Deck 8: Processes and Technology
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/14
العب
ملء الشاشة (f)
Deck 8: Processes and Technology
1
Process flow charts can be used to
A)analyze the efficiency of a process
B)document the steps in a process
C)suggest improvements in a process
D)all of the above
A)analyze the efficiency of a process
B)document the steps in a process
C)suggest improvements in a process
D)all of the above
D
2
Very high volume commodity products are best suited to
A)projects.
B)batch production.
C)mass production.
D)continuous production.
A)projects.
B)batch production.
C)mass production.
D)continuous production.
C
3
_________ classifies designs into families for easy retrieval and modification.
A)STEP
B)Group technology
C)CPC
D)FMS
A)STEP
B)Group technology
C)CPC
D)FMS
B
4
A high level process map
A)works forward from a performance goal to the desired output
B)contains only the essential building blocks of a process
C)begins with a detailed analysis of the current process
D)provides a new process design that is so thorough a pilot study is rarely needed
A)works forward from a performance goal to the desired output
B)contains only the essential building blocks of a process
C)begins with a detailed analysis of the current process
D)provides a new process design that is so thorough a pilot study is rarely needed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
5
Digital manufacturing is aided by new technology in which of the following areas?
A)products
B)processes
C)manufacture
D)information technology
E)all of the above
A)products
B)processes
C)manufacture
D)information technology
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
6
A driverless truck that moves material along a specified path is called a an)
A)AGV
B)ASRS
C)CAPP
D)robot
A)AGV
B)ASRS
C)CAPP
D)robot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
7
A swimlane chart is a type of process map that
A)is used for swim meets and other athletic events
B)shows the activities performed by various service providers or team members in the completion of a process.
C)has standard symbols that are filled in and connected to signify process steps
D)all of the above
A)is used for swim meets and other athletic events
B)shows the activities performed by various service providers or team members in the completion of a process.
C)has standard symbols that are filled in and connected to signify process steps
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
8
Process innovation projects are chartered to do all of the following except
A)achieve rapid,dramatic improvements in process performance
B)continuously improve existing processes
C)achieve breakthrough improvements
D)totally redesign or reengineer a process from scratch
A)achieve rapid,dramatic improvements in process performance
B)continuously improve existing processes
C)achieve breakthrough improvements
D)totally redesign or reengineer a process from scratch
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
9
_____________ takes a long time to complete,involves a large investment of funds and resources,and produces one item at a time to customer order.
A)A project
B)Batch production
C)Mass production
D)Continuous production
A)A project
B)Batch production
C)Mass production
D)Continuous production
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
10
When outsourcing to a country for the first time,companies would most likely choose which type of relationship with a supplier?
A)Joint venture
B)Strategic alliance
C)Single contract
D)Vertical integration
A)Joint venture
B)Strategic alliance
C)Single contract
D)Vertical integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
11
A process flow chart
A)includes only productive activities
B)shows the parent-component relationship in a product
C)is derived from a floor plan of the facility.
D)traces the path of a product through the production process.
A)includes only productive activities
B)shows the parent-component relationship in a product
C)is derived from a floor plan of the facility.
D)traces the path of a product through the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
12
In addition to purchasing costs,the decision on whether to invest in new technology should consider
A)Annual operating savings from the new technology versus the old technology
B)Enhancements in revenue that may accrue due to better customer service
C)The timing of a technology upgrade and other replacement decisions
D)The risk and uncertainty involved in using new technology
E)All of the above are important factors in technology decisions
A)Annual operating savings from the new technology versus the old technology
B)Enhancements in revenue that may accrue due to better customer service
C)The timing of a technology upgrade and other replacement decisions
D)The risk and uncertainty involved in using new technology
E)All of the above are important factors in technology decisions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
13
The two characteristics on which the product-process matrix is based are
A)demand volume and product standardization
B)demand stability and worker skills
C)product customization and process speed
D)product quality and process cost
A)demand volume and product standardization
B)demand stability and worker skills
C)product customization and process speed
D)product quality and process cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
14
Machine shops,printers,bakeries,education,and furniture-making are examples of
A)projects
B)batch production
C)mass production
D)continuous production
A)projects
B)batch production
C)mass production
D)continuous production
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck