 Deliverables are only product-related, such as a piece of hardware or software.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
 Project scope statements must include the project boundaries, constraints, and assumptions.
سؤال
 The executing tasks of the WBS remain constant from project to project.
سؤال
 Project scope management includes the processes involved in defining and controlling what is or is not included in a project.
سؤال
 The project's size, complexity, importance, and other factors do not affect how much effort is spent on collecting requirements for scope planning.
سؤال
 The scope baseline in a WBS consists of the requirements documentation and enterprise environmental factors.
سؤال
 Mind mapping allows people to write and even draw pictures of ideas in a nonlinear format.
سؤال
 Scope refers to all the work involved in creating the products of the project and the processes used to create them.
سؤال
 A work package represents one component of the product that the project aims to deliver.
سؤال
 The scope management plan can be informal and broad or formal and detailed, based on the needs of the project.
سؤال
 A work package must always represent less than 80 hours of work.
سؤال
 Many information technology projects also require detailed functional and design specifications for developing software, which also should be referenced in the detailed scope statement.
سؤال
 The project scope statement should reference supporting documents, such as product specifications that will affect what products are produced or purchased, or corporate policies, which might affect how products or services are produced.
سؤال
 Given the project management software that is available, it is relatively easy to create a good WBS.
سؤال
 Information from the project charter provides a basis for further defining the project scope.
سؤال
 Many organizations provide different guidelines and templates for developing WBSs.
سؤال
 The project management plan, project documents, enterprise environmental factors, and organizational process assets are the primary inputs for creating a WBS.
سؤال
 The tasks in a WBS must be developed as a sequential list of steps.
سؤال
 The main purpose of the WBS is to define all of the work required to complete a project.
سؤال
 The scope of a project is clear and specific from the start.
سؤال
 Which action involves defining and documenting the features and functions of the products produced during the project as well as the processes used for creating them?

A) Collecting requirements
B) Defining scope
C) Controlling scope
D) Validating scope
سؤال
 Which process involves generating ideas by comparing specific project practices or product characteristics to those of other projects or products inside or outside the performing organization?

A) variance
B) benchmarking
C) prototyping
D) decomposition
سؤال
 Which term describes a product produced as part of a project?

A) variance
B) scope
C) deliverable
D) work package
سؤال
 Which task is at the lowest level of the WBS?

A) variance
B) objective
C) deliverable
D) work package
سؤال
 Which output documents how project needs will be analyzed, documented, and managed?

A) requirements traceability matrix
B) requirements management plan
C) WBS
D) project scope statement
سؤال
 Creating the WBS is a subprocess associated with which process in project scope management?

A) planning
B) monitoring and controlling
C) closing
D) executing
سؤال
 The format of the WBS dictionary is essentially the same for all projects.
سؤال
 Which approach for constructing a WBS starts with the largest items of the project and breaks them into subordinate items?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
سؤال
 Scope creep if not managed well can lead to the failure of information technology projects.
سؤال
 Which action involves normalizing acceptance of the project deliverables and during this phase the key project stakeholders, such as the customer and sponsor for the project, inspect and then formally accept the deliverables?

A) Creating scope
B) Defining scope
C) Controlling scope
D) Validating scope
سؤال
 What is the main technique used in creating a WBS, which involves subdividing project deliverables into smaller pieces?

A) conglomeration
B) accumulation
C) decomposition
D) catalyzation
سؤال
 What is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed referred to as?

A) requirements traceability matrix
B) Gantt chart
C) state transition table
D) entity-attribute-value model
سؤال
 Which action involves reviewing the project charter, requirements documents, and organizational process assets to create a scope statement, adding more information as requirements are developed and change requests are approved?

A) Creating scope
B) Defining scope
C) Controlling scope
D) Validating scope
سؤال
 Which approach for constructing a WBS involves refining the work into greater and greater levels of detail?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
سؤال
 Which technique is used for creating a WBS uses branches radiating from a core idea to structure thoughts and ideas instead of writing down tasks in a list or immediately trying to create a structure for tasks?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
سؤال
 Which document should list and describe all of the deliverables required for the project?

A) project charter
B) scope statement
C) WBS
D) Gantt chart
سؤال
 Which approach for constructing a WBS uses a similar project's WBS as a starting point?

A) top-down
B) bottom-up
C) mind-mapping
D) analogy
سؤال
 Which document contains a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project?

A) project charter
B) business case
C) project scope statement
D) work breakdown structure
سؤال
 Which statement best describes scope?

A) each level of work that is outlined in a work breakdown structure
B) end product created as part of a project that is delivered to the client
C) tasks that are decomposed into smaller tasks in a work breakdown structure
D) work involved in creating the products and the processes used to create them
سؤال
 A unit of work should appear at only one place in the WBS.
سؤال
 Creating the _____ involves subdividing the major project deliverables into smaller, more manageable components.
سؤال
 During which approach do team members first identify as many specific tasks related to the project as possible and then aggregate the specific tasks and organize them into summary activities, or higher levels in the WBS?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
سؤال
 Mind mapping can be used for developing WBSs using which approach?

A) analogy approach only
B) bottom-up or analogy approach
C) top-down or bottom-up approach
D) any approach
سؤال
 Which process uses highly organized and intensive workshops to bring together project stakeholders-the sponsor, users, business analysts, programmers, and so on-to jointly define and design information systems?

A) Prototyping
B) JAD
C) RAD
D) Use case modeling
سؤال
 The main outputs of scope definition are the _____ and project document updates.
سؤال
 When using project management software, estimates of work time should be entered only at the work package level; the rest of the WBS items are just groupings or _____ tasks.
سؤال
 Which term refers to the difference between planned and actual performance?

A) Decomposition
B) Variance
C) Scope validation
D) Scope creep
سؤال
 Which process involves developing a working replica of the system or some aspect of the system?

A) Prototyping
B) Variance
C) Decomposition
D) Use case modeling
سؤال
 _____ includes the processes involved in defining and controlling what work is or is not included in a project.
سؤال
 A(n) _____ is a deliverable-oriented grouping of the work involved in a project that defines its total scope.
سؤال
 Subdividing the project deliverables into smaller pieces is known as _____.
سؤال
 _____ refer to "conditions or capabilities that must be met by the project or present in the product, service, or result to satisfy an agreement or other formally imposed specification."
سؤال
 Which process involves identifying and modeling business events, who initiated them, and how the system should respond to them?

A) Prototyping
B) JAD
C) RAD
D) Use case modeling
سؤال
 What process involves formal acceptance of the completed project scope by the stakeholders?

A) Scope validation
B) Scope planning
C) Scope control
D) Scope baseline
سؤال
 Which is recommended for the creation of a good WBS?

A) Any WBS item should be the responsibility of all the people working on it.
B) A unit of work should appear at only one place in the WBS.
C) Each WBS item should be created assuming that the requirements are inflexible.
D) The work content of a WBS item is independent of the WBS items below it.
سؤال
 The main outputs of _____are the project scope statement and updates to project documents.
سؤال
 What is scope creep?

A) the tendency for project scope to keep getting bigger and bigger
B) subdividing project deliverables into smaller pieces
C) the approved project scope statement and its associated WBS.
D) a task at the lowest level of the WBS
سؤال
 _____ refers to all the work involved in creating the products of the project and the processes used to create them.
سؤال
 The _____ includes the approved project scope statement and its associated WBS and WBS dictionary.
سؤال
 A(n) _____ is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed.
سؤال
 What are some of the suggestions for improving the requirements process?
سؤال
 _____ is the difference between planned and actual performance.
سؤال
 A work package is a task at the _____ level of the WBS.
سؤال
 Describe the process of scope validation.
سؤال
 _____ involves controlling changes to the project scope while keeping project goals and business strategy in mind.
سؤال
 A(n) _____ is a document that describes detailed information about each WBS item.
سؤال
 _____ is a technique that uses branches radiating out from a core idea to structure thoughts and ideas when creating a WBS.
سؤال
 A hierarchy is used to show the levels of _____ in the WBS.
سؤال
 In the _____ approach to creating a WBS, team members first identify as many specific tasks related to the project as possible.
سؤال
 The main tool for performing scope validation is _____ and group decision making techniques.
سؤال
 List and briefly describe five approaches for creating work breakdown structures.
سؤال
 What is a work breakdown structure? What are the inputs and tools used for creating one?
سؤال
 Some organizations prescribe the form and content for WBSs for particular projects. These are known as _____.
سؤال
 _____ is the tendency for project scope to keep getting bigger and bigger.
سؤال
 _____ involves developing a working replica of the system or some aspect of the system.
سؤال
 List and briefly describe the six main processes involved in project scope management.
سؤال
 _____ is a process for identifying and modeling business events, who initiated them, and how the system should respond to them.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/77
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Project Scope Management
1
 Deliverables are only product-related, such as a piece of hardware or software.
False
Explanation: Deliverables can be product-related, such as a piece of hardware or software, or process-related, such as a planning document or meeting minutes.
2
 Project scope statements must include the project boundaries, constraints, and assumptions.
False
Explanation: Project scope statements should include at least a product scope description, product user acceptance criteria, and detailed information on all project deliverables. It is also helpful to document other scope-related information, such as the project boundaries, constraints, and assumptions.
3
 The executing tasks of the WBS remain constant from project to project.
False
Explanation: The executing tasks vary the most from project to project, but many of the tasks under the other project management process groups would be similar for all projects.
4
 Project scope management includes the processes involved in defining and controlling what is or is not included in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
5
 The project's size, complexity, importance, and other factors do not affect how much effort is spent on collecting requirements for scope planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
6
 The scope baseline in a WBS consists of the requirements documentation and enterprise environmental factors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
7
 Mind mapping allows people to write and even draw pictures of ideas in a nonlinear format.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
8
 Scope refers to all the work involved in creating the products of the project and the processes used to create them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
9
 A work package represents one component of the product that the project aims to deliver.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
10
 The scope management plan can be informal and broad or formal and detailed, based on the needs of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
11
 A work package must always represent less than 80 hours of work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
12
 Many information technology projects also require detailed functional and design specifications for developing software, which also should be referenced in the detailed scope statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
13
 The project scope statement should reference supporting documents, such as product specifications that will affect what products are produced or purchased, or corporate policies, which might affect how products or services are produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
14
 Given the project management software that is available, it is relatively easy to create a good WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
15
 Information from the project charter provides a basis for further defining the project scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
16
 Many organizations provide different guidelines and templates for developing WBSs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
17
 The project management plan, project documents, enterprise environmental factors, and organizational process assets are the primary inputs for creating a WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
18
 The tasks in a WBS must be developed as a sequential list of steps.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
19
 The main purpose of the WBS is to define all of the work required to complete a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
20
 The scope of a project is clear and specific from the start.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
21
 Which action involves defining and documenting the features and functions of the products produced during the project as well as the processes used for creating them?

A) Collecting requirements
B) Defining scope
C) Controlling scope
D) Validating scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
22
 Which process involves generating ideas by comparing specific project practices or product characteristics to those of other projects or products inside or outside the performing organization?

A) variance
B) benchmarking
C) prototyping
D) decomposition
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
23
 Which term describes a product produced as part of a project?

A) variance
B) scope
C) deliverable
D) work package
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
24
 Which task is at the lowest level of the WBS?

A) variance
B) objective
C) deliverable
D) work package
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
25
 Which output documents how project needs will be analyzed, documented, and managed?

A) requirements traceability matrix
B) requirements management plan
C) WBS
D) project scope statement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
26
 Creating the WBS is a subprocess associated with which process in project scope management?

A) planning
B) monitoring and controlling
C) closing
D) executing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
27
 The format of the WBS dictionary is essentially the same for all projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
28
 Which approach for constructing a WBS starts with the largest items of the project and breaks them into subordinate items?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
29
 Scope creep if not managed well can lead to the failure of information technology projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
30
 Which action involves normalizing acceptance of the project deliverables and during this phase the key project stakeholders, such as the customer and sponsor for the project, inspect and then formally accept the deliverables?

A) Creating scope
B) Defining scope
C) Controlling scope
D) Validating scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
31
 What is the main technique used in creating a WBS, which involves subdividing project deliverables into smaller pieces?

A) conglomeration
B) accumulation
C) decomposition
D) catalyzation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
32
 What is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed referred to as?

A) requirements traceability matrix
B) Gantt chart
C) state transition table
D) entity-attribute-value model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
33
 Which action involves reviewing the project charter, requirements documents, and organizational process assets to create a scope statement, adding more information as requirements are developed and change requests are approved?

A) Creating scope
B) Defining scope
C) Controlling scope
D) Validating scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
34
 Which approach for constructing a WBS involves refining the work into greater and greater levels of detail?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
35
 Which technique is used for creating a WBS uses branches radiating from a core idea to structure thoughts and ideas instead of writing down tasks in a list or immediately trying to create a structure for tasks?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
36
 Which document should list and describe all of the deliverables required for the project?

A) project charter
B) scope statement
C) WBS
D) Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
37
 Which approach for constructing a WBS uses a similar project's WBS as a starting point?

A) top-down
B) bottom-up
C) mind-mapping
D) analogy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
38
 Which document contains a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project?

A) project charter
B) business case
C) project scope statement
D) work breakdown structure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
39
 Which statement best describes scope?

A) each level of work that is outlined in a work breakdown structure
B) end product created as part of a project that is delivered to the client
C) tasks that are decomposed into smaller tasks in a work breakdown structure
D) work involved in creating the products and the processes used to create them
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
40
 A unit of work should appear at only one place in the WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
41
 Creating the _____ involves subdividing the major project deliverables into smaller, more manageable components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
42
 During which approach do team members first identify as many specific tasks related to the project as possible and then aggregate the specific tasks and organize them into summary activities, or higher levels in the WBS?

A) analogy
B) bottom-up
C) top-down
D) mind mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
43
 Mind mapping can be used for developing WBSs using which approach?

A) analogy approach only
B) bottom-up or analogy approach
C) top-down or bottom-up approach
D) any approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
44
 Which process uses highly organized and intensive workshops to bring together project stakeholders-the sponsor, users, business analysts, programmers, and so on-to jointly define and design information systems?

A) Prototyping
B) JAD
C) RAD
D) Use case modeling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
45
 The main outputs of scope definition are the _____ and project document updates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
46
 When using project management software, estimates of work time should be entered only at the work package level; the rest of the WBS items are just groupings or _____ tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
47
 Which term refers to the difference between planned and actual performance?

A) Decomposition
B) Variance
C) Scope validation
D) Scope creep
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
48
 Which process involves developing a working replica of the system or some aspect of the system?

A) Prototyping
B) Variance
C) Decomposition
D) Use case modeling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
49
 _____ includes the processes involved in defining and controlling what work is or is not included in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
50
 A(n) _____ is a deliverable-oriented grouping of the work involved in a project that defines its total scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
51
 Subdividing the project deliverables into smaller pieces is known as _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
52
 _____ refer to "conditions or capabilities that must be met by the project or present in the product, service, or result to satisfy an agreement or other formally imposed specification."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
53
 Which process involves identifying and modeling business events, who initiated them, and how the system should respond to them?

A) Prototyping
B) JAD
C) RAD
D) Use case modeling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
54
 What process involves formal acceptance of the completed project scope by the stakeholders?

A) Scope validation
B) Scope planning
C) Scope control
D) Scope baseline
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
55
 Which is recommended for the creation of a good WBS?

A) Any WBS item should be the responsibility of all the people working on it.
B) A unit of work should appear at only one place in the WBS.
C) Each WBS item should be created assuming that the requirements are inflexible.
D) The work content of a WBS item is independent of the WBS items below it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
56
 The main outputs of _____are the project scope statement and updates to project documents.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
57
 What is scope creep?

A) the tendency for project scope to keep getting bigger and bigger
B) subdividing project deliverables into smaller pieces
C) the approved project scope statement and its associated WBS.
D) a task at the lowest level of the WBS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
58
 _____ refers to all the work involved in creating the products of the project and the processes used to create them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
59
 The _____ includes the approved project scope statement and its associated WBS and WBS dictionary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
60
 A(n) _____ is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
61
 What are some of the suggestions for improving the requirements process?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
62
 _____ is the difference between planned and actual performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
63
 A work package is a task at the _____ level of the WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
64
 Describe the process of scope validation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
65
 _____ involves controlling changes to the project scope while keeping project goals and business strategy in mind.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
66
 A(n) _____ is a document that describes detailed information about each WBS item.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
67
 _____ is a technique that uses branches radiating out from a core idea to structure thoughts and ideas when creating a WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
68
 A hierarchy is used to show the levels of _____ in the WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
69
 In the _____ approach to creating a WBS, team members first identify as many specific tasks related to the project as possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
70
 The main tool for performing scope validation is _____ and group decision making techniques.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
71
 List and briefly describe five approaches for creating work breakdown structures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
72
 What is a work breakdown structure? What are the inputs and tools used for creating one?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
73
 Some organizations prescribe the form and content for WBSs for particular projects. These are known as _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
74
 _____ is the tendency for project scope to keep getting bigger and bigger.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
75
 _____ involves developing a working replica of the system or some aspect of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
76
 List and briefly describe the six main processes involved in project scope management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
77
 _____ is a process for identifying and modeling business events, who initiated them, and how the system should respond to them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 77 في هذه المجموعة.