Deck 12: Supplement Operational Decision-Making Tools: Work Measurement

ملء الشاشة (f)
exit full mode
سؤال
In a time study the standard time is computed by

A)multiplying the elemental average time by the rating factor
B)dividing the average elemental time by the rating factor
C)multiplying the normal cycle time by the rating factor
D)multiplying the normal cycle time by one plus the allowance factor
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In work measurement,a performance rating factor

A)allows the transferability of a standard to other workers
B)does not require that the analyst be specially trained
C)is the same regardless of the effort and skill of the operator observed
D)converts the time of the operator observed to the expected performance of the best worker
سؤال
A retail catalog company wants to perform a work sampling study of its call center,and if the company estimates its operators are busy answering calls 80% of the time,and it wants the study to be accurate with + or - 4% with a 95% degree of accuracy,the number of sample observations the study should include is approximately

A)8
B)49
C)384
D)2,401
سؤال
In a work sampling study the percentage of time a worker is idle is called the

A)normal time proportion
B)sampling error
C)sampling period
D)ratio delay
سؤال
A primary use of work sampling is to analyze jobs that have

A)very short,clearly defined tasks
B)highly repetitive tasks
C)non-repetitive tasks
D)a large number of tasks
سؤال
A company conducted a single sample of a time study for 10 cycles of a job and if the average cycle time was 0.60 minutes,and the standard deviation of the sample was 0.075 minutes,for the company to be 95% confident that the average time computed for the time study is within 5% of the true average cycle time,the time study would need to encompass

A)16 cycles
B)20 cycles
C)24 cycles
D)32 cycles
سؤال
If the normal cycle time for a job is 1.25 minutes and the allowance factor is 1.20,the number of units that an average worker can produce in an hour is

A)45.5
B)48.0
C)50.0
D)52.5
سؤال
For a time study normal times developed in a laboratory environment for basic,generic micromotions that are common to many jobs are

A)elemental standard times
B)predetermined motion times
C)time measurement units
D)normal cycle times
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/8
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Supplement Operational Decision-Making Tools: Work Measurement
1
In a time study the standard time is computed by

A)multiplying the elemental average time by the rating factor
B)dividing the average elemental time by the rating factor
C)multiplying the normal cycle time by the rating factor
D)multiplying the normal cycle time by one plus the allowance factor
D
2
In work measurement,a performance rating factor

A)allows the transferability of a standard to other workers
B)does not require that the analyst be specially trained
C)is the same regardless of the effort and skill of the operator observed
D)converts the time of the operator observed to the expected performance of the best worker
A
3
A retail catalog company wants to perform a work sampling study of its call center,and if the company estimates its operators are busy answering calls 80% of the time,and it wants the study to be accurate with + or - 4% with a 95% degree of accuracy,the number of sample observations the study should include is approximately

A)8
B)49
C)384
D)2,401
C
4
In a work sampling study the percentage of time a worker is idle is called the

A)normal time proportion
B)sampling error
C)sampling period
D)ratio delay
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
5
A primary use of work sampling is to analyze jobs that have

A)very short,clearly defined tasks
B)highly repetitive tasks
C)non-repetitive tasks
D)a large number of tasks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
6
A company conducted a single sample of a time study for 10 cycles of a job and if the average cycle time was 0.60 minutes,and the standard deviation of the sample was 0.075 minutes,for the company to be 95% confident that the average time computed for the time study is within 5% of the true average cycle time,the time study would need to encompass

A)16 cycles
B)20 cycles
C)24 cycles
D)32 cycles
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
7
If the normal cycle time for a job is 1.25 minutes and the allowance factor is 1.20,the number of units that an average worker can produce in an hour is

A)45.5
B)48.0
C)50.0
D)52.5
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
8
For a time study normal times developed in a laboratory environment for basic,generic micromotions that are common to many jobs are

A)elemental standard times
B)predetermined motion times
C)time measurement units
D)normal cycle times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 8 في هذه المجموعة.