Deck 24: Measuring Output Rates

ملء الشاشة (f)
exit full mode
سؤال
The more frequently the activity occurs,the longer the time period should be when conducting a work sampling study.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The work measurement process creates labor standards based on the judgment of skilled observers.
سؤال
A larger sample size is required when the time estimate must be more certain.
سؤال
The performance rating factor in a time study is a totally objective measure.
سؤال
Elemental standard time data cannot be used to develop time standards for new work before production begins.
سؤال
The snap-back method of time study resets the stopwatch to zero on the completion of each work element.
سؤال
Special training is required for observers using work sampling.
سؤال
The standard time for a work element is found by multiplying the select time by a performance rating factor.
سؤال
The select time is the average observed time based only on representative times.
سؤال
Fatigue,rest,or unavoidable delays are not factored into a work standard by the performance rating factor.
سؤال
A work standard is the time required for a trained worker to perform a task following a prescribed method with normal effort and skill.
سؤال
A larger sample size is required when the job being studied is more consistent in completion time.
سؤال
The methods time measurement system is a predetermined data system.
سؤال
The predetermined data approach does not eliminate the need for time studies.
سؤال
A predetermined data approach to time standards can be completed only after actual production begins.
سؤال
When using work sampling,the times of day to collect data samples are selected at random over the length of the study.
سؤال
Time studies are appropriate for setting time standards for tasks that are different each time.
سؤال
A time study is the method most often used for setting time standards for a job.
سؤال
The key to creating a work standard is defining normal performance.
سؤال
A larger sample size is required when the job being studied is shorter in average duration.
سؤال
Which one of the following statements about work measurement is TRUE?

A)Work sampling is a technique to determine the proportion of time spent on different activities.
B)In determining the normal time for the cycle,using a rating factor less than one (1.0)will increase the total time allowed for a job to be performed,relative to the select time.
C)Machine standards are more difficult to develop than labor standards.
D)The time study method is most appropriate for non-repetitive jobs in which the nature of the task differs each time.
سؤال
To set a time standard for a machining operation,the least likely approach to be used is the:

A)time study method.
B)elemental standard data approach.
C)predetermined data approach.
D)work sampling method.
سؤال
A time study analyst is attempting to determine the standard time for a work element.She or he observes a worker performing the work element at a lower-than-average pace.How will this fact be reflected in the time standard that is eventually created?

A)The frequency of the work element per cycle will be increased.
B)The proportion of allowance time will be increased above 1.0.
C)The performance rating factor will be set less than 1.0.
D)The normal time for the work element will be increased.
سؤال
Garman observes a worker assembling peanut valves and records the data displayed in the table.What is the select time for this job element? <strong>Garman observes a worker assembling peanut valves and records the data displayed in the table.What is the select time for this job element?  </strong> A)15 seconds B)20 seconds C)25 seconds D)30 seconds <div style=padding-top: 35px>

A)15 seconds
B)20 seconds
C)25 seconds
D)30 seconds
سؤال
Work standards would NOT be helpful for management in which area?

A)developing costs for current and new products
B)determining current and projected capacity requirements for a given demand
C)comparing different routings for an item and evaluating new work methods and equipment
D)forecasting demand for current products
سؤال
An analyst using a time study approach:

A)observes the worker at random times,categorizing what he or she is doing at that time.
B)must rate the performance of the worker on each element of the total task.
C)divides the total task into micro-motions such as "reach" and "grasp" and then times the worker on each one.
D)should use all observations in determining the standard,regardless of how irregular they might be,to be fair to the worker.
سؤال
As the sample size increases in a work sampling study,the maximum error decreases.
سؤال
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the standard time for this job element? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the standard time for this job element?  </strong> A)6.0 minutes B)6.5 minutes C)6.9 minutes D)7.5 minutes <div style=padding-top: 35px>

A)6.0 minutes
B)6.5 minutes
C)6.9 minutes
D)7.5 minutes
سؤال
With a time study approach,the:

A)nature of the task can be different with each replication,and the standards will still be good.
B)skill of the observer is not very important.
C)sample size is a function of the desired precision of the time estimate.
D)sample size is typically larger than required for the work sampling approach.
سؤال
Timing the work elements using the snap-back method requires:

A)the worker to perform each job element as quickly as possible.
B)a larger sample size than using the continuous method.
C)the use of two stopwatches.
D)a smaller sample size than using the continuous method.
سؤال
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the normal time for this job element? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the normal time for this job element?  </strong> A)6.3 minutes B)7.6 minutes C)6.9 minutes D)6.0 minutes <div style=padding-top: 35px>

A)6.3 minutes
B)7.6 minutes
C)6.9 minutes
D)6.0 minutes
سؤال
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.25.The allowance factor for this endeavor is 5%.What is the standard time for this job element? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.25.The allowance factor for this endeavor is 5%.What is the standard time for this job element?  </strong> A)greater than or equal to 8.5 minutes B)less than 8.5 minutes but greater than or equal to 8.0 minutes C)less than 8.0 minutes but greater than or equal to 7.5 minutes D)less than 7.5 minutes <div style=padding-top: 35px>

A)greater than or equal to 8.5 minutes
B)less than 8.5 minutes but greater than or equal to 8.0 minutes
C)less than 8.0 minutes but greater than or equal to 7.5 minutes
D)less than 7.5 minutes
سؤال
The method used most often for setting time standards for a job is the:

A)elemental standard data approach.
B)time study method.
C)predetermined data approach.
D)work sampling method.
سؤال
Which one of the following statements about the time study method is TRUE?

A)It is most appropriate for "thinking" jobs such as an automobile mechanic's diagnosis of a problem.
B)It is used most often for setting time standards.
C)Using the time study method technique,time standards can be set for new jobs before production begins.
D)Performance ratings are not needed in the derivation of time standards.
سؤال
Keith assembles peanut valves and the recorded data is displayed in the table.What is the select time for this job element? <strong>Keith assembles peanut valves and the recorded data is displayed in the table.What is the select time for this job element?  </strong> A)greater than or equal to 3 minutes B)less than 3 minutes but greater than or equal to 2.7 minutes C)less than 2.7 minutes but greater than or equal to 2.4 minutes D)less than 2.4 minutes <div style=padding-top: 35px>

A)greater than or equal to 3 minutes
B)less than 3 minutes but greater than or equal to 2.7 minutes
C)less than 2.7 minutes but greater than or equal to 2.4 minutes
D)less than 2.4 minutes
سؤال
Keith assembles peanut valves and the recorded data is displayed in the table.During one of the cycles,he pauses to answer a phone call from his friend who suggests that he seek employment elsewhere.Keith fields calls with some regularity,but that's not considered part of his routine job responsibilities.What is the select time for this job element? <strong>Keith assembles peanut valves and the recorded data is displayed in the table.During one of the cycles,he pauses to answer a phone call from his friend who suggests that he seek employment elsewhere.Keith fields calls with some regularity,but that's not considered part of his routine job responsibilities.What is the select time for this job element?  </strong> A)greater than or equal to 3.2 minutes B)less than 3.2 minutes but greater than or equal to 2.8 minutes C)less than 2.8 minutes but greater than or equal to 2.4 minutes D)less than 2.4 minutes <div style=padding-top: 35px>

A)greater than or equal to 3.2 minutes
B)less than 3.2 minutes but greater than or equal to 2.8 minutes
C)less than 2.8 minutes but greater than or equal to 2.4 minutes
D)less than 2.4 minutes
سؤال
When using a time study approach,the standard time is the:

A)normal time per cycle multiplied by 1.0 plus the allowance.
B)select time multiplied by the rating factor,summed over all work elements.
C)select time plus z times the standard deviation.
D)normal time plus z times the standard deviation.
سؤال
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the select time for this job? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the select time for this job?  </strong> A)5 minutes B)6 minutes C)7 minutes D)8 minutes <div style=padding-top: 35px>

A)5 minutes
B)6 minutes
C)7 minutes
D)8 minutes
سؤال
Which one of the following statements about work measurement methods is TRUE?

A)The two methods of using a stopwatch in time studies are historical and snap-back.
B)The time study method is usually used for less-repetitive work with no definite work cycle.
C)With the time study method,the analyst assigns a performance rating factor (RF)to the work's performance.A value of RF greater than 1 means the worker is slower than a standard worker.
D)The work sampling method needs many observations.
سؤال
Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element? <strong>Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element?  </strong> A)less than 23 seconds B)greater than or equal to 23 seconds but less than 26 seconds C)greater than or equal to 26 seconds but less than 29 seconds D)greater than or equal to 29 seconds <div style=padding-top: 35px>

A)less than 23 seconds
B)greater than or equal to 23 seconds but less than 26 seconds
C)greater than or equal to 26 seconds but less than 29 seconds
D)greater than or equal to 29 seconds
سؤال
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.1 and all other elements receive a rating of 1.2.If work elements 1 and 3 are performed every other cycle,and elements 2 and 4 are performed every cycle,what is the normal time for the complete cycle?</strong> A)fewer than 45 seconds B)greater than or equal to 45 seconds but fewer than 48 seconds C)greater than or equal to 48 seconds but fewer than 51 seconds D)greater than or equal to 51 seconds <div style=padding-top: 35px>
Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.1 and all other elements receive a rating of 1.2.If work elements 1 and 3 are performed every other cycle,and elements 2 and 4 are performed every cycle,what is the normal time for the complete cycle?

A)fewer than 45 seconds
B)greater than or equal to 45 seconds but fewer than 48 seconds
C)greater than or equal to 48 seconds but fewer than 51 seconds
D)greater than or equal to 51 seconds
سؤال
With the use of the methods time measurement approach:

A)stopwatches are needed to time the elements that go together to make a task.
B)there is a problem of biased judgment because performance ratings are needed to derive standards.
C)work must be broken down into micro-motions.
D)an analyst consults tables that contain the select times for a variety of work elements.
سؤال
During a time study,the following times were observed for a particular job using the continuous (non-snapback)method: 22,51,72,98,128,and 150 seconds.There is only one element per cycle.The sample standard deviation of the observed times has already been computed as 3.9 seconds.If an estimate for the average time that is within 4 percent of the true long-range average 95 percent (z = 1.96)of the time is desired,how many additional observations are needed?

A)fewer than or equal to 40
B)greater than 40 but fewer than or equal to 55
C)greater than 55 but fewer than or equal to 70
D)greater than 70
سؤال
A major disadvantage of the work sampling method of work measurement is that:

A)observers must be specially trained.
B)only one study can be conducted at a time.
C)it can be used only in hospital settings.
D)a large number of observations are often required.
سؤال
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.What is the select time for work element 2?</strong> A)fewer than 12 seconds B)greater than or equal to 12 seconds but fewer than 13 seconds C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds D)greater than or equal to 14 seconds <div style=padding-top: 35px>
Use the information in Table H.1.What is the select time for work element 2?

A)fewer than 12 seconds
B)greater than or equal to 12 seconds but fewer than 13 seconds
C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds
D)greater than or equal to 14 seconds
سؤال
The advantage of using the predetermined data approach for setting standards is that:

A)it allows the setting of standards for a new job before production begins.
B)the predetermined data are representative of all workers,without question.
C)it does not require any special training to use it.
D)it can be used on jobs in which the times to perform the micro-motions are sequence dependent.
سؤال
When using the MTM approach:

A)stopwatches are needed to time the elements that go together to make a task.
B)there is a problem of biased judgment because performance ratings are needed to derive standards.
C)an analyst consults tables that contain the select times for a variety of work elements.
D)new work methods can be compared without conducting a time study.
سؤال
An industrial engineer is conducting a time study for a work element.The select time is 7.5 minutes,and the sample standard deviation of the observed time is one minute.What is the appropriate sample size if the estimate is to be 3 percent of the true average time 95 percent of the time (z = 1.96)?

A)fewer than or equal to 70
B)greater than 70 but fewer than or equal to 80
C)greater than 80 but fewer than or equal to 90
D)greater than 90
سؤال
The work measurement technique that breaks down tasks into a series of generic micro-motions is the:

A)time study method.
B)elemental standard data approach.
C)predetermined data approach.
D)work sampling method.
سؤال
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Work element 1 receives a performance rating factor of 1.4 and is performed every other cycle.If the company uses an allowance time of 15 percent,what is the standard time for this work element?</strong> A)fewer than 12 seconds B)greater than or equal to 12 seconds but fewer than 13 seconds C)greater than or equal to 13 seconds but fewer than 14 seconds D)greater than or equal to 14 seconds <div style=padding-top: 35px>
Use the information in Table H.1.Work element 1 receives a performance rating factor of 1.4 and is performed every other cycle.If the company uses an allowance time of 15 percent,what is the standard time for this work element?

A)fewer than 12 seconds
B)greater than or equal to 12 seconds but fewer than 13 seconds
C)greater than or equal to 13 seconds but fewer than 14 seconds
D)greater than or equal to 14 seconds
سؤال
A time study analyst is determining the standard time for a work element.The select time is 6.0 minutes,and the standard deviation of the select time is 2.2 minutes,based on a pilot sample of 20 observations.What is the appropriate sample size if the estimate for the select time is to be within 10 percent of the true average time 95 percent of the time (z = 1.96)?

A)fewer than 30 observations
B)greater than or equal to 30 observations but fewer than 40 observations
C)greater than or equal to 40 observations but fewer than or equal to 50 observations
D)greater than or equal to 50 observations
سؤال
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Assuming that work element 4 receives a performance rating factor of 1.2 and is performed once per cycle,what is the normal time for this work element?</strong> A)fewer than 10 seconds B)greater than or equal to 10 seconds but fewer than 11 seconds C)greater than or equal to 11 seconds but fewer than 12 seconds D)greater than or equal to 12 seconds <div style=padding-top: 35px>
Use the information in Table H.1.Assuming that work element 4 receives a performance rating factor of 1.2 and is performed once per cycle,what is the normal time for this work element?

A)fewer than 10 seconds
B)greater than or equal to 10 seconds but fewer than 11 seconds
C)greater than or equal to 11 seconds but fewer than 12 seconds
D)greater than or equal to 12 seconds
سؤال
Table H.2
<strong>Table H.2   Use the information in Table H.2.If the allowance for this task is 20 percent,what is the standard time for the entire task?</strong> A)fewer than 20 seconds B)greater than or equal to 20 seconds but fewer than 22 seconds C)greater than or equal to 22 seconds but fewer than 24 seconds D)greater than 24 seconds <div style=padding-top: 35px>
Use the information in Table H.2.If the allowance for this task is 20 percent,what is the standard time for the entire task?

A)fewer than 20 seconds
B)greater than or equal to 20 seconds but fewer than 22 seconds
C)greater than or equal to 22 seconds but fewer than 24 seconds
D)greater than 24 seconds
سؤال
Which of the following is TRUE regarding the MTM approach?

A)A performance rating factor greater than 1.0 means the worker under observation is working slowly.
B)A frequency of less than 1.0 means that the job element is not performed during every cycle.
C)A performance rating factor less than 1.0 means the worker under observation is not producing output that has high quality.
D)A negative allowance time means that the worker under observation is taking excessive breaks.
سؤال
A worker was observed for four cycles of a repetitive task.The observer used the continuous method for recording the times.The continuous times (in seconds)for each element are: <strong>A worker was observed for four cycles of a repetitive task.The observer used the continuous method for recording the times.The continuous times (in seconds)for each element are:   Which one of the following are the select times (   )for each element? The first number is the select time for the first element,the second number is the select time for the second element,and so on.</strong> A)19.5,23,25,30 B)1.5,3.5,5,2 C)2,3,2,5 D)1.5,3.5,2,5 <div style=padding-top: 35px> Which one of the following are the "select times" ( <strong>A worker was observed for four cycles of a repetitive task.The observer used the continuous method for recording the times.The continuous times (in seconds)for each element are:   Which one of the following are the select times (   )for each element? The first number is the select time for the first element,the second number is the select time for the second element,and so on.</strong> A)19.5,23,25,30 B)1.5,3.5,5,2 C)2,3,2,5 D)1.5,3.5,2,5 <div style=padding-top: 35px> )for each element? The first number is the select time for the first element,the second number is the select time for the second element,and so on.

A)19.5,23,25,30
B)1.5,3.5,5,2
C)2,3,2,5
D)1.5,3.5,2,5
سؤال
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.What is the select time for work element 3?</strong> A)fewer than 12 seconds B)greater than or equal to 12 seconds but fewer than 13 seconds C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds D)greater than or equal to 14 seconds <div style=padding-top: 35px>
Use the information in Table H.1.What is the select time for work element 3?

A)fewer than 12 seconds
B)greater than or equal to 12 seconds but fewer than 13 seconds
C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds
D)greater than or equal to 14 seconds
سؤال
An industrial engineer is conducting a time study for a work element.The select time is 4.5 minutes,and the sample standard deviation of the observed time is 20 seconds.What is the appropriate sample size if the estimate is to be 5 percent of the true average time 95 percent of the time?

A)fewer than or equal to seven
B)greater than seven but fewer than or equal to eight
C)greater than eight but fewer than or equal to nine
D)greater than nine
سؤال
With the use of the elemental standard data approach:

A)there is no need to estimate allowances.
B)managers can develop standards for new work before production begins.
C)time studies are not needed.
D)the need to specify job variables that affect times for each work element is eliminated.
سؤال
Table H.2
<strong>Table H.2   Use the information in Table H.2.Which work element will take the longest for an average worker to perform per cycle?</strong> A)work element 1 B)work element 2 C)work element 3 D)work element 4 <div style=padding-top: 35px>
Use the information in Table H.2.Which work element will take the longest for an average worker to perform per cycle?

A)work element 1
B)work element 2
C)work element 3
D)work element 4
سؤال
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.2 and all other elements receive a rating of 1.1.If work element 2 is performed every other cycle but every other element is performed every cycle,and the company has an allowance time of 0.10,what is the standard time for the complete cycle?</strong> A)fewer than 45 seconds B)greater than or equal to 45 seconds but fewer than 50 seconds C)greater than or equal to 50 seconds but fewer than 55 seconds D)greater than or equal to 55 seconds <div style=padding-top: 35px>
Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.2 and all other elements receive a rating of 1.1.If work element 2 is performed every other cycle but every other element is performed every cycle,and the company has an allowance time of 0.10,what is the standard time for the complete cycle?

A)fewer than 45 seconds
B)greater than or equal to 45 seconds but fewer than 50 seconds
C)greater than or equal to 50 seconds but fewer than 55 seconds
D)greater than or equal to 55 seconds
سؤال
A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis. <strong>A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis.   If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many MORE observations are needed?</strong> A)fewer than or equal to 700 B)greater than 700 but fewer than or equal to 800 C)greater than 800 but fewer than or equal to 900 D)greater than 900 <div style=padding-top: 35px> If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many MORE observations are needed?

A)fewer than or equal to 700
B)greater than 700 but fewer than or equal to 800
C)greater than 800 but fewer than or equal to 900
D)greater than 900
سؤال
A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis. <strong>A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis.   If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many more observations are needed?</strong> A)fewer than or equal to 600 B)greater than 600 but fewer than or equal to 800 C)greater than 800 but fewer than or equal to 1,000 D)greater than 1,000 <div style=padding-top: 35px> If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many more observations are needed?

A)fewer than or equal to 600
B)greater than 600 but fewer than or equal to 800
C)greater than 800 but fewer than or equal to 1,000
D)greater than 1,000
سؤال
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the normal time for the complete cycle?</strong> A)fewer than 85 seconds B)greater than or equal to 85 seconds but fewer than 95 seconds C)greater than or equal to 95 seconds but fewer than 105 seconds D)greater than or equal to 105 seconds <div style=padding-top: 35px>
Use the information in Table H.3.What is the normal time for the complete cycle?

A)fewer than 85 seconds
B)greater than or equal to 85 seconds but fewer than 95 seconds
C)greater than or equal to 95 seconds but fewer than 105 seconds
D)greater than or equal to 105 seconds
سؤال
A worker was observed for four cycles of a repetitive operation.The observed times for work elements are 11,10,8,and 11 seconds,respectively.What sample size is appropriate for estimating the time for this work element within + 3 percent of the true mean time with 95 percent confidence (z = 1.96)?

A)fewer than or equal to 70
B)greater than 70 but fewer than or equal to 75
C)greater than 75 but fewer than or equal to 80
D)greater than 80
سؤال
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the normal time for work element 2?</strong> A)fewer than 10 seconds B)greater than or equal to 10 seconds but fewer than 11 seconds C)greater than or equal to 11 seconds but fewer than 12 seconds D)greater than or equal to 12 seconds <div style=padding-top: 35px>
Use the information in Table H.3.What is the normal time for work element 2?

A)fewer than 10 seconds
B)greater than or equal to 10 seconds but fewer than 11 seconds
C)greater than or equal to 11 seconds but fewer than 12 seconds
D)greater than or equal to 12 seconds
سؤال
A time study analyst has found the select time for a work element to be 14.0 minutes,with a sample standard deviation of 3.2 minutes.What is the minimum sample size needed if the estimate is to be within 4 percent of the average 95 percent of the time (z = 1.96)?

A)fewer than 100
B)greater than or equal to 100 but fewer than 140
C)greater than or equal to 140 but fewer than 180
D)greater than or equal to 180
سؤال
A manager wants to determine the proportion of time a cashier is idle.A work sampling method was used,and the idle time was found to be 20 percent based on 100 observations.If the manager wants a + 0.05 with a 95 percent confidence level (z = 1.96),how many MORE observations are needed?

A)fewer than or equal to 200
B)greater than 200 but fewer than or equal to 300
C)greater than 300 but fewer than or equal to 400
D)greater than 400
سؤال
The process of creating labor standards based on the judgment of skilled observers is ________.
سؤال
The following times in seconds were observed for a particular one-element job using the continuous method: 12,22,35,and 50.The worker's rating factor is 1.1.What is the standard time for the job if an allowance of 20 percent is provided?

A)fewer than or equal to 14 seconds
B)greater than 14 but fewer than or equal to 15 seconds
C)greater than 15 but fewer than or equal to 16 seconds
D)greater than 16
سؤال
A time study analysis was performed on a task with two work elements.The select times for these work elements are 21.0 seconds and 13.0 seconds,with rating factors of 1.1 and 1.2,respectively.Each work element is performed twice per cycle.If an allowance of 20 percent is used,what is the standard time for this task?

A)fewer than 50 seconds
B)greater than or equal to 50 seconds but fewer than 70 seconds
C)greater than or equal to 70 seconds but fewer than 90 seconds
D)greater than or equal to 90 seconds
سؤال
A(n)________ is the time required for a trained worker to perform a task following a prescribed method with normal effort and skill.
سؤال
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the standard time for work element 1?</strong> A)fewer than 18 seconds B)greater than or equal to 18 seconds but fewer than 20 seconds C)greater than or equal to 20 seconds but fewer than 22 seconds D)greater than or equal to 22 seconds <div style=padding-top: 35px>
Use the information in Table H.3.What is the standard time for work element 1?

A)fewer than 18 seconds
B)greater than or equal to 18 seconds but fewer than 20 seconds
C)greater than or equal to 20 seconds but fewer than 22 seconds
D)greater than or equal to 22 seconds
سؤال
A job shop manager wants to determine the proportion of time the workers are idle.The shop employs two types of workers.Type 1 includes three workers and Type 2 includes two workers.The manager suspects that the proportion of idle time is about 20 percent for Type 1 workers and 15 percent for Type 2 workers.If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.05,how many trips will the observers have to take through the group?

A)fewer than or equal to 80
B)greater than 80 but fewer than or equal to 90
C)greater than 90 but fewer than or equal to 100
D)greater than 100
سؤال
If a worker spends 10 hours per day performing a task,and the allowance for this task is 19 percent,how many hours during the average day is the worker involved in nonproductive activities?

A)fewer than 1.75
B)greater than or equal to 1.75 hours but fewer than 5 hours
C)greater than or equal to 5.00 hours but fewer than 8.25
D)greater than or equal to 8.25 hours
سؤال
An observer has recorded the following select ( <strong>An observer has recorded the following select (   )for a five-part task and has applied a rating factor (RF)to each.The times are in seconds.If there is a 15 percent allowance for nonproductive activities,compute the standard time for the total task.   The standard time for the task is:</strong> A)fewer than or equal to 21 seconds. B)greater than 21 seconds but fewer than or equal to 23 seconds. C)greater than 23 seconds but fewer than or equal to 25 seconds. D)greater than 25 seconds. <div style=padding-top: 35px> )for a five-part task and has applied a rating factor (RF)to each.The times are in seconds.If there is a 15 percent allowance for "nonproductive" activities,compute the standard time for the total task. <strong>An observer has recorded the following select (   )for a five-part task and has applied a rating factor (RF)to each.The times are in seconds.If there is a 15 percent allowance for nonproductive activities,compute the standard time for the total task.   The standard time for the task is:</strong> A)fewer than or equal to 21 seconds. B)greater than 21 seconds but fewer than or equal to 23 seconds. C)greater than 23 seconds but fewer than or equal to 25 seconds. D)greater than 25 seconds. <div style=padding-top: 35px> The standard time for the task is:

A)fewer than or equal to 21 seconds.
B)greater than 21 seconds but fewer than or equal to 23 seconds.
C)greater than 23 seconds but fewer than or equal to 25 seconds.
D)greater than 25 seconds.
سؤال
At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF)for each element. <strong>At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF)for each element.   The standard time for this job,assuming that the allowance is 18 percent,is:</strong> A)fewer than or equal to 1.9 minutes. B)greater than 1.9 minutes but fewer than or equal to 2.0 minutes. C)greater than 2.0 minutes but fewer than or equal to 2.1 minutes. D)greater than 2.1 minutes. <div style=padding-top: 35px> The standard time for this job,assuming that the allowance is 18 percent,is:

A)fewer than or equal to 1.9 minutes.
B)greater than 1.9 minutes but fewer than or equal to 2.0 minutes.
C)greater than 2.0 minutes but fewer than or equal to 2.1 minutes.
D)greater than 2.1 minutes.
سؤال
A supermarket administrator suspects that idle time is about 20 percent for the cashier and 15 percent for the office clerk.If the administrator wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.05 for both cashier and office clerk,how many TOTAL observations are needed?

A)fewer than or equal to 200
B)greater than 200 but fewer than or equal to 300
C)greater than 300 but fewer than or equal to 400
D)greater than 400
سؤال
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the select time for work element 2?</strong> A)fewer than 17 seconds B)greater than or equal to 17 seconds but fewer than 22 seconds C)greater than or equal to 22 seconds but fewer than or equal to 27 seconds D)greater than or equal to 27 seconds <div style=padding-top: 35px>
Use the information in Table H.3.What is the select time for work element 2?

A)fewer than 17 seconds
B)greater than or equal to 17 seconds but fewer than 22 seconds
C)greater than or equal to 22 seconds but fewer than or equal to 27 seconds
D)greater than or equal to 27 seconds
سؤال
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the select time for work element 4?</strong> A)fewer than 40 seconds B)greater than or equal to 40 seconds but fewer than 60 seconds C)greater than or equal to 60 seconds but fewer than or equal to 80 seconds D)greater than or equal to 80 seconds <div style=padding-top: 35px>
Use the information in Table H.3.What is the select time for work element 4?

A)fewer than 40 seconds
B)greater than or equal to 40 seconds but fewer than 60 seconds
C)greater than or equal to 60 seconds but fewer than or equal to 80 seconds
D)greater than or equal to 80 seconds
سؤال
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the standard time for the complete cycle?</strong> A)fewer than 90 seconds B)greater than or equal to 90 seconds but fewer than 97 seconds C)greater than or equal to 97 seconds but fewer than 104 seconds D)greater than or equal to 104 seconds <div style=padding-top: 35px>
Use the information in Table H.3.What is the standard time for the complete cycle?

A)fewer than 90 seconds
B)greater than or equal to 90 seconds but fewer than 97 seconds
C)greater than or equal to 97 seconds but fewer than 104 seconds
D)greater than or equal to 104 seconds
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/103
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 24: Measuring Output Rates
1
The more frequently the activity occurs,the longer the time period should be when conducting a work sampling study.
False
2
The work measurement process creates labor standards based on the judgment of skilled observers.
True
3
A larger sample size is required when the time estimate must be more certain.
True
4
The performance rating factor in a time study is a totally objective measure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
5
Elemental standard time data cannot be used to develop time standards for new work before production begins.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
6
The snap-back method of time study resets the stopwatch to zero on the completion of each work element.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
7
Special training is required for observers using work sampling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
8
The standard time for a work element is found by multiplying the select time by a performance rating factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
9
The select time is the average observed time based only on representative times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
10
Fatigue,rest,or unavoidable delays are not factored into a work standard by the performance rating factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
11
A work standard is the time required for a trained worker to perform a task following a prescribed method with normal effort and skill.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
12
A larger sample size is required when the job being studied is more consistent in completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
13
The methods time measurement system is a predetermined data system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
14
The predetermined data approach does not eliminate the need for time studies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
15
A predetermined data approach to time standards can be completed only after actual production begins.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
16
When using work sampling,the times of day to collect data samples are selected at random over the length of the study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
17
Time studies are appropriate for setting time standards for tasks that are different each time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
18
A time study is the method most often used for setting time standards for a job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
19
The key to creating a work standard is defining normal performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
20
A larger sample size is required when the job being studied is shorter in average duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which one of the following statements about work measurement is TRUE?

A)Work sampling is a technique to determine the proportion of time spent on different activities.
B)In determining the normal time for the cycle,using a rating factor less than one (1.0)will increase the total time allowed for a job to be performed,relative to the select time.
C)Machine standards are more difficult to develop than labor standards.
D)The time study method is most appropriate for non-repetitive jobs in which the nature of the task differs each time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
22
To set a time standard for a machining operation,the least likely approach to be used is the:

A)time study method.
B)elemental standard data approach.
C)predetermined data approach.
D)work sampling method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
23
A time study analyst is attempting to determine the standard time for a work element.She or he observes a worker performing the work element at a lower-than-average pace.How will this fact be reflected in the time standard that is eventually created?

A)The frequency of the work element per cycle will be increased.
B)The proportion of allowance time will be increased above 1.0.
C)The performance rating factor will be set less than 1.0.
D)The normal time for the work element will be increased.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
24
Garman observes a worker assembling peanut valves and records the data displayed in the table.What is the select time for this job element? <strong>Garman observes a worker assembling peanut valves and records the data displayed in the table.What is the select time for this job element?  </strong> A)15 seconds B)20 seconds C)25 seconds D)30 seconds

A)15 seconds
B)20 seconds
C)25 seconds
D)30 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
25
Work standards would NOT be helpful for management in which area?

A)developing costs for current and new products
B)determining current and projected capacity requirements for a given demand
C)comparing different routings for an item and evaluating new work methods and equipment
D)forecasting demand for current products
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
26
An analyst using a time study approach:

A)observes the worker at random times,categorizing what he or she is doing at that time.
B)must rate the performance of the worker on each element of the total task.
C)divides the total task into micro-motions such as "reach" and "grasp" and then times the worker on each one.
D)should use all observations in determining the standard,regardless of how irregular they might be,to be fair to the worker.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
27
As the sample size increases in a work sampling study,the maximum error decreases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
28
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the standard time for this job element? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the standard time for this job element?  </strong> A)6.0 minutes B)6.5 minutes C)6.9 minutes D)7.5 minutes

A)6.0 minutes
B)6.5 minutes
C)6.9 minutes
D)7.5 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
29
With a time study approach,the:

A)nature of the task can be different with each replication,and the standards will still be good.
B)skill of the observer is not very important.
C)sample size is a function of the desired precision of the time estimate.
D)sample size is typically larger than required for the work sampling approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
30
Timing the work elements using the snap-back method requires:

A)the worker to perform each job element as quickly as possible.
B)a larger sample size than using the continuous method.
C)the use of two stopwatches.
D)a smaller sample size than using the continuous method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
31
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the normal time for this job element? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the normal time for this job element?  </strong> A)6.3 minutes B)7.6 minutes C)6.9 minutes D)6.0 minutes

A)6.3 minutes
B)7.6 minutes
C)6.9 minutes
D)6.0 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
32
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.25.The allowance factor for this endeavor is 5%.What is the standard time for this job element? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.25.The allowance factor for this endeavor is 5%.What is the standard time for this job element?  </strong> A)greater than or equal to 8.5 minutes B)less than 8.5 minutes but greater than or equal to 8.0 minutes C)less than 8.0 minutes but greater than or equal to 7.5 minutes D)less than 7.5 minutes

A)greater than or equal to 8.5 minutes
B)less than 8.5 minutes but greater than or equal to 8.0 minutes
C)less than 8.0 minutes but greater than or equal to 7.5 minutes
D)less than 7.5 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
33
The method used most often for setting time standards for a job is the:

A)elemental standard data approach.
B)time study method.
C)predetermined data approach.
D)work sampling method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which one of the following statements about the time study method is TRUE?

A)It is most appropriate for "thinking" jobs such as an automobile mechanic's diagnosis of a problem.
B)It is used most often for setting time standards.
C)Using the time study method technique,time standards can be set for new jobs before production begins.
D)Performance ratings are not needed in the derivation of time standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
35
Keith assembles peanut valves and the recorded data is displayed in the table.What is the select time for this job element? <strong>Keith assembles peanut valves and the recorded data is displayed in the table.What is the select time for this job element?  </strong> A)greater than or equal to 3 minutes B)less than 3 minutes but greater than or equal to 2.7 minutes C)less than 2.7 minutes but greater than or equal to 2.4 minutes D)less than 2.4 minutes

A)greater than or equal to 3 minutes
B)less than 3 minutes but greater than or equal to 2.7 minutes
C)less than 2.7 minutes but greater than or equal to 2.4 minutes
D)less than 2.4 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
36
Keith assembles peanut valves and the recorded data is displayed in the table.During one of the cycles,he pauses to answer a phone call from his friend who suggests that he seek employment elsewhere.Keith fields calls with some regularity,but that's not considered part of his routine job responsibilities.What is the select time for this job element? <strong>Keith assembles peanut valves and the recorded data is displayed in the table.During one of the cycles,he pauses to answer a phone call from his friend who suggests that he seek employment elsewhere.Keith fields calls with some regularity,but that's not considered part of his routine job responsibilities.What is the select time for this job element?  </strong> A)greater than or equal to 3.2 minutes B)less than 3.2 minutes but greater than or equal to 2.8 minutes C)less than 2.8 minutes but greater than or equal to 2.4 minutes D)less than 2.4 minutes

A)greater than or equal to 3.2 minutes
B)less than 3.2 minutes but greater than or equal to 2.8 minutes
C)less than 2.8 minutes but greater than or equal to 2.4 minutes
D)less than 2.4 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
37
When using a time study approach,the standard time is the:

A)normal time per cycle multiplied by 1.0 plus the allowance.
B)select time multiplied by the rating factor,summed over all work elements.
C)select time plus z times the standard deviation.
D)normal time plus z times the standard deviation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
38
The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the select time for this job? <strong>The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning.He has done this several times,so he assigns himself a rating of 1.15.The allowance factor for this endeavor is 5%.What is the select time for this job?  </strong> A)5 minutes B)6 minutes C)7 minutes D)8 minutes

A)5 minutes
B)6 minutes
C)7 minutes
D)8 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which one of the following statements about work measurement methods is TRUE?

A)The two methods of using a stopwatch in time studies are historical and snap-back.
B)The time study method is usually used for less-repetitive work with no definite work cycle.
C)With the time study method,the analyst assigns a performance rating factor (RF)to the work's performance.A value of RF greater than 1 means the worker is slower than a standard worker.
D)The work sampling method needs many observations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
40
Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element? <strong>Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element?  </strong> A)less than 23 seconds B)greater than or equal to 23 seconds but less than 26 seconds C)greater than or equal to 26 seconds but less than 29 seconds D)greater than or equal to 29 seconds

A)less than 23 seconds
B)greater than or equal to 23 seconds but less than 26 seconds
C)greater than or equal to 26 seconds but less than 29 seconds
D)greater than or equal to 29 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
41
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.1 and all other elements receive a rating of 1.2.If work elements 1 and 3 are performed every other cycle,and elements 2 and 4 are performed every cycle,what is the normal time for the complete cycle?</strong> A)fewer than 45 seconds B)greater than or equal to 45 seconds but fewer than 48 seconds C)greater than or equal to 48 seconds but fewer than 51 seconds D)greater than or equal to 51 seconds
Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.1 and all other elements receive a rating of 1.2.If work elements 1 and 3 are performed every other cycle,and elements 2 and 4 are performed every cycle,what is the normal time for the complete cycle?

A)fewer than 45 seconds
B)greater than or equal to 45 seconds but fewer than 48 seconds
C)greater than or equal to 48 seconds but fewer than 51 seconds
D)greater than or equal to 51 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
42
With the use of the methods time measurement approach:

A)stopwatches are needed to time the elements that go together to make a task.
B)there is a problem of biased judgment because performance ratings are needed to derive standards.
C)work must be broken down into micro-motions.
D)an analyst consults tables that contain the select times for a variety of work elements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
43
During a time study,the following times were observed for a particular job using the continuous (non-snapback)method: 22,51,72,98,128,and 150 seconds.There is only one element per cycle.The sample standard deviation of the observed times has already been computed as 3.9 seconds.If an estimate for the average time that is within 4 percent of the true long-range average 95 percent (z = 1.96)of the time is desired,how many additional observations are needed?

A)fewer than or equal to 40
B)greater than 40 but fewer than or equal to 55
C)greater than 55 but fewer than or equal to 70
D)greater than 70
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
44
A major disadvantage of the work sampling method of work measurement is that:

A)observers must be specially trained.
B)only one study can be conducted at a time.
C)it can be used only in hospital settings.
D)a large number of observations are often required.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
45
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.What is the select time for work element 2?</strong> A)fewer than 12 seconds B)greater than or equal to 12 seconds but fewer than 13 seconds C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds D)greater than or equal to 14 seconds
Use the information in Table H.1.What is the select time for work element 2?

A)fewer than 12 seconds
B)greater than or equal to 12 seconds but fewer than 13 seconds
C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds
D)greater than or equal to 14 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
46
The advantage of using the predetermined data approach for setting standards is that:

A)it allows the setting of standards for a new job before production begins.
B)the predetermined data are representative of all workers,without question.
C)it does not require any special training to use it.
D)it can be used on jobs in which the times to perform the micro-motions are sequence dependent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
47
When using the MTM approach:

A)stopwatches are needed to time the elements that go together to make a task.
B)there is a problem of biased judgment because performance ratings are needed to derive standards.
C)an analyst consults tables that contain the select times for a variety of work elements.
D)new work methods can be compared without conducting a time study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
48
An industrial engineer is conducting a time study for a work element.The select time is 7.5 minutes,and the sample standard deviation of the observed time is one minute.What is the appropriate sample size if the estimate is to be 3 percent of the true average time 95 percent of the time (z = 1.96)?

A)fewer than or equal to 70
B)greater than 70 but fewer than or equal to 80
C)greater than 80 but fewer than or equal to 90
D)greater than 90
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
49
The work measurement technique that breaks down tasks into a series of generic micro-motions is the:

A)time study method.
B)elemental standard data approach.
C)predetermined data approach.
D)work sampling method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
50
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Work element 1 receives a performance rating factor of 1.4 and is performed every other cycle.If the company uses an allowance time of 15 percent,what is the standard time for this work element?</strong> A)fewer than 12 seconds B)greater than or equal to 12 seconds but fewer than 13 seconds C)greater than or equal to 13 seconds but fewer than 14 seconds D)greater than or equal to 14 seconds
Use the information in Table H.1.Work element 1 receives a performance rating factor of 1.4 and is performed every other cycle.If the company uses an allowance time of 15 percent,what is the standard time for this work element?

A)fewer than 12 seconds
B)greater than or equal to 12 seconds but fewer than 13 seconds
C)greater than or equal to 13 seconds but fewer than 14 seconds
D)greater than or equal to 14 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
51
A time study analyst is determining the standard time for a work element.The select time is 6.0 minutes,and the standard deviation of the select time is 2.2 minutes,based on a pilot sample of 20 observations.What is the appropriate sample size if the estimate for the select time is to be within 10 percent of the true average time 95 percent of the time (z = 1.96)?

A)fewer than 30 observations
B)greater than or equal to 30 observations but fewer than 40 observations
C)greater than or equal to 40 observations but fewer than or equal to 50 observations
D)greater than or equal to 50 observations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
52
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Assuming that work element 4 receives a performance rating factor of 1.2 and is performed once per cycle,what is the normal time for this work element?</strong> A)fewer than 10 seconds B)greater than or equal to 10 seconds but fewer than 11 seconds C)greater than or equal to 11 seconds but fewer than 12 seconds D)greater than or equal to 12 seconds
Use the information in Table H.1.Assuming that work element 4 receives a performance rating factor of 1.2 and is performed once per cycle,what is the normal time for this work element?

A)fewer than 10 seconds
B)greater than or equal to 10 seconds but fewer than 11 seconds
C)greater than or equal to 11 seconds but fewer than 12 seconds
D)greater than or equal to 12 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
53
Table H.2
<strong>Table H.2   Use the information in Table H.2.If the allowance for this task is 20 percent,what is the standard time for the entire task?</strong> A)fewer than 20 seconds B)greater than or equal to 20 seconds but fewer than 22 seconds C)greater than or equal to 22 seconds but fewer than 24 seconds D)greater than 24 seconds
Use the information in Table H.2.If the allowance for this task is 20 percent,what is the standard time for the entire task?

A)fewer than 20 seconds
B)greater than or equal to 20 seconds but fewer than 22 seconds
C)greater than or equal to 22 seconds but fewer than 24 seconds
D)greater than 24 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is TRUE regarding the MTM approach?

A)A performance rating factor greater than 1.0 means the worker under observation is working slowly.
B)A frequency of less than 1.0 means that the job element is not performed during every cycle.
C)A performance rating factor less than 1.0 means the worker under observation is not producing output that has high quality.
D)A negative allowance time means that the worker under observation is taking excessive breaks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
55
A worker was observed for four cycles of a repetitive task.The observer used the continuous method for recording the times.The continuous times (in seconds)for each element are: <strong>A worker was observed for four cycles of a repetitive task.The observer used the continuous method for recording the times.The continuous times (in seconds)for each element are:   Which one of the following are the select times (   )for each element? The first number is the select time for the first element,the second number is the select time for the second element,and so on.</strong> A)19.5,23,25,30 B)1.5,3.5,5,2 C)2,3,2,5 D)1.5,3.5,2,5 Which one of the following are the "select times" ( <strong>A worker was observed for four cycles of a repetitive task.The observer used the continuous method for recording the times.The continuous times (in seconds)for each element are:   Which one of the following are the select times (   )for each element? The first number is the select time for the first element,the second number is the select time for the second element,and so on.</strong> A)19.5,23,25,30 B)1.5,3.5,5,2 C)2,3,2,5 D)1.5,3.5,2,5 )for each element? The first number is the select time for the first element,the second number is the select time for the second element,and so on.

A)19.5,23,25,30
B)1.5,3.5,5,2
C)2,3,2,5
D)1.5,3.5,2,5
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
56
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.What is the select time for work element 3?</strong> A)fewer than 12 seconds B)greater than or equal to 12 seconds but fewer than 13 seconds C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds D)greater than or equal to 14 seconds
Use the information in Table H.1.What is the select time for work element 3?

A)fewer than 12 seconds
B)greater than or equal to 12 seconds but fewer than 13 seconds
C)greater than or equal to 13 seconds but fewer than or equal to 14 seconds
D)greater than or equal to 14 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
57
An industrial engineer is conducting a time study for a work element.The select time is 4.5 minutes,and the sample standard deviation of the observed time is 20 seconds.What is the appropriate sample size if the estimate is to be 5 percent of the true average time 95 percent of the time?

A)fewer than or equal to seven
B)greater than seven but fewer than or equal to eight
C)greater than eight but fewer than or equal to nine
D)greater than nine
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
58
With the use of the elemental standard data approach:

A)there is no need to estimate allowances.
B)managers can develop standards for new work before production begins.
C)time studies are not needed.
D)the need to specify job variables that affect times for each work element is eliminated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
59
Table H.2
<strong>Table H.2   Use the information in Table H.2.Which work element will take the longest for an average worker to perform per cycle?</strong> A)work element 1 B)work element 2 C)work element 3 D)work element 4
Use the information in Table H.2.Which work element will take the longest for an average worker to perform per cycle?

A)work element 1
B)work element 2
C)work element 3
D)work element 4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
60
Table H.1
A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.
<strong>Table H.1 A worker was observed for four cycles in a repetitive task that contains four distinct elements.The observer recorded the following items in seconds,using the continuous method.   Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.2 and all other elements receive a rating of 1.1.If work element 2 is performed every other cycle but every other element is performed every cycle,and the company has an allowance time of 0.10,what is the standard time for the complete cycle?</strong> A)fewer than 45 seconds B)greater than or equal to 45 seconds but fewer than 50 seconds C)greater than or equal to 50 seconds but fewer than 55 seconds D)greater than or equal to 55 seconds
Use the information in Table H.1.Assume that work element 1 receives a performance rating factor of 1.2 and all other elements receive a rating of 1.1.If work element 2 is performed every other cycle but every other element is performed every cycle,and the company has an allowance time of 0.10,what is the standard time for the complete cycle?

A)fewer than 45 seconds
B)greater than or equal to 45 seconds but fewer than 50 seconds
C)greater than or equal to 50 seconds but fewer than 55 seconds
D)greater than or equal to 55 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
61
A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis. <strong>A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis.   If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many MORE observations are needed?</strong> A)fewer than or equal to 700 B)greater than 700 but fewer than or equal to 800 C)greater than 800 but fewer than or equal to 900 D)greater than 900 If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many MORE observations are needed?

A)fewer than or equal to 700
B)greater than 700 but fewer than or equal to 800
C)greater than 800 but fewer than or equal to 900
D)greater than 900
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
62
A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis. <strong>A work sampling method is used to determine the proportion of the time a worker is idle.The following information was gathered on a random basis.   If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many more observations are needed?</strong> A)fewer than or equal to 600 B)greater than 600 but fewer than or equal to 800 C)greater than 800 but fewer than or equal to 1,000 D)greater than 1,000 If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.03,how many more observations are needed?

A)fewer than or equal to 600
B)greater than 600 but fewer than or equal to 800
C)greater than 800 but fewer than or equal to 1,000
D)greater than 1,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
63
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the normal time for the complete cycle?</strong> A)fewer than 85 seconds B)greater than or equal to 85 seconds but fewer than 95 seconds C)greater than or equal to 95 seconds but fewer than 105 seconds D)greater than or equal to 105 seconds
Use the information in Table H.3.What is the normal time for the complete cycle?

A)fewer than 85 seconds
B)greater than or equal to 85 seconds but fewer than 95 seconds
C)greater than or equal to 95 seconds but fewer than 105 seconds
D)greater than or equal to 105 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
64
A worker was observed for four cycles of a repetitive operation.The observed times for work elements are 11,10,8,and 11 seconds,respectively.What sample size is appropriate for estimating the time for this work element within + 3 percent of the true mean time with 95 percent confidence (z = 1.96)?

A)fewer than or equal to 70
B)greater than 70 but fewer than or equal to 75
C)greater than 75 but fewer than or equal to 80
D)greater than 80
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
65
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the normal time for work element 2?</strong> A)fewer than 10 seconds B)greater than or equal to 10 seconds but fewer than 11 seconds C)greater than or equal to 11 seconds but fewer than 12 seconds D)greater than or equal to 12 seconds
Use the information in Table H.3.What is the normal time for work element 2?

A)fewer than 10 seconds
B)greater than or equal to 10 seconds but fewer than 11 seconds
C)greater than or equal to 11 seconds but fewer than 12 seconds
D)greater than or equal to 12 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
66
A time study analyst has found the select time for a work element to be 14.0 minutes,with a sample standard deviation of 3.2 minutes.What is the minimum sample size needed if the estimate is to be within 4 percent of the average 95 percent of the time (z = 1.96)?

A)fewer than 100
B)greater than or equal to 100 but fewer than 140
C)greater than or equal to 140 but fewer than 180
D)greater than or equal to 180
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
67
A manager wants to determine the proportion of time a cashier is idle.A work sampling method was used,and the idle time was found to be 20 percent based on 100 observations.If the manager wants a + 0.05 with a 95 percent confidence level (z = 1.96),how many MORE observations are needed?

A)fewer than or equal to 200
B)greater than 200 but fewer than or equal to 300
C)greater than 300 but fewer than or equal to 400
D)greater than 400
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
68
The process of creating labor standards based on the judgment of skilled observers is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
69
The following times in seconds were observed for a particular one-element job using the continuous method: 12,22,35,and 50.The worker's rating factor is 1.1.What is the standard time for the job if an allowance of 20 percent is provided?

A)fewer than or equal to 14 seconds
B)greater than 14 but fewer than or equal to 15 seconds
C)greater than 15 but fewer than or equal to 16 seconds
D)greater than 16
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
70
A time study analysis was performed on a task with two work elements.The select times for these work elements are 21.0 seconds and 13.0 seconds,with rating factors of 1.1 and 1.2,respectively.Each work element is performed twice per cycle.If an allowance of 20 percent is used,what is the standard time for this task?

A)fewer than 50 seconds
B)greater than or equal to 50 seconds but fewer than 70 seconds
C)greater than or equal to 70 seconds but fewer than 90 seconds
D)greater than or equal to 90 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
71
A(n)________ is the time required for a trained worker to perform a task following a prescribed method with normal effort and skill.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
72
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the standard time for work element 1?</strong> A)fewer than 18 seconds B)greater than or equal to 18 seconds but fewer than 20 seconds C)greater than or equal to 20 seconds but fewer than 22 seconds D)greater than or equal to 22 seconds
Use the information in Table H.3.What is the standard time for work element 1?

A)fewer than 18 seconds
B)greater than or equal to 18 seconds but fewer than 20 seconds
C)greater than or equal to 20 seconds but fewer than 22 seconds
D)greater than or equal to 22 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
73
A job shop manager wants to determine the proportion of time the workers are idle.The shop employs two types of workers.Type 1 includes three workers and Type 2 includes two workers.The manager suspects that the proportion of idle time is about 20 percent for Type 1 workers and 15 percent for Type 2 workers.If the manager wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.05,how many trips will the observers have to take through the group?

A)fewer than or equal to 80
B)greater than 80 but fewer than or equal to 90
C)greater than 90 but fewer than or equal to 100
D)greater than 100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
74
If a worker spends 10 hours per day performing a task,and the allowance for this task is 19 percent,how many hours during the average day is the worker involved in nonproductive activities?

A)fewer than 1.75
B)greater than or equal to 1.75 hours but fewer than 5 hours
C)greater than or equal to 5.00 hours but fewer than 8.25
D)greater than or equal to 8.25 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
75
An observer has recorded the following select ( <strong>An observer has recorded the following select (   )for a five-part task and has applied a rating factor (RF)to each.The times are in seconds.If there is a 15 percent allowance for nonproductive activities,compute the standard time for the total task.   The standard time for the task is:</strong> A)fewer than or equal to 21 seconds. B)greater than 21 seconds but fewer than or equal to 23 seconds. C)greater than 23 seconds but fewer than or equal to 25 seconds. D)greater than 25 seconds. )for a five-part task and has applied a rating factor (RF)to each.The times are in seconds.If there is a 15 percent allowance for "nonproductive" activities,compute the standard time for the total task. <strong>An observer has recorded the following select (   )for a five-part task and has applied a rating factor (RF)to each.The times are in seconds.If there is a 15 percent allowance for nonproductive activities,compute the standard time for the total task.   The standard time for the task is:</strong> A)fewer than or equal to 21 seconds. B)greater than 21 seconds but fewer than or equal to 23 seconds. C)greater than 23 seconds but fewer than or equal to 25 seconds. D)greater than 25 seconds. The standard time for the task is:

A)fewer than or equal to 21 seconds.
B)greater than 21 seconds but fewer than or equal to 23 seconds.
C)greater than 23 seconds but fewer than or equal to 25 seconds.
D)greater than 25 seconds.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
76
At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF)for each element. <strong>At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF)for each element.   The standard time for this job,assuming that the allowance is 18 percent,is:</strong> A)fewer than or equal to 1.9 minutes. B)greater than 1.9 minutes but fewer than or equal to 2.0 minutes. C)greater than 2.0 minutes but fewer than or equal to 2.1 minutes. D)greater than 2.1 minutes. The standard time for this job,assuming that the allowance is 18 percent,is:

A)fewer than or equal to 1.9 minutes.
B)greater than 1.9 minutes but fewer than or equal to 2.0 minutes.
C)greater than 2.0 minutes but fewer than or equal to 2.1 minutes.
D)greater than 2.1 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
77
A supermarket administrator suspects that idle time is about 20 percent for the cashier and 15 percent for the office clerk.If the administrator wants a 95 percent confidence level (z = 1.96)and a degree of precision of + 0.05 for both cashier and office clerk,how many TOTAL observations are needed?

A)fewer than or equal to 200
B)greater than 200 but fewer than or equal to 300
C)greater than 300 but fewer than or equal to 400
D)greater than 400
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
78
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the select time for work element 2?</strong> A)fewer than 17 seconds B)greater than or equal to 17 seconds but fewer than 22 seconds C)greater than or equal to 22 seconds but fewer than or equal to 27 seconds D)greater than or equal to 27 seconds
Use the information in Table H.3.What is the select time for work element 2?

A)fewer than 17 seconds
B)greater than or equal to 17 seconds but fewer than 22 seconds
C)greater than or equal to 22 seconds but fewer than or equal to 27 seconds
D)greater than or equal to 27 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
79
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the select time for work element 4?</strong> A)fewer than 40 seconds B)greater than or equal to 40 seconds but fewer than 60 seconds C)greater than or equal to 60 seconds but fewer than or equal to 80 seconds D)greater than or equal to 80 seconds
Use the information in Table H.3.What is the select time for work element 4?

A)fewer than 40 seconds
B)greater than or equal to 40 seconds but fewer than 60 seconds
C)greater than or equal to 60 seconds but fewer than or equal to 80 seconds
D)greater than or equal to 80 seconds
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
80
Table H.3
A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.
<strong>Table H.3 A worker was observed for four cycles in a repetitive task.The observer recorded the following times,in seconds,using the continuous method.The ratings for each element and frequency it is performed are also indicated in the table.The allowance fraction is 20 percent.   Use the information in Table H.3.What is the standard time for the complete cycle?</strong> A)fewer than 90 seconds B)greater than or equal to 90 seconds but fewer than 97 seconds C)greater than or equal to 97 seconds but fewer than 104 seconds D)greater than or equal to 104 seconds
Use the information in Table H.3.What is the standard time for the complete cycle?

A)fewer than 90 seconds
B)greater than or equal to 90 seconds but fewer than 97 seconds
C)greater than or equal to 97 seconds but fewer than 104 seconds
D)greater than or equal to 104 seconds