Deck 24: Scheduling

ملء الشاشة (f)
exit full mode
سؤال
Which scheduling system is best suited to continuous production systems?

A)PERT networks
B)assembly line balancing
C)sequencing rules
D)linear programming
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Most employee scheduling problems are solved by

A)Linear programming
B)Expert systems
C)Genetic algorithms
D)Heuristics
سؤال
The process of assigning work to a machine center is called

A)loading.
B)sequencing.
C)priority control.
D)shop floor control.
سؤال
All of the following are types of advanced planning and scheduling systems except

A)Mathematical programming
B)Genetic algorithms
C)Neural networks
D)Sequencing rules
E)All of the above are advanced systems
سؤال
The time required to complete a group of jobs is called

A)Flowtime
B)Tardiness
C)Cycle time
D)Makespan
سؤال
The Theory of Constraints contends that

A)Process and transfer batch sizes should be the same.
B)The bottleneck schedule controls the output of the system
C)Resources should be distributed evenly across all work centers or departments
D)All of the above
سؤال
Which of the following quantitative techniques is often used for loading?

A)The assignment method of linear programming
B)The transportation method of linear programming
C)PERT/CPM
D)Break-even analysis
سؤال
For finite scheduling,

A)orders are scheduled without regard to capacity
B)orders are loaded and sequenced concurrently
C)the customer determines how orders are scheduled
D)all of the above
سؤال
Employee scheduling is difficult because

A)Employees may have different levels of competence and different preferences
B)Demand for work may not be steady throughout a week
C)Workdays days on and days off)for employees may differ from week to week
D)All of the above
سؤال
Why is it difficult to keep track of job progress in a job shop environment?

A)Many different types of jobs are in the system at the same time,each with unique routing paths
B)Jobs compete for limited resources
C)The pace at which a job flows through the system is dependent on the job's priority
D)All of the above
سؤال
A job with a critical ratio of .95 is

A)behind schedule
B)on schedule
C)ahead of schedule
D)not yet scheduled
سؤال
Input/output control is a different type of monitoring technique because it

A)Is displayed on a Gantt chart
B)Considers whether a work center is starved for work
C)Examines the planned and actual output from a work center to identify a bottleneck
D)All of the above
سؤال
According to TOC,the pace of production i.e. ,the drum)is set by

A)customer demand
B)the bottleneck operation
C)the cycle time
D)the master schedule
سؤال
Projects are best scheduled with

A)PERT/CPM
B)sequencing rules
C)linear programming
D)line balancing
سؤال
Johnson's Rule results in an optimal sequence when

A)there are only two serial processes.
B)all jobs follow the same sequence through the processes.
C)the objective is to minimize makespan.
D)All of the above must be true for an optimal sequence
سؤال
The SPT sequencing rule is most useful when

A)subcontracting is anticipated.
B)the shop is highly congested.
C)only small tardiness values can be tolerated.
D)jobs have to be assembled with other jobs at a later date.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/16
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 24: Scheduling
1
Which scheduling system is best suited to continuous production systems?

A)PERT networks
B)assembly line balancing
C)sequencing rules
D)linear programming
D
2
Most employee scheduling problems are solved by

A)Linear programming
B)Expert systems
C)Genetic algorithms
D)Heuristics
D
3
The process of assigning work to a machine center is called

A)loading.
B)sequencing.
C)priority control.
D)shop floor control.
A
4
All of the following are types of advanced planning and scheduling systems except

A)Mathematical programming
B)Genetic algorithms
C)Neural networks
D)Sequencing rules
E)All of the above are advanced systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
5
The time required to complete a group of jobs is called

A)Flowtime
B)Tardiness
C)Cycle time
D)Makespan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
6
The Theory of Constraints contends that

A)Process and transfer batch sizes should be the same.
B)The bottleneck schedule controls the output of the system
C)Resources should be distributed evenly across all work centers or departments
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following quantitative techniques is often used for loading?

A)The assignment method of linear programming
B)The transportation method of linear programming
C)PERT/CPM
D)Break-even analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
8
For finite scheduling,

A)orders are scheduled without regard to capacity
B)orders are loaded and sequenced concurrently
C)the customer determines how orders are scheduled
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
9
Employee scheduling is difficult because

A)Employees may have different levels of competence and different preferences
B)Demand for work may not be steady throughout a week
C)Workdays days on and days off)for employees may differ from week to week
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
10
Why is it difficult to keep track of job progress in a job shop environment?

A)Many different types of jobs are in the system at the same time,each with unique routing paths
B)Jobs compete for limited resources
C)The pace at which a job flows through the system is dependent on the job's priority
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
11
A job with a critical ratio of .95 is

A)behind schedule
B)on schedule
C)ahead of schedule
D)not yet scheduled
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
12
Input/output control is a different type of monitoring technique because it

A)Is displayed on a Gantt chart
B)Considers whether a work center is starved for work
C)Examines the planned and actual output from a work center to identify a bottleneck
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
13
According to TOC,the pace of production i.e. ,the drum)is set by

A)customer demand
B)the bottleneck operation
C)the cycle time
D)the master schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
14
Projects are best scheduled with

A)PERT/CPM
B)sequencing rules
C)linear programming
D)line balancing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
15
Johnson's Rule results in an optimal sequence when

A)there are only two serial processes.
B)all jobs follow the same sequence through the processes.
C)the objective is to minimize makespan.
D)All of the above must be true for an optimal sequence
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 16 في هذه المجموعة.
فتح الحزمة
k this deck
16
The SPT sequencing rule is most useful when

A)subcontracting is anticipated.
B)the shop is highly congested.
C)only small tardiness values can be tolerated.
D)jobs have to be assembled with other jobs at a later date.