf { 3 } } \right) & 3 & 2 & 1 \\\text { Profit } \left( \boldsymbol { d } _ { \mathbf { 4 } } \right) & 12 & 10 & 8\end{array} Ashley has 3000 yards of material in stock for this production period. Five hundred hours of production time are scheduled and 400 ounces of packaging material is available. Each of these quantities can be adjusted through overtime or extra purchases. Ashley's highest priority is to achieve a profit of $3200. Her second priority is to avoid additional purchases of packaging material. Third, she wants to use all of the scheduled production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note that the deviational variables associated with each item are given in the table.

-What is the fabric constraint?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
61
Deviational variables in a goal programming model constraint represent the

A) underachievement or overachievement of a goal level.
B) resource constraint as defined by the linear model.
C) probability of an optimal solution.
D) probabilistic variables in the objective constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
62
The objective function in a goal programming model seeks to ________ the deviation from goals in the order of the goal priorities.

A) free
B) even out
C) maximize
D) minimize
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
63
Consider the following constraint: 2x1 + 3x2 =60. Assume that we convert this constraint into a goal constraint with the value of x1 = 15 and the value of x2 = 15. Then the values of d1+ and d1- are ________ and ________, respectively.

A) 0, 15
B) 15, 0
C) 20, 0
D) 0, 20
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
64
Goal constraints can include ________ deviational variables.

A) no
B) some
C) all
D) multiple
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
65
A ________ deviational variable is the amount by which a goal level is underachieved.

A) negative
B) positive
C) positive or negative
D) positive and negative
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
66
Deviation variables

A) represent the actual value of the function part of a goal constraint.
B) represent the difference between the target and actual values.
C) must sum to 1.
D) equal the difference between actual and predicted values of the decision variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
67
Two or more goals at the same priority level can be assigned weights to indicate their relative

A) meaning.
B) slack.
C) difference.
D) importance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
68
A decision with more than one objective

A) should be decomposed into a separate model for each objective .
B) depends on the probability of satisfying each objective.
C) requires the decision maker to put the objectives in some order of importance.
D) cannot have an optimal solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
69
The objective function min P1d1- , P2d2+

A) attempts to avoid being below target for the priority 1 goal.
B) attempts to avoid being below target for the priority 2 goal.
C) will not have any feasible solutions.
D) will have a solution only if P1 > P2.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
70
Goal programming solutions ________ achieve all goals.

A) always
B) don't always
C) sometimes
D) never
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
71
If the constraint 3x1 + 4x2 + (d1-) - (d1+) = 250 measures hours, then

A) 3x1 + 4x2 is equal to the actual time spent.
B) if d1- is equal to 25, then 3x1 + 4x2 must equal 25.
C) overtime could be represented by d1-.
D) hours can take only an integer value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
72
A company has three goals, listed in order of importance.
1) Achieve a total profit of at least $240 million.
2) Maintain the current employment level of 3,000 employees
3) Invest no more than $70 million in capital.
What is the objective function for a goal program for this situation?

A) Min P1d1- , P2d2- , P3d3+
B) Min P1d1- , P2d2+ , P2d2- , P3d3-
C) Min P1d1- , P2d2- , P2d2- , P3d3+
D) Min P1d1+ , P2d2- , P2d2- , P3d3+
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
73
At least one or both deviational variables in a goal constraint must equal:

A) 1
B) -1
C) 0
D) 2
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
74
The objective function in all goal programming models is to ________ from the goal constraint levels.

A) maximize alternatives
B) minimize alternatives
C) minimize deviation
D) maximize deviation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
75
A company has a goal of calling on at least 400 customers a month (goal 1), but no fewer than 260 customers a month (goal 2). If X represents the number of customers contacted, which pair of constraints listed below is the appropriate representation in a goal programming problem?

A) X + d1-- d1+ = 400, X + d2- - d2+ = 260
B) X - d1-+ d1+ = 400, X - d2- - d2+ = 260
C) X - d1- + d1+ = 400, X + d2- - d2+ = 260
D) X + d1+ - d1+ = 400, X - d2- + d2+ = 260
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
76
A ________ deviational variable is the amount by which a goal level is exceeded.

A) negative
B) positive
C) positive or negative
D) positive and negative
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
77
A positive deviational variable is the amount by which a goal level is

A) underachieved.
B) exceeded.
C) minimized.
D) maximized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
78
The majority of the goal constraints are equalities that include ________ variables.

A) only deviational
B) deviational and decision
C) only decision
D) neither deviational nor decision variables
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
79
A company has a goal to maintain the current employment level, but places more importance on laying employees off than on hiring new employees. In other words, the company would rather hire than lay off employees. If the company assigns a "penalty weight" of 4 for the amount under the employment goal (goal 2) and a weight of 2 for the amount over the employment goal, how would this be expressed in the objective function?

A) Min 4P2d2- + 2P2d2+
B) Min 2P2d2-+ 4P2d2+
C) Max 4P2d2- + 2P2d2+
D) Min 4P2d2+ +2P2d2-
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
80
One goal ________ achieved at the expense of another higher-priority goal.

A) is never
B) can sometimes be
C) is always
D) is under certain circumstances
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.