Projects are __________-term efforts to create a specific business-related outcome.

A) Any
B) Long
C) Medium
D) Short
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
____________ is NOT one of the triple constraints of project management.

A) Cost
B) Quality
C) Scope
D) Time
سؤال
Which of the following is NOT a way to enable project management success?

A) Align team incentives with overall project goals
B) Concentrate on budgeting and scheduling
C) Excel at core project management practices
D) Secure critical talent
سؤال
The __________________ phase of project management is used to clearly define the problem that the project is intended to solve and the goals that it is to achieve.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
سؤال
Scope creep refers to _____________ changes in a project's __________.

A) Controlled; cost
B) Controlled; scope
C) Uncontrolled; cost
D) Uncontrolled; scope
سؤال
Which of the following is NOT a cause of most IT project failures?

A) A lack of focus
B) Content issues
C) Execution issues
D) Insufficient funding
سؤال
The ________________ initiates a project.

A) Customer
B) IT department
C) Supplier
D) User
سؤال
Which of the following is NOT associated with runaway projects?

A) Increased value
B) Monetary loss
C) Over budget
D) Past deadlines
سؤال
Scope creep is caused by ___________ asking for more than what was originally planned.

A) Customers
B) IT departments
C) Suppliers
D) Users
سؤال
In the __________ phase of project management, the work defined in the project management plan is performed to accomplish the project's requirements.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
سؤال
IS ________________________ is a directed effort to plan, organize, and manage resources to bring about the successful achievement of specific IS goals.

A) business process improvement
B) organizational planning
C) project management
D) strategic development
سؤال
The purpose of the ____________ phase of project management is to determine whether the project is progressing as planned.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
سؤال
Scope creep does NOT lead to projects that are ___________.

A) Lower quality
B) Outside the original scope
C) Over budget
D) Overtime
سؤال
To meet the deadlines for the Hong Kong natural gas pipeline, project managers implemented elements of the __________ approach.

A) Agile
B) iCASE
C) RAD
D) Waterfall
سؤال
The ___________ phase of project management is critically important to avoiding scope creep.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
سؤال
The project is formally accepted by the organization in the __________ phase of project management.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
سؤال
Organizations identify and secure the necessary resources for the project, analyze the cost and benefits of the project, and identify potential risks in the ___________ phase of project management.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
سؤال
The project objective and every activity associated with that objective must be identified and sequenced in the ___________ phase of project management.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
سؤال
Which of the following is NOT a tool that assists developers in sequencing the activities associated with the project objective?

A) CPM
B) Gantt chart
C) PERT
D) SAP
سؤال
The Hong Kong natural gas pipeline project scope was controlled by __________.

A) a rigorous change management process
B) not allowing any changes to the original project
C) providing extra time at the end of the project to fulfill all requests
D) spending more money to get more workers involved
سؤال
Project ____________ management is used to ensure the project outcomes meet the needs for which the project was executed.

A) Human resource
B) Quality
C) Risk
D) Scope
سؤال
Project ____________ management includes concepts such as staffing decisions, team management, and organizational culture, style, and structure.

A) Communications
B) Human resource
C) Integration
D) Procurement
سؤال
Project ____________ management includes the processes of solicitation, selection, contractual agreements, and closeout processes to ensure the project has funding.

A) Cost
B) Human resource
C) Procurement
D) Quality
سؤال
To meet the scope and cost project constraints, the Hong Kong natural gas pipeline project did not finish on time.
سؤال
Projects are long-term efforts to create a specific business-related outcome.
سؤال
Project ____________ management ensures information is collected, disseminated, stored, and destroyed at the appropriate time.

A) Communications
B) Human resource
C) Procurement
D) Risk
سؤال
_____________________ is a collection of processes and knowledge areas generally accepted as best practice within the project management discipline.

A) CPM
B) PERT
C) PMBOK
D) RAPM
سؤال
Focusing on ____________ is the primary driver of IT project management success.

A) a strong IT department
B) aligning with supplier requirements
C) fulfilling external customer expectations
D) meeting business user needs
سؤال
Project ____________ management includes those processes required to ensure that all the project's components are properly coordinated.

A) Communications
B) Human resource
C) Integration
D) Procurement
سؤال
The cost constraint of project management includes only the cash an organization must spend on the hardware and software necessary to implement a new system.
سؤال
Project ____________ management defines the processes that limit and control the work included in a project.

A) Human resource
B) Procurement
C) Risk
D) Scope
سؤال
Users are primarily responsible for initiating an IT project.
سؤال
The Hong Kong natural gas pipeline case illustrates how complex projects can be but that they can be successful if managed well.
سؤال
According to the PMBOK, _____________ is an output of the project process.

A) Designs
B) Tools
C) Plans
D) Products
سؤال
Project ____________ management ensures the project stays within the budget range.

A) Communications
B) Cost
C) Procurement
D) Scope
سؤال
Time, cost, and quality are the three triple constraints of project management.
سؤال
Project ____________ management includes identification of risks, quantitative and qualitative analyses, risk response planning, and risk monitoring.

A) Human resource
B) Integration
C) Quality
D) Risk
سؤال
The triple constraints of project management are related and involve trade-offs.
سؤال
All projects are constrained by time, cost, and scope.
سؤال
Project ____________ management can be managed with the use of Gantt charts, milestone charts, and network charts to help managers see the big picture and stay in control of the project's progression.

A) Human resource
B) Procurement
C) Scope
D) Time
سؤال
There are fourteen knowledge areas of the PMBOK.
سؤال
_______________________________________________________________________ is a collection of processes and knowledge areas generally accepted as best practice within the project management discipline.
سؤال
According to the PMBOK, processes overlap and interact throughout a project.
سؤال
________________________________ is a directed effort to plan, organize, and manage resources to bring about the successful achievement of specific IS goals.
سؤال
PMBOK is an internationally recognized standard that provides fundamentals of project management specifically for IT projects like software installations (e.g. SAP).
سؤال
__________________ are short-term efforts to create a specific business-related outcome.
سؤال
_____________________________ refers to uncontrolled changes in a project's scope.
سؤال
Scope creep is generally considered a negative occurrence that is to be avoided.
سؤال
List and describe the three factors that constrain all projects. Suppose your college wants to implement new course management software (like Blackboard or Canvas); how would these three factors affect that implementation?
سؤال
List and describe the five stages in the project management process. For each step, identify areas that cause IT project failures.
سؤال
What is the PMBOK? List and describe the nine knowledge areas of the PMBOK.
سؤال
The triple constraints of project management are ______________.
سؤال
Focusing on managing strategy and stakeholders is one key to project management success.
سؤال
List and describe the three factors that constrain all projects. Suppose your college wants to implement new course management software (like Blackboard or Canvas), what would the tradeoffs be between these three factors?
سؤال
Scope creep refers to uncontrolled changes in a project's ______________.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Plug It in 6 Project Management
1
Projects are __________-term efforts to create a specific business-related outcome.

A) Any
B) Long
C) Medium
D) Short
D
2
____________ is NOT one of the triple constraints of project management.

A) Cost
B) Quality
C) Scope
D) Time
B
3
Which of the following is NOT a way to enable project management success?

A) Align team incentives with overall project goals
B) Concentrate on budgeting and scheduling
C) Excel at core project management practices
D) Secure critical talent
B
4
The __________________ phase of project management is used to clearly define the problem that the project is intended to solve and the goals that it is to achieve.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
Scope creep refers to _____________ changes in a project's __________.

A) Controlled; cost
B) Controlled; scope
C) Uncontrolled; cost
D) Uncontrolled; scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is NOT a cause of most IT project failures?

A) A lack of focus
B) Content issues
C) Execution issues
D) Insufficient funding
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
The ________________ initiates a project.

A) Customer
B) IT department
C) Supplier
D) User
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is NOT associated with runaway projects?

A) Increased value
B) Monetary loss
C) Over budget
D) Past deadlines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
Scope creep is caused by ___________ asking for more than what was originally planned.

A) Customers
B) IT departments
C) Suppliers
D) Users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
In the __________ phase of project management, the work defined in the project management plan is performed to accomplish the project's requirements.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
IS ________________________ is a directed effort to plan, organize, and manage resources to bring about the successful achievement of specific IS goals.

A) business process improvement
B) organizational planning
C) project management
D) strategic development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
The purpose of the ____________ phase of project management is to determine whether the project is progressing as planned.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
Scope creep does NOT lead to projects that are ___________.

A) Lower quality
B) Outside the original scope
C) Over budget
D) Overtime
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
To meet the deadlines for the Hong Kong natural gas pipeline, project managers implemented elements of the __________ approach.

A) Agile
B) iCASE
C) RAD
D) Waterfall
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
The ___________ phase of project management is critically important to avoiding scope creep.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
The project is formally accepted by the organization in the __________ phase of project management.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
Organizations identify and secure the necessary resources for the project, analyze the cost and benefits of the project, and identify potential risks in the ___________ phase of project management.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
The project objective and every activity associated with that objective must be identified and sequenced in the ___________ phase of project management.

A) Completion
B) Execution
C) Initiation
D) Monitoring and control
E) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is NOT a tool that assists developers in sequencing the activities associated with the project objective?

A) CPM
B) Gantt chart
C) PERT
D) SAP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
The Hong Kong natural gas pipeline project scope was controlled by __________.

A) a rigorous change management process
B) not allowing any changes to the original project
C) providing extra time at the end of the project to fulfill all requests
D) spending more money to get more workers involved
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
Project ____________ management is used to ensure the project outcomes meet the needs for which the project was executed.

A) Human resource
B) Quality
C) Risk
D) Scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
Project ____________ management includes concepts such as staffing decisions, team management, and organizational culture, style, and structure.

A) Communications
B) Human resource
C) Integration
D) Procurement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
Project ____________ management includes the processes of solicitation, selection, contractual agreements, and closeout processes to ensure the project has funding.

A) Cost
B) Human resource
C) Procurement
D) Quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
To meet the scope and cost project constraints, the Hong Kong natural gas pipeline project did not finish on time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
Projects are long-term efforts to create a specific business-related outcome.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
Project ____________ management ensures information is collected, disseminated, stored, and destroyed at the appropriate time.

A) Communications
B) Human resource
C) Procurement
D) Risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
_____________________ is a collection of processes and knowledge areas generally accepted as best practice within the project management discipline.

A) CPM
B) PERT
C) PMBOK
D) RAPM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
Focusing on ____________ is the primary driver of IT project management success.

A) a strong IT department
B) aligning with supplier requirements
C) fulfilling external customer expectations
D) meeting business user needs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
Project ____________ management includes those processes required to ensure that all the project's components are properly coordinated.

A) Communications
B) Human resource
C) Integration
D) Procurement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
The cost constraint of project management includes only the cash an organization must spend on the hardware and software necessary to implement a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
Project ____________ management defines the processes that limit and control the work included in a project.

A) Human resource
B) Procurement
C) Risk
D) Scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
Users are primarily responsible for initiating an IT project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
The Hong Kong natural gas pipeline case illustrates how complex projects can be but that they can be successful if managed well.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
According to the PMBOK, _____________ is an output of the project process.

A) Designs
B) Tools
C) Plans
D) Products
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
Project ____________ management ensures the project stays within the budget range.

A) Communications
B) Cost
C) Procurement
D) Scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
Time, cost, and quality are the three triple constraints of project management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
Project ____________ management includes identification of risks, quantitative and qualitative analyses, risk response planning, and risk monitoring.

A) Human resource
B) Integration
C) Quality
D) Risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
The triple constraints of project management are related and involve trade-offs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
All projects are constrained by time, cost, and scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
Project ____________ management can be managed with the use of Gantt charts, milestone charts, and network charts to help managers see the big picture and stay in control of the project's progression.

A) Human resource
B) Procurement
C) Scope
D) Time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
There are fourteen knowledge areas of the PMBOK.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
_______________________________________________________________________ is a collection of processes and knowledge areas generally accepted as best practice within the project management discipline.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
According to the PMBOK, processes overlap and interact throughout a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
________________________________ is a directed effort to plan, organize, and manage resources to bring about the successful achievement of specific IS goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
PMBOK is an internationally recognized standard that provides fundamentals of project management specifically for IT projects like software installations (e.g. SAP).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
__________________ are short-term efforts to create a specific business-related outcome.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
_____________________________ refers to uncontrolled changes in a project's scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
Scope creep is generally considered a negative occurrence that is to be avoided.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
List and describe the three factors that constrain all projects. Suppose your college wants to implement new course management software (like Blackboard or Canvas); how would these three factors affect that implementation?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
List and describe the five stages in the project management process. For each step, identify areas that cause IT project failures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
What is the PMBOK? List and describe the nine knowledge areas of the PMBOK.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
The triple constraints of project management are ______________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
Focusing on managing strategy and stakeholders is one key to project management success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
List and describe the three factors that constrain all projects. Suppose your college wants to implement new course management software (like Blackboard or Canvas), what would the tradeoffs be between these three factors?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
Scope creep refers to uncontrolled changes in a project's ______________.
فتح الحزمة