Deck 12: Capacity Planning

ملء الشاشة (f)
exit full mode
سؤال
Supply management variables include:

A)Inventory,subcontracting,and cooperative arrangements
B)Complementary offerings,inventory,and overtime
C)Subcontracting,hiring,and reservations
D)b and c
E)a and c
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
One option for altering the pattern of demand through aggregate planning is:

A)Hiring employees
B)Using overtime
C)Carrying inventory
D)Subcontracting
E)Pricing
سؤال
In aggregate planning:

A)The concern is over the long-time range.
B)Output levels are set in the face of certain demand.
C)"Aggregate" implies that planning is done for a single overall measure of output or at most a few products.
D)Decisions should not consider overtime,hiring,firing,subcontracting,and inventory levels together.
سؤال
The most popular type of facility used by Fortune 500 companies is:

A)Product-focused
B)Process-focused
C)Market-focused
D)Price-focused
E)General-purpose
سؤال
The aggregate planning problem:

A)Is narrow in nature
B)Only affects marketing and production
C)Is solved using either (but not both)demand management variables or supply management variables
D)Needs to consider multiple tradeoffs such as customer service level,inventory levels,labor force stability,and costs
سؤال
Which of the following is NOT true about aggregate planning in service organizations?

A)A time horizon of 12 months,on average,is used
B)The possibility of changing both supply and demand variables
C)A variety of management objectives
D)Requires inventory and capacity tradeoff
E)Facilities are fixed
سؤال
One way of leveling the demand during the off-peak season is by employing a differential pricing strategy.
سؤال
Which of the following is NOT a factor affecting the elements of a facilities strategy?

A)Cost of facilities
B)Likely behavior of competitors
C)Business strategy
D)Whether the company uses make-to-stock or assemble-to-order
E)International considerations
سؤال
Aggregate planning differs from scheduling in that:

A)The former refers to the long-range and the latter refers to the short-range.
B)The former is concerned with allocating available resources and the latter with the acquisition of resources.
C)The former refers to the long-range and the latter refers to the medium-range.
D)The former is concerned with the acquisition of resources and the latter with allocating available resources.
سؤال
Aggregate Planning assumes that the facility decisions are made and cannot be changed for a given product.
سؤال
Which of the following accurately describes a chase strategy?

A)The firm produces the same amount each day over the planning period and deals with the variations in demand with inventory or overtime.
B)The firm produces at the same level for several months,and then adjusts production to another level and produces at that level for several more months.
C)The firm produces exactly what is needed each month.
D)All of the above could describe the strategy depending on the organization.
E)None of the above accurately describes it.
سؤال
The type of strategy used with respect to the amount of capacity cushion when "the cost or consequence of running out is approximately in balance with the cost of excess capacity" is called:

A)Small cushion
B)Large cushion
C)Moderate cushion
D)None of the above
سؤال
Aggregate planning costs do NOT include:

A)Hiring and layoff costs
B)Overtime and undertime costs
C)Part-time labor costs
D)Subcontracting costs
E)Inventory ordering costs
سؤال
Demand management variables include:

A)Pricing,inventory,and advertising
B)Reservations,pricing,and advertising
C)Subcontracting,advertising,and pricing
D)Inventory,reservations,and pricing
سؤال
Aggregate Planning,Facilities Planning,and Scheduling form a hierarchy of decisions extending from long-range to medium-range to short-range,respectively,concerning the capacity of operations.
سؤال
Which of the following departments is NOT affected directly by the facilities decision?

A)Operations
B)Marketing
C)Finance
D)None of the above
سؤال
Which of the following statements regarding capacity is incorrect?

A)Capacity can be measured in several units such as hours of output,number of units produced,number of customers served,etc.
B)Effective capacity is generally less than the theoretical capacity.
C)Capacity is the maximum output that could be produced over a period.
D)It does not make sense to define the term 'maximum capacity' of a process.
E)None of the above
سؤال
Which of the following statements is true about facilities decisions?

A)Facilities decisions do not consider the amount of capacity,size of units,the timing of capacity changes,and the types of facilities needed.
B)Facilities decisions are on the short-range end of a hierarchy of capacity decisions.
C)Facilities decisions are not critical as they only determine future availability of output.
D)Facilities decisions involve all organizational units and are often made at the highest corporate level.
E)Facilities decisions are simple and easy to analyze.
سؤال
Facilities decisions:

A)Are medium-range capacity decisions
B)Should consider the five crucial questions independently
C)Constrain all other capacity decisions
D)Require planning for one year only
سؤال
Why can justifying capacity expansion with economies of scale be dangerous?

A)It is far too specific to use as a basis for capacity decisions
B)Because volume,capacity,and process considerations are looked at individually
C)Because the common notion that unit costs will decline for larger facilities due to size is not necessarily accurate
D)It requires consideration of quality,dependability,and flexibility
سؤال
A wait-and-see facility approach uses a positive capacity cushion.
سؤال
Capacity Utilization = Actual Output/Capacity x 100%.
سؤال
It is possible in the short term for a firm to operate above 100% utilization.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/23
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Capacity Planning
1
Supply management variables include:

A)Inventory,subcontracting,and cooperative arrangements
B)Complementary offerings,inventory,and overtime
C)Subcontracting,hiring,and reservations
D)b and c
E)a and c
A
2
One option for altering the pattern of demand through aggregate planning is:

A)Hiring employees
B)Using overtime
C)Carrying inventory
D)Subcontracting
E)Pricing
E
3
In aggregate planning:

A)The concern is over the long-time range.
B)Output levels are set in the face of certain demand.
C)"Aggregate" implies that planning is done for a single overall measure of output or at most a few products.
D)Decisions should not consider overtime,hiring,firing,subcontracting,and inventory levels together.
C
4
The most popular type of facility used by Fortune 500 companies is:

A)Product-focused
B)Process-focused
C)Market-focused
D)Price-focused
E)General-purpose
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
5
The aggregate planning problem:

A)Is narrow in nature
B)Only affects marketing and production
C)Is solved using either (but not both)demand management variables or supply management variables
D)Needs to consider multiple tradeoffs such as customer service level,inventory levels,labor force stability,and costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is NOT true about aggregate planning in service organizations?

A)A time horizon of 12 months,on average,is used
B)The possibility of changing both supply and demand variables
C)A variety of management objectives
D)Requires inventory and capacity tradeoff
E)Facilities are fixed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
7
One way of leveling the demand during the off-peak season is by employing a differential pricing strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is NOT a factor affecting the elements of a facilities strategy?

A)Cost of facilities
B)Likely behavior of competitors
C)Business strategy
D)Whether the company uses make-to-stock or assemble-to-order
E)International considerations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
9
Aggregate planning differs from scheduling in that:

A)The former refers to the long-range and the latter refers to the short-range.
B)The former is concerned with allocating available resources and the latter with the acquisition of resources.
C)The former refers to the long-range and the latter refers to the medium-range.
D)The former is concerned with the acquisition of resources and the latter with allocating available resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
10
Aggregate Planning assumes that the facility decisions are made and cannot be changed for a given product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following accurately describes a chase strategy?

A)The firm produces the same amount each day over the planning period and deals with the variations in demand with inventory or overtime.
B)The firm produces at the same level for several months,and then adjusts production to another level and produces at that level for several more months.
C)The firm produces exactly what is needed each month.
D)All of the above could describe the strategy depending on the organization.
E)None of the above accurately describes it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
12
The type of strategy used with respect to the amount of capacity cushion when "the cost or consequence of running out is approximately in balance with the cost of excess capacity" is called:

A)Small cushion
B)Large cushion
C)Moderate cushion
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
13
Aggregate planning costs do NOT include:

A)Hiring and layoff costs
B)Overtime and undertime costs
C)Part-time labor costs
D)Subcontracting costs
E)Inventory ordering costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
14
Demand management variables include:

A)Pricing,inventory,and advertising
B)Reservations,pricing,and advertising
C)Subcontracting,advertising,and pricing
D)Inventory,reservations,and pricing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
15
Aggregate Planning,Facilities Planning,and Scheduling form a hierarchy of decisions extending from long-range to medium-range to short-range,respectively,concerning the capacity of operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following departments is NOT affected directly by the facilities decision?

A)Operations
B)Marketing
C)Finance
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following statements regarding capacity is incorrect?

A)Capacity can be measured in several units such as hours of output,number of units produced,number of customers served,etc.
B)Effective capacity is generally less than the theoretical capacity.
C)Capacity is the maximum output that could be produced over a period.
D)It does not make sense to define the term 'maximum capacity' of a process.
E)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following statements is true about facilities decisions?

A)Facilities decisions do not consider the amount of capacity,size of units,the timing of capacity changes,and the types of facilities needed.
B)Facilities decisions are on the short-range end of a hierarchy of capacity decisions.
C)Facilities decisions are not critical as they only determine future availability of output.
D)Facilities decisions involve all organizational units and are often made at the highest corporate level.
E)Facilities decisions are simple and easy to analyze.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
19
Facilities decisions:

A)Are medium-range capacity decisions
B)Should consider the five crucial questions independently
C)Constrain all other capacity decisions
D)Require planning for one year only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
20
Why can justifying capacity expansion with economies of scale be dangerous?

A)It is far too specific to use as a basis for capacity decisions
B)Because volume,capacity,and process considerations are looked at individually
C)Because the common notion that unit costs will decline for larger facilities due to size is not necessarily accurate
D)It requires consideration of quality,dependability,and flexibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
21
A wait-and-see facility approach uses a positive capacity cushion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
22
Capacity Utilization = Actual Output/Capacity x 100%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
23
It is possible in the short term for a firm to operate above 100% utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.