Deck 7: Project Cost Management

ملء الشاشة (f)
exit full mode
سؤال
 If an important supplier goes out of business, management reserves can be set aside to cover the resulting costs.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
 Estimates should become more accurate as time progresses.
سؤال
 In a bottom-up estimate, the size of the individual work items is one of the factors that drives the accuracy of the estimates.
سؤال
 IT project managers must be able to present and discuss project information both in financial and technical terms.
سؤال
 When deciding what projects to invest in or continue, one should include sunk costs.
سؤال
 Parametric models are reliable when the models are flexible in terms of the project's size.
سؤال
 Budgetary estimates are made even before a project is officially started.
سؤال
 A budgetary estimate is the most accurate of the three types of estimates.
سؤال
 Contingency reserves are also known as unknown unknowns.
سؤال
 Overrun is the additional percentage amount by which estimates exceed actual costs.
سؤال
 Intangible costs can be easily measured in monetary terms.
سؤال
 One of the reasons why project cost estimates are inaccurate is because human beings are biased toward underestimation.
سؤال
 Definitive estimates are made one year or less prior to project completion.
سؤال
 Analogous estimates are the most accurate technique to estimate costs.
سؤال
 Supporting details for an estimate include the ground rules and assumptions used in creating the estimate.
سؤال
 Analogous estimates are called activity-based costing.
سؤال
 Project managers must conduct cash flow analysis to determine net present value.
سؤال
 It is important for project managers to focus on indirect costs because they can be easily controlled.
سؤال
 A cost management plan can include organizational procedures links, control thresholds, and process descriptions.
سؤال
 The primary output of the planning cost management process is a change request.
سؤال
 Which statement is true of tangible costs?

A) They cannot be calculated in monetary terms.
B) They can be easily measured.
C) They are difficult to quantify.
D) Their examples include goodwill and prestige.
سؤال
 Which process helps develop an accurate projection of a project's financial expenses and benefits?

A) critical path analysis
B) fast tracking
C) life cycle costing
D) crashing
سؤال
 Which process involves allocating the overall cost estimate to individual work items to establish a baseline for measuring performance?

A) determining the budget
B) finalizing policies for project costs
C) controlling costs
D) estimating costs
سؤال
 What does the process of controlling costs primarily involve?

A) determining the policies for project costs
B) managing changes to the project budget
C) finalising the procedures for project costs
D) determining a basis for estimates
سؤال
 Which method is used for determining the estimated annual costs and benefits for a project?

A) Critical path analysis
B) Cash flow analysis
C) Present value analysis
D) Requirements analysis
سؤال
 In an earned value chart, when the actual cost line is right on or above the earned value line, it indicates that costs are less than planned.
سؤال
 It is important for project managers to understand that every cost estimate is unique.
سؤال
 If cost variance is a positive number, it means that performing the work costs more than planned.
سؤال
 If the cost performance index (CPI) is less than 100 percent, the project is under budget.
سؤال
 What type of management includes the processes required to ensure that a project team completes a project within an approved budget?

A) project scope management
B) project quality management
C) project time management
D) project cost management
سؤال
 The formulas for variances and indexes start with EV, the earned value.
سؤال
 Spreadsheets are a common tool for cost estimating, cost budgeting, and cost control.
سؤال
 A negative schedule variance means that it took less time than planned to perform the work.
سؤال
 Determining the budget involves allocating the project cost estimate to individual work items over time.
سؤال
 Which process results in a cost baseline as a main output?

A) cost controlling
B) cost estimating
C) cost budgeting
D) cost planning
سؤال
 Which process involves developing an approximation of the costs of resources needed to complete a project?

A) determining the budget
B) finalising the cost baseline
C) controlling costs
D) estimating costs
سؤال
 How are profits best defined?

A) expenses plus net income
B) costs plus revenues
C) revenues plus expenses
D) revenues minus expenditures
سؤال
 The project management plan and project funding requirements are inputs of the process of controlling costs.
سؤال
 Work performance information and cost forecasts are main outputs of which process?

A) cost budgeting
B) cost estimating
C) cost control
D) cost pricing
سؤال
 A schedule performance index of one means that the project is on schedule.
سؤال
 Which costs are difficult to measure in monetary terms?

A) Intangible costs
B) Direct costs
C) Tangible costs
D) Fixed costs
سؤال
 Which type of estimate uses the actual cost of a previous, similar project as the basis for estimating the cost of the current project?

A) definitive estimates
B) parametric estimates
C) bottom-up estimates
D) analogous estimates
سؤال
 Which statement is true of contingency reserves?

A) They allow for future situations that can be partially planned for.
B) They are also known as unknown unknowns.
C) They are not included in a cost baseline.
D) They allow for dollar amounts to be used to cover existing, fixed costs.
سؤال
 Which statement is true of a order of magnitude estimate?

A) It is used to allocate money into an organization's budget.
B) It provides an estimate of what a project will cost.
C) Its timeframe is always less than a year prior to project completion.
D) It is a type of estimate that is done in the final stages of a project.
سؤال
 Which reserves allow for future situations that are unpredictable?

A) Contingency reserves
B) Management reserves
C) Known unknowns
D) Cost baseline reserves
سؤال
 Which type of estimate should be used if the cost estimate for a project is used a basis for contract awards and performance reporting?

A) budgetary
B) definitive
C) rough order of magnitude
D) analogous
سؤال
 What is the first step in project cost management?

A) allocate project cost estimates to individual material resources
B) plan how costs will be managed
C) control project costs and monitor cost performance
D) develop several estimates of costs for different types of resources
سؤال
 What type of estimate is used for making many purchasing decisions for which accurate estimates are required and for estimating final project costs?

A) budgetary
B) definitive
C) rough order of magnitude
D) final
سؤال
 Newtech Inc. hires John for the position of a software programmer to work on their new project. Salary paid to John by Newtech Inc. would be an example of which type of costs?

A) direct
B) indirect
C) sunk
D) intangible
سؤال
 Which statement is true of bottom-up estimates?

A) They are based on the actual cost of a previous, similar project.
B) They are also known as parametric estimating.
C) They are most accurate when they involve large, extensive work items.
D) They are time-intensive and expensive to develop.
سؤال
 What type of estimate is a cost estimation tool used to allocate money into an organization's budget? 

A) budgetary
B) definitive
C) rough order of magnitude
D) ballpark
سؤال
 Which is most likely to be a reason for inaccuracies in information technology cost estimates?

A) Estimates take a long time to be worked out.
B) People lack estimating experience.
C) Human beings are biased toward overestimation.
D) Only software development provides the scope for estimates to be accurate.
سؤال
 Which statement is true regarding indirect costs?

A) directly related to performing the project.
B) those that cannot be allocated to projects.
C) those that can be easily controlled by managers.
D) not directly related to the products or services of a project.
سؤال
 What type of estimate is a cost estimation tool that involves estimating individual work items or activities and summing them to get a project total?

A) budgetary
B) parametric
C) bottom-up
D) analogous
سؤال
 What is a rough order of magnitude estimate also referred to as?

A) definitive
B) budgetary
C) final
D) ballpark
سؤال
 Soles is a footwear company which has recently set up its store in Ambrosia. To manufacture its products, Soles incurs a range of different costs. Which would be an example of an indirect cost?

A) Cost of machines to produce shoes
B) Salary paid to factory workers
C) Electricity used to run its factories
D) Cost of leather used to manufacture shoes
سؤال
 Which statement is true of analogous estimates?

A) Their main disadvantage is that they cost more than other techniques.
B) They are the only technique which do not require expert judgement.
C) They are most reliable when previous projects are similar in fact with current projects.
D) They use project characteristics in a mathematical model to estimate project costs.
سؤال
 Which type of estimating uses project characteristics in a mathematical model to estimate project costs?

A) rough order of magnitude estimating
B) parametric
C) bottom-up 
D) analogous
سؤال
 Good Earth, a company manufacturing packaged food products, sets up its stores in Baltonia. However, a year later, the company closes the store down due to high operating costs. In such a scenario, the money spent in paying for the rent of the store in Baltonia would be an example of which costs?

A) recurring
B) direct
C) sunk
D) intangible
سؤال
 What term is used for analogous estimates?

A) bottom-up
B) top-down
C) parametric
D) budgetary
سؤال
 _____ costing considers the total cost of ownership, or development plus support costs, for a project.
سؤال
 Which is true of the schedule performance index (SPI)?

A) It can be used to estimate the projected time to complete the project.
B) It means that a project is behind schedule if an SPI is greater than one.
C) It means that a project is ahead of schedule if SPI is lesser than one or hundred percent.
D) It is the ratio of planned value to actual costs.
سؤال
 _____ costing helps to see a big-picture view of the cost of a project throughout its life cycle.
سؤال
 Which statement best defines cost variance?

A) planned value plus actual costs
B) earned value minus the actual cost
C) rate of performance minus earned value
D) planned value minus the rate of performance
سؤال
 The main goal of which process is to produce a cost baseline for measuring project performance and project funding requirements?

A) cost budgeting
B) cost planning
C) cost controlling
D) cost estimating
سؤال
 _____ theory states that when many items are produced repetitively, the unit cost of those items decreases in a regular pattern as more units are produced.
سؤال
 What is the purpose of a cost performance index (CPI)?

A) indicate that a project is under budget if CPI is less than one
B) estimate the projected cost of completing the project
C) indicate that the planned and actual costs are equal if CPI is more than one
D) estimate the ratio of earned value to planned value
سؤال
 What is another term used for budget?

A) earned value
B) actual cost
C) indirect cost
D) planned value
سؤال
 _____ are revenues minus expenditures.
سؤال
 Which is an input of the process of controlling costs?

A) cost forecasts
B) work performance data
C) change requests
D) scope baseline
سؤال
 The main outputs of the _____ process are activity cost estimates, basis of estimates, and project document updates.
سؤال
 The main output of the planning cost management process is a(n) _____.
سؤال
 Which is true of earned value?

A) It is the actual cost plus the planned cost.
B) It is based solely on the total cost estimate to be spent on an activity.
C) It is an estimate of the value of the physical work actually completed.
D) It is also known as the planned value.
سؤال
 The additional percentage or dollar amount by which actual costs exceed estimates is known as a(n) _____.
سؤال
 Variances are calculated by subtracting the actual cost from which value?

A) earned value
B) schedule variance
C) planned value
D) rate of performance
سؤال
 Project managers must conduct cash flow analysis to determine _____.
سؤال
 The main outputs of the _____ process are a cost performance baseline, project funding requirements, and project document updates.
سؤال
 Accountants define _____ as a resource sacrificed or foregone to to achieve a specific objective.
سؤال
 Which statement best defines schedule variance?

A) earned value minus the planned value
B) earned value minus the actual cost
C) planned value plus the earned value
D) planned value plus the rate of performance
سؤال
 Which is an output of the process of controlling costs?

A) cost forecasts
B) project funding requirements
C) basis of estimates
D) scope baselines
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/98
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Project Cost Management
1
 If an important supplier goes out of business, management reserves can be set aside to cover the resulting costs.
True
Explanation: Management reserves allow for future situations that are unpredictable. For example, if a project manager gets sick for two weeks or an important supplier goes out of business, management reserves could be set aside to cover the resulting costs.
2
 Estimates should become more accurate as time progresses.
True
Explanation: Estimates are usually done at various stages of a project and should become more accurate as time progresses.
3
 In a bottom-up estimate, the size of the individual work items is one of the factors that drives the accuracy of the estimates.
True
Explanation: The size of the individual work items and the experience of the estimators drive the accuracy of the estimates. Using smaller work items increases the accuracy of the cost estimate because the people assigned to do the work develop the cost estimate instead of someone unfamiliar with the work.
4
 IT project managers must be able to present and discuss project information both in financial and technical terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
5
 When deciding what projects to invest in or continue, one should include sunk costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
6
 Parametric models are reliable when the models are flexible in terms of the project's size.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
7
 Budgetary estimates are made even before a project is officially started.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
8
 A budgetary estimate is the most accurate of the three types of estimates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
9
 Contingency reserves are also known as unknown unknowns.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
10
 Overrun is the additional percentage amount by which estimates exceed actual costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
11
 Intangible costs can be easily measured in monetary terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
12
 One of the reasons why project cost estimates are inaccurate is because human beings are biased toward underestimation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
13
 Definitive estimates are made one year or less prior to project completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
14
 Analogous estimates are the most accurate technique to estimate costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
15
 Supporting details for an estimate include the ground rules and assumptions used in creating the estimate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
16
 Analogous estimates are called activity-based costing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
17
 Project managers must conduct cash flow analysis to determine net present value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
18
 It is important for project managers to focus on indirect costs because they can be easily controlled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
19
 A cost management plan can include organizational procedures links, control thresholds, and process descriptions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
20
 The primary output of the planning cost management process is a change request.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
21
 Which statement is true of tangible costs?

A) They cannot be calculated in monetary terms.
B) They can be easily measured.
C) They are difficult to quantify.
D) Their examples include goodwill and prestige.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
22
 Which process helps develop an accurate projection of a project's financial expenses and benefits?

A) critical path analysis
B) fast tracking
C) life cycle costing
D) crashing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
23
 Which process involves allocating the overall cost estimate to individual work items to establish a baseline for measuring performance?

A) determining the budget
B) finalizing policies for project costs
C) controlling costs
D) estimating costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
24
 What does the process of controlling costs primarily involve?

A) determining the policies for project costs
B) managing changes to the project budget
C) finalising the procedures for project costs
D) determining a basis for estimates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
25
 Which method is used for determining the estimated annual costs and benefits for a project?

A) Critical path analysis
B) Cash flow analysis
C) Present value analysis
D) Requirements analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
26
 In an earned value chart, when the actual cost line is right on or above the earned value line, it indicates that costs are less than planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
27
 It is important for project managers to understand that every cost estimate is unique.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
28
 If cost variance is a positive number, it means that performing the work costs more than planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
29
 If the cost performance index (CPI) is less than 100 percent, the project is under budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
30
 What type of management includes the processes required to ensure that a project team completes a project within an approved budget?

A) project scope management
B) project quality management
C) project time management
D) project cost management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
31
 The formulas for variances and indexes start with EV, the earned value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
32
 Spreadsheets are a common tool for cost estimating, cost budgeting, and cost control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
33
 A negative schedule variance means that it took less time than planned to perform the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
34
 Determining the budget involves allocating the project cost estimate to individual work items over time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
35
 Which process results in a cost baseline as a main output?

A) cost controlling
B) cost estimating
C) cost budgeting
D) cost planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
36
 Which process involves developing an approximation of the costs of resources needed to complete a project?

A) determining the budget
B) finalising the cost baseline
C) controlling costs
D) estimating costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
37
 How are profits best defined?

A) expenses plus net income
B) costs plus revenues
C) revenues plus expenses
D) revenues minus expenditures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
38
 The project management plan and project funding requirements are inputs of the process of controlling costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
39
 Work performance information and cost forecasts are main outputs of which process?

A) cost budgeting
B) cost estimating
C) cost control
D) cost pricing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
40
 A schedule performance index of one means that the project is on schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
41
 Which costs are difficult to measure in monetary terms?

A) Intangible costs
B) Direct costs
C) Tangible costs
D) Fixed costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
42
 Which type of estimate uses the actual cost of a previous, similar project as the basis for estimating the cost of the current project?

A) definitive estimates
B) parametric estimates
C) bottom-up estimates
D) analogous estimates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
43
 Which statement is true of contingency reserves?

A) They allow for future situations that can be partially planned for.
B) They are also known as unknown unknowns.
C) They are not included in a cost baseline.
D) They allow for dollar amounts to be used to cover existing, fixed costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
44
 Which statement is true of a order of magnitude estimate?

A) It is used to allocate money into an organization's budget.
B) It provides an estimate of what a project will cost.
C) Its timeframe is always less than a year prior to project completion.
D) It is a type of estimate that is done in the final stages of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
45
 Which reserves allow for future situations that are unpredictable?

A) Contingency reserves
B) Management reserves
C) Known unknowns
D) Cost baseline reserves
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
46
 Which type of estimate should be used if the cost estimate for a project is used a basis for contract awards and performance reporting?

A) budgetary
B) definitive
C) rough order of magnitude
D) analogous
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
47
 What is the first step in project cost management?

A) allocate project cost estimates to individual material resources
B) plan how costs will be managed
C) control project costs and monitor cost performance
D) develop several estimates of costs for different types of resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
48
 What type of estimate is used for making many purchasing decisions for which accurate estimates are required and for estimating final project costs?

A) budgetary
B) definitive
C) rough order of magnitude
D) final
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
49
 Newtech Inc. hires John for the position of a software programmer to work on their new project. Salary paid to John by Newtech Inc. would be an example of which type of costs?

A) direct
B) indirect
C) sunk
D) intangible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
50
 Which statement is true of bottom-up estimates?

A) They are based on the actual cost of a previous, similar project.
B) They are also known as parametric estimating.
C) They are most accurate when they involve large, extensive work items.
D) They are time-intensive and expensive to develop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
51
 What type of estimate is a cost estimation tool used to allocate money into an organization's budget? 

A) budgetary
B) definitive
C) rough order of magnitude
D) ballpark
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
52
 Which is most likely to be a reason for inaccuracies in information technology cost estimates?

A) Estimates take a long time to be worked out.
B) People lack estimating experience.
C) Human beings are biased toward overestimation.
D) Only software development provides the scope for estimates to be accurate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
53
 Which statement is true regarding indirect costs?

A) directly related to performing the project.
B) those that cannot be allocated to projects.
C) those that can be easily controlled by managers.
D) not directly related to the products or services of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
54
 What type of estimate is a cost estimation tool that involves estimating individual work items or activities and summing them to get a project total?

A) budgetary
B) parametric
C) bottom-up
D) analogous
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
55
 What is a rough order of magnitude estimate also referred to as?

A) definitive
B) budgetary
C) final
D) ballpark
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
56
 Soles is a footwear company which has recently set up its store in Ambrosia. To manufacture its products, Soles incurs a range of different costs. Which would be an example of an indirect cost?

A) Cost of machines to produce shoes
B) Salary paid to factory workers
C) Electricity used to run its factories
D) Cost of leather used to manufacture shoes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
57
 Which statement is true of analogous estimates?

A) Their main disadvantage is that they cost more than other techniques.
B) They are the only technique which do not require expert judgement.
C) They are most reliable when previous projects are similar in fact with current projects.
D) They use project characteristics in a mathematical model to estimate project costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
58
 Which type of estimating uses project characteristics in a mathematical model to estimate project costs?

A) rough order of magnitude estimating
B) parametric
C) bottom-up 
D) analogous
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
59
 Good Earth, a company manufacturing packaged food products, sets up its stores in Baltonia. However, a year later, the company closes the store down due to high operating costs. In such a scenario, the money spent in paying for the rent of the store in Baltonia would be an example of which costs?

A) recurring
B) direct
C) sunk
D) intangible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
60
 What term is used for analogous estimates?

A) bottom-up
B) top-down
C) parametric
D) budgetary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
61
 _____ costing considers the total cost of ownership, or development plus support costs, for a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
62
 Which is true of the schedule performance index (SPI)?

A) It can be used to estimate the projected time to complete the project.
B) It means that a project is behind schedule if an SPI is greater than one.
C) It means that a project is ahead of schedule if SPI is lesser than one or hundred percent.
D) It is the ratio of planned value to actual costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
63
 _____ costing helps to see a big-picture view of the cost of a project throughout its life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
64
 Which statement best defines cost variance?

A) planned value plus actual costs
B) earned value minus the actual cost
C) rate of performance minus earned value
D) planned value minus the rate of performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
65
 The main goal of which process is to produce a cost baseline for measuring project performance and project funding requirements?

A) cost budgeting
B) cost planning
C) cost controlling
D) cost estimating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
66
 _____ theory states that when many items are produced repetitively, the unit cost of those items decreases in a regular pattern as more units are produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
67
 What is the purpose of a cost performance index (CPI)?

A) indicate that a project is under budget if CPI is less than one
B) estimate the projected cost of completing the project
C) indicate that the planned and actual costs are equal if CPI is more than one
D) estimate the ratio of earned value to planned value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
68
 What is another term used for budget?

A) earned value
B) actual cost
C) indirect cost
D) planned value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
69
 _____ are revenues minus expenditures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
70
 Which is an input of the process of controlling costs?

A) cost forecasts
B) work performance data
C) change requests
D) scope baseline
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
71
 The main outputs of the _____ process are activity cost estimates, basis of estimates, and project document updates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
72
 The main output of the planning cost management process is a(n) _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
73
 Which is true of earned value?

A) It is the actual cost plus the planned cost.
B) It is based solely on the total cost estimate to be spent on an activity.
C) It is an estimate of the value of the physical work actually completed.
D) It is also known as the planned value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
74
 The additional percentage or dollar amount by which actual costs exceed estimates is known as a(n) _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
75
 Variances are calculated by subtracting the actual cost from which value?

A) earned value
B) schedule variance
C) planned value
D) rate of performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
76
 Project managers must conduct cash flow analysis to determine _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
77
 The main outputs of the _____ process are a cost performance baseline, project funding requirements, and project document updates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
78
 Accountants define _____ as a resource sacrificed or foregone to to achieve a specific objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
79
 Which statement best defines schedule variance?

A) earned value minus the planned value
B) earned value minus the actual cost
C) planned value plus the earned value
D) planned value plus the rate of performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
80
 Which is an output of the process of controlling costs?

A) cost forecasts
B) project funding requirements
C) basis of estimates
D) scope baselines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 98 في هذه المجموعة.