Deck 14: Acquiring Information Systems and Applications

ملء الشاشة (f)
exit full mode
سؤال
In joint application design, systems analysts interview or directly observe potential users of the new system individually to understand each user's needs.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following statements about the buy option for acquiring IS applications is true?

A) Many different types of off-the-shelf software are available.
B) The company can try out the software before purchasing it.
C) The company can save much time by buying rather than building.
D) All of these options
سؤال
The main advantage of rapid application development is the active involvement of users in the development process.
سؤال
Leasing can be attractive to small- and medium-sized organizations that cannot afford major investments in software.
سؤال
Legacy systems were expensive to build, because they required on-premise hardware, software, and networking technologies.
سؤال
Which of the following is a reason why evaluating the benefits of IT projects is more complex than evaluating their costs?

A) Benefits are often intangible and harder to quantify.
B) IT can be used for several different purposes.
C) The probability of obtaining a return from an IT investment is based on the probability of implementation success.
D) All of these options
سؤال
In the case of _____, organizations obtain a license to implement a version of the software product and are then able to further customize it to suit their needs.

A) open-source software
B) software leasing
C) software-as-a-service (SaaS)
D) custom development
سؤال
The IT planning process begins with an analysis of the organization's IT infrastructure.
سؤال
Which of the following is the most difficult and crucial task in evaluating a vendor and a software package?

A) Identifying potential vendors
B) Determining the evaluation criteria
C) Evaluating vendors and packages
D) Choosing vendors and packages
سؤال
The _____ approach to systems development uses specialized tools to automate many of the tasks in the systems development life cycle.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
سؤال
The feasibility study addresses which of the following issues?

A) Economic feasibility
B) Technical feasibility
C) Behavioral feasibility
D) All of these options
سؤال
_____ feasibility determines if the hardware, software, and communications components can be developed and/or acquired to solve the business problem.

A) Technical
B) Economic
C) Organizational
D) Behavioral
سؤال
Which of the following systems acquisition methods may eventually require maintenance assistance from the IT department, produce inadequate documentation, and result in a system with inadequate interfaces to existing systems?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) Component-based development
سؤال
Which of the following is a disadvantage of prototyping?

A) It takes too long to progress from the original ideas to a working system.
B) It is impractical with large number of users.
C) It is often more expensive to build and maintain.
D) It is difficult to use with existing systems.
سؤال
_____ are employees from all functional areas and levels of the organization who interact with the system, either directly or indirectly.

A) Systems stakeholders
B) Programmers
C) Systems analysts
D) Users
سؤال
The goals of the _____ are to link corporate strategy and IT strategy, approve the allocation of resources for the MIS function, and establish performance measures for the MIS function and see that they are met.

A) CEO
B) Board of Directors
C) IT operational committee
D) IT steering committee
سؤال
The _____ is a set of long-range goals that describe the IT infrastructure and identify the major IT initiatives needed to achieve the goals of the organization.

A) IT operational plan
B) application portfolio
C) IT strategic plan
D) IT mission
سؤال
An application service provider is a vendor who assembles the software needed by an enterprise and packages the software with outsourced development, operations, maintenance, and other services.
سؤال
A request for proposal is a document that companies send to potential vendors inviting them to submit a proposal that describes their software package and how it would meet the company's needs.
سؤال
The _____ approach to systems development defines an initial list of user requirements, then develops the system in an iterative fashion.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
سؤال
Which of the following statements about the FAA's Next Generation Air Transportation System is NOT true?

A) The purpose of NextGen is to transform America's air traffic control system from a ground-based system to a satellite-based system.
B) The slow pace of NextGen's implementation has drawn harsh criticism.
C) The FAA failed to set realistic goals, budgets, or expectations for NextGen.
D) All of these options
سؤال
Which of the following statements about Capital One's strategy is NOT true?

A) It focused on insourcing software development.
B) It implemented a 24-month training program that helped develop the rapid agile development culture.
C) It focused on implementing rigid development methodologies to improve quality and reduce the occurrence of errors.
D) It bought and operated a data center to support its new development methodologies.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/22
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Acquiring Information Systems and Applications
1
In joint application design, systems analysts interview or directly observe potential users of the new system individually to understand each user's needs.
False
2
Which of the following statements about the buy option for acquiring IS applications is true?

A) Many different types of off-the-shelf software are available.
B) The company can try out the software before purchasing it.
C) The company can save much time by buying rather than building.
D) All of these options
D
3
The main advantage of rapid application development is the active involvement of users in the development process.
True
4
Leasing can be attractive to small- and medium-sized organizations that cannot afford major investments in software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
5
Legacy systems were expensive to build, because they required on-premise hardware, software, and networking technologies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is a reason why evaluating the benefits of IT projects is more complex than evaluating their costs?

A) Benefits are often intangible and harder to quantify.
B) IT can be used for several different purposes.
C) The probability of obtaining a return from an IT investment is based on the probability of implementation success.
D) All of these options
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
7
In the case of _____, organizations obtain a license to implement a version of the software product and are then able to further customize it to suit their needs.

A) open-source software
B) software leasing
C) software-as-a-service (SaaS)
D) custom development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
8
The IT planning process begins with an analysis of the organization's IT infrastructure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is the most difficult and crucial task in evaluating a vendor and a software package?

A) Identifying potential vendors
B) Determining the evaluation criteria
C) Evaluating vendors and packages
D) Choosing vendors and packages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
10
The _____ approach to systems development uses specialized tools to automate many of the tasks in the systems development life cycle.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
11
The feasibility study addresses which of the following issues?

A) Economic feasibility
B) Technical feasibility
C) Behavioral feasibility
D) All of these options
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
12
_____ feasibility determines if the hardware, software, and communications components can be developed and/or acquired to solve the business problem.

A) Technical
B) Economic
C) Organizational
D) Behavioral
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following systems acquisition methods may eventually require maintenance assistance from the IT department, produce inadequate documentation, and result in a system with inadequate interfaces to existing systems?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) Component-based development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is a disadvantage of prototyping?

A) It takes too long to progress from the original ideas to a working system.
B) It is impractical with large number of users.
C) It is often more expensive to build and maintain.
D) It is difficult to use with existing systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
15
_____ are employees from all functional areas and levels of the organization who interact with the system, either directly or indirectly.

A) Systems stakeholders
B) Programmers
C) Systems analysts
D) Users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
16
The goals of the _____ are to link corporate strategy and IT strategy, approve the allocation of resources for the MIS function, and establish performance measures for the MIS function and see that they are met.

A) CEO
B) Board of Directors
C) IT operational committee
D) IT steering committee
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
17
The _____ is a set of long-range goals that describe the IT infrastructure and identify the major IT initiatives needed to achieve the goals of the organization.

A) IT operational plan
B) application portfolio
C) IT strategic plan
D) IT mission
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
18
An application service provider is a vendor who assembles the software needed by an enterprise and packages the software with outsourced development, operations, maintenance, and other services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
19
A request for proposal is a document that companies send to potential vendors inviting them to submit a proposal that describes their software package and how it would meet the company's needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
20
The _____ approach to systems development defines an initial list of user requirements, then develops the system in an iterative fashion.

A) integrated computer-assisted software engineering
B) joint application design
C) rapid application development
D) prototyping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following statements about the FAA's Next Generation Air Transportation System is NOT true?

A) The purpose of NextGen is to transform America's air traffic control system from a ground-based system to a satellite-based system.
B) The slow pace of NextGen's implementation has drawn harsh criticism.
C) The FAA failed to set realistic goals, budgets, or expectations for NextGen.
D) All of these options
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following statements about Capital One's strategy is NOT true?

A) It focused on insourcing software development.
B) It implemented a 24-month training program that helped develop the rapid agile development culture.
C) It focused on implementing rigid development methodologies to improve quality and reduce the occurrence of errors.
D) It bought and operated a data center to support its new development methodologies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.