Deck 19: Supplement Operational Decision-Making Tools: Simulation

ملء الشاشة (f)
exit full mode
سؤال
The Monte Carlo technique is a type of simulation model.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below. <strong>The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below.   Based on the probability distribution above,the expected value,or average hours of weekly capacity for the machine shop is</strong> A)500 hours. B)490 hours. C)480 hours. D)475 hours. <div style=padding-top: 35px> Based on the probability distribution above,the expected value,or average hours of weekly capacity for the machine shop is

A)500 hours.
B)490 hours.
C)480 hours.
D)475 hours.
سؤال
The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below. <strong>The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below.   Use the following random numbers to simulate weekly capacity for the machine shop for the next five weeks: 93,31,71,8,6. If the first random number interval begins with 0,then the estimated average capacity for the simulated five week period is</strong> A)560. B)520. C)480. D)400. <div style=padding-top: 35px> Use the following random numbers to simulate weekly capacity for the machine shop for the next five weeks: 93,31,71,8,6.
If the first random number interval begins with 0,then the estimated average capacity for the simulated five week period is

A)560.
B)520.
C)480.
D)400.
سؤال
At a Wal-Mart store,simulation can be used to determine the required staffing levels at check-out stands.
سؤال
Simulation is the preferred technique for problems with random variables represented by probability distributions.
سؤال
After a sufficient number of simulation runs,a steady state results when the variable being investigated reaches an _________ result that remains constant.

A)optimal
B)average
C)expected
D)estimated
سؤال
Simulation is often viewed as the technique of last resort because it can be applied to situations when there is no applicable quantitative model.
سؤال
Simulation analysis is useful for operational problems that

A)are easy to solve analytically.
B)can't be solved analytically.
C)require an optimal solution.
D)meet specific analytical criteria.
سؤال
The weekly demand for a company's product follows the probability distribution below. <strong>The weekly demand for a company's product follows the probability distribution below.   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 0 then the estimated average weekly demand for the simulated five week period is</strong> A)137.50. B)140.00. C)142.50. D)152.50. <div style=padding-top: 35px> Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 0 then the estimated average weekly demand for the simulated five week period is

A)137.50.
B)140.00.
C)142.50.
D)152.50.
سؤال
Simulation analysis is the preferred method used at hospitals to determine the type of treatment a patient requires.
سؤال
The ______________ technique selects numbers randomly from a probability distribution for use in a trial run of a simulation.

A)Computer World
B)Monaco
C)steady-state
D)None of these answer choices is correct.
سؤال
The weekly demand for a company's product follows the probability distribution below. <strong>The weekly demand for a company's product follows the probability distribution below.   The expected value,or average,weekly demand is</strong> A)137.50. B)142.50. C)153.75. D)165.75 <div style=padding-top: 35px> The expected value,or average,weekly demand is

A)137.50.
B)142.50.
C)153.75.
D)165.75
سؤال
Because simulation is used to analyze probabilistic problems,it provides information that is used to make a decision versus an optimal solution.
سؤال
A steady state results when a simulation is repeated enough times that the random variable being investigated reaches the expected value or average demand.
سؤال
The Monte Carlo technique selects numbers randomly from a probability distribution for use in a quantitative model.
سؤال
A random number's likelihood of being selected is based on a uniform distribution.
سؤال
The weekly demand for a company's product follows the probability distribution below. <strong>The weekly demand for a company's product follows the probability distribution below.   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 0 then the estimated total demand for the simulated five week period is</strong> A)700. B)650. C)625. D)550. <div style=padding-top: 35px> Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 0 then the estimated total demand for the simulated five week period is

A)700.
B)650.
C)625.
D)550.
سؤال
Simulation is a popular decision-making tool that can be applied to any type of problem.
سؤال
As a simulation model becomes more complex,using a computer application is the recommended approach.
سؤال
An advantage of using a computer versus a manual approach when performing a simulation is that it often takes only seconds versus hours to reach a steady-state result.
سؤال
The daily demand for a company's product follows the probability distribution below: <strong>The daily demand for a company's product follows the probability distribution below:   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 1,then the estimated total demand for the simulated five week period is</strong> A)200. B)230. C)250. D)280. <div style=padding-top: 35px> Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 1,then the estimated total demand for the simulated five week period is

A)200.
B)230.
C)250.
D)280.
سؤال
In what ways is simulation relevant to analyzing production problems?
سؤال
The daily demand for a company's product follows the probability distribution below. <strong>The daily demand for a company's product follows the probability distribution below.   The expected value,or average,weekly demand is</strong> A)41.50. B)45.50. C)47.75. D)51.75 <div style=padding-top: 35px> The expected value,or average,weekly demand is

A)41.50.
B)45.50.
C)47.75.
D)51.75
سؤال
What is simulation and why is it a popular decision-making tool?
سؤال
The daily demand for a company's product follows the probability distribution below: <strong>The daily demand for a company's product follows the probability distribution below:   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 0,then the estimated average weekly demand for the simulated five week period is</strong> A)40. B)46. C)50. D)56. <div style=padding-top: 35px> Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 0,then the estimated average weekly demand for the simulated five week period is

A)40.
B)46.
C)50.
D)56.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Supplement Operational Decision-Making Tools: Simulation
1
The Monte Carlo technique is a type of simulation model.
False
2
The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below. <strong>The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below.   Based on the probability distribution above,the expected value,or average hours of weekly capacity for the machine shop is</strong> A)500 hours. B)490 hours. C)480 hours. D)475 hours. Based on the probability distribution above,the expected value,or average hours of weekly capacity for the machine shop is

A)500 hours.
B)490 hours.
C)480 hours.
D)475 hours.
B
3
The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below. <strong>The weekly capacity measured in machine hours for a small machine shop follows the probability distribution shown below.   Use the following random numbers to simulate weekly capacity for the machine shop for the next five weeks: 93,31,71,8,6. If the first random number interval begins with 0,then the estimated average capacity for the simulated five week period is</strong> A)560. B)520. C)480. D)400. Use the following random numbers to simulate weekly capacity for the machine shop for the next five weeks: 93,31,71,8,6.
If the first random number interval begins with 0,then the estimated average capacity for the simulated five week period is

A)560.
B)520.
C)480.
D)400.
C
4
At a Wal-Mart store,simulation can be used to determine the required staffing levels at check-out stands.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
5
Simulation is the preferred technique for problems with random variables represented by probability distributions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
6
After a sufficient number of simulation runs,a steady state results when the variable being investigated reaches an _________ result that remains constant.

A)optimal
B)average
C)expected
D)estimated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
7
Simulation is often viewed as the technique of last resort because it can be applied to situations when there is no applicable quantitative model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
8
Simulation analysis is useful for operational problems that

A)are easy to solve analytically.
B)can't be solved analytically.
C)require an optimal solution.
D)meet specific analytical criteria.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
9
The weekly demand for a company's product follows the probability distribution below. <strong>The weekly demand for a company's product follows the probability distribution below.   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 0 then the estimated average weekly demand for the simulated five week period is</strong> A)137.50. B)140.00. C)142.50. D)152.50. Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 0 then the estimated average weekly demand for the simulated five week period is

A)137.50.
B)140.00.
C)142.50.
D)152.50.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
10
Simulation analysis is the preferred method used at hospitals to determine the type of treatment a patient requires.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
11
The ______________ technique selects numbers randomly from a probability distribution for use in a trial run of a simulation.

A)Computer World
B)Monaco
C)steady-state
D)None of these answer choices is correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
12
The weekly demand for a company's product follows the probability distribution below. <strong>The weekly demand for a company's product follows the probability distribution below.   The expected value,or average,weekly demand is</strong> A)137.50. B)142.50. C)153.75. D)165.75 The expected value,or average,weekly demand is

A)137.50.
B)142.50.
C)153.75.
D)165.75
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
13
Because simulation is used to analyze probabilistic problems,it provides information that is used to make a decision versus an optimal solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
14
A steady state results when a simulation is repeated enough times that the random variable being investigated reaches the expected value or average demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
15
The Monte Carlo technique selects numbers randomly from a probability distribution for use in a quantitative model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
16
A random number's likelihood of being selected is based on a uniform distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
17
The weekly demand for a company's product follows the probability distribution below. <strong>The weekly demand for a company's product follows the probability distribution below.   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 0 then the estimated total demand for the simulated five week period is</strong> A)700. B)650. C)625. D)550. Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 0 then the estimated total demand for the simulated five week period is

A)700.
B)650.
C)625.
D)550.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
18
Simulation is a popular decision-making tool that can be applied to any type of problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
19
As a simulation model becomes more complex,using a computer application is the recommended approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
20
An advantage of using a computer versus a manual approach when performing a simulation is that it often takes only seconds versus hours to reach a steady-state result.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
21
The daily demand for a company's product follows the probability distribution below: <strong>The daily demand for a company's product follows the probability distribution below:   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 1,then the estimated total demand for the simulated five week period is</strong> A)200. B)230. C)250. D)280. Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 1,then the estimated total demand for the simulated five week period is

A)200.
B)230.
C)250.
D)280.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
22
In what ways is simulation relevant to analyzing production problems?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
23
The daily demand for a company's product follows the probability distribution below. <strong>The daily demand for a company's product follows the probability distribution below.   The expected value,or average,weekly demand is</strong> A)41.50. B)45.50. C)47.75. D)51.75 The expected value,or average,weekly demand is

A)41.50.
B)45.50.
C)47.75.
D)51.75
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
24
What is simulation and why is it a popular decision-making tool?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
25
The daily demand for a company's product follows the probability distribution below: <strong>The daily demand for a company's product follows the probability distribution below:   Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47. If the first random number interval begins with 0,then the estimated average weekly demand for the simulated five week period is</strong> A)40. B)46. C)50. D)56. Use the following random numbers to simulate the product's demand for the next five weeks: 72,27,93,17,47.
If the first random number interval begins with 0,then the estimated average weekly demand for the simulated five week period is

A)40.
B)46.
C)50.
D)56.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.