Deck 23: Lean Systems
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
العب
ملء الشاشة (f)
Deck 23: Lean Systems
1
Taichii Ohno of Toyota patterned the Kanban system after
A)German automobile plants
B)Russian military practices
C)Japanese textile plants
D)American supermarkets
A)German automobile plants
B)Russian military practices
C)Japanese textile plants
D)American supermarkets
D
2
Which of the following actions is not consistent with lean?
A)Introducing dozens of new clothing lines each year in smaller quantities
B)Publishing texts and other books on demand
C)Reducing inventory levels by asking suppliers to hold the inventory instead
D)All of the above are consistent with the lean philosophy
A)Introducing dozens of new clothing lines each year in smaller quantities
B)Publishing texts and other books on demand
C)Reducing inventory levels by asking suppliers to hold the inventory instead
D)All of the above are consistent with the lean philosophy
C
3
Value stream mapping compares
A)the cost of a producing a product with the profit to be received from the sale of the product
B)cycle time with value added time
C)total time with value added time
D)kaizen with Kanban-based processes
A)the cost of a producing a product with the profit to be received from the sale of the product
B)cycle time with value added time
C)total time with value added time
D)kaizen with Kanban-based processes
C
4
An example of an internal setup would be
A)connecting the computer projection equipment before class begins
B)pre-setting exams on student desks before they walk into class
C)finding the correct files and opening PowerPoint during class
D)all of the above are internal setups
A)connecting the computer projection equipment before class begins
B)pre-setting exams on student desks before they walk into class
C)finding the correct files and opening PowerPoint during class
D)all of the above are internal setups
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
Poka-yoke is the practice of
A)uniform production
B)total employee involvement
C)fool proofing operations
D)undercapacity scheduling
A)uniform production
B)total employee involvement
C)fool proofing operations
D)undercapacity scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
Value stream mapping is a tool for
A)Analyzing processes
B)Eliminating waste
C)Comparing 'current state' and 'future state'
D)All of the above
A)Analyzing processes
B)Eliminating waste
C)Comparing 'current state' and 'future state'
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
Lean production does all of the following except
A)improves quality
B)reduces space requirements
C)improves supplier relations
D)makes it easier to adjust to dramatic swings in demand
A)improves quality
B)reduces space requirements
C)improves supplier relations
D)makes it easier to adjust to dramatic swings in demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
In a pull system of production,a worker resumes work when
A)The next process indicates a need
B)The preceding process indicates a need
C)The schedule indicates that there is work to be done
D)All of the above
A)The next process indicates a need
B)The preceding process indicates a need
C)The schedule indicates that there is work to be done
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
Lean can be used to tackle environmental problems by
A)Eliminating waste
B)Adding energy and material usage to value stream maps
C)Using the 5 why's and 5S
D)All of the above
A)Eliminating waste
B)Adding energy and material usage to value stream maps
C)Using the 5 why's and 5S
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
Lean emphasizes ______;while six sigma emphasizes ______ .
A)breakthrough improvement;continuous improvement
B)eliminating waste;reducing variability
C)process capability;flow
D)all of the above
A)breakthrough improvement;continuous improvement
B)eliminating waste;reducing variability
C)process capability;flow
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
Lean enables six sigma by
A)Determining process capabilities
B)Providing sophisticated statistical techniques
C)Training workers to look for root causes
D)All of the above
A)Determining process capabilities
B)Providing sophisticated statistical techniques
C)Training workers to look for root causes
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
Continuous improvement in lean production systems is best embodied by
A)Poka yokes
B)Kaizen
C)SMED
D)Total productive maintenance
A)Poka yokes
B)Kaizen
C)SMED
D)Total productive maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
Of the services listed below,lean is most popular in
A)retail
B)healthcare
C)banking
D)education
A)retail
B)healthcare
C)banking
D)education
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
Lean production is not the best choice for firms with ______ .
A)High demand variability
B)A large variety of low-volume products
C)Engineered-to-order products
D)All of the above
E)Lean can be successfully applied in any environment
A)High demand variability
B)A large variety of low-volume products
C)Engineered-to-order products
D)All of the above
E)Lean can be successfully applied in any environment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
The EPA recommends
A)Incorporating environmental,health and safety icons into value stream maps
B)Adding environmental waste to the seven wastes of lean
C)Looking for environmental waste during process improvement efforts.
D)All of the above
A)Incorporating environmental,health and safety icons into value stream maps
B)Adding environmental waste to the seven wastes of lean
C)Looking for environmental waste during process improvement efforts.
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck