Deck 8: Lean Systems

ملء الشاشة (f)
exit full mode
سؤال
Push systems are often used in firms with highly repetitive processes and well defined work flows of standardized items.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The just-in-time (JIT)philosophy is the belief that cutting inventory and removing non-value-added activities in operations can eliminate waste.
سؤال
Kaizen is the Japanese term for continuous improvement.
سؤال
In manufacturing systems,one way to achieve continuous improvement can be to maintain low inventories,and periodically cut safety stocks almost to zero.
سؤال
The goal of single-digit setup is to have a setup completed in fewer than 10 hours.
سؤال
In service systems,a common approach used to stress the system and identify problems is to reduce the number of employees doing an activity until the process begins to slow or come to a halt.
سؤال
In a lean system,wait times can be caused to some extent by long production runs.
سؤال
In lean systems,work-in-process inventory is a direct result of overproduction and waiting.
سؤال
In a lean system,large inventories are not considered a type of waste,because they prevent operator wait times.
سؤال
Long production runs,poor material flows,and processes that are not tightly linked to one another can cause over 90% of a product's lead time to be spent waiting.
سؤال
Using expensive,high precision equipment,even when simpler machines would suffice,is encouraged when lean systems are implemented,because this is the only way high quality manufacturing can be achieved.
سؤال
In lean systems,the need for single-digit setups is driven by the desire for small lot sizes.
سؤال
If infrequent,large shipments of purchased items are arranged with suppliers,large inventory savings for these items can be realized.
سؤال
JIT II refers to a form of supplier partnership that places a supplier representative,who is empowered to plan and schedule the replenishment of materials from the supplier,in the customer's plant on a full-time basis.
سؤال
Manufacturing an item before it is needed in a lean system is not considered waste,because it helps keep material flowing through the system.
سؤال
While overproduction creates an item before it is needed,the extra time before an item is needed makes it easier to detect defects and reduce their impact on a process.
سؤال
Just-in-time (JIT)systems need close relationships with suppliers.
سؤال
The push method begins the production of items in advance of customer needs.
سؤال
The pull method begins the production of an item in advance of customer needs.
سؤال
In a lean system,excess inventory hides problems on the shop floor,and thus prevents sources of waste from being identified and eliminated.
سؤال
A firm that averages sales of 320 units for every 480-minute shift it runs has a takt time of 90 seconds.
سؤال
Firms that have highly repetitive processes and well-defined work flows of standardized items often use the pull method.
سؤال
Heijunka is the leveling of production load by both volume and product mix.
سؤال
Preventive maintenance is typically given very low priority in just-in-time systems.
سؤال
Five S practices can enable workers to visually see everything differently,prioritize tasks,and achieve a greater degree of focus.
سؤال
Quality at the source is a philosophy whereby defects are caught and corrected where they are created.
سؤال
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called jidoka.
سؤال
Just-in-time (JIT)systems rely on inspectors to inspect quality into the product.
سؤال
Mixed-model assembly is a type of assembly that produces a mix of models in smaller lots.
سؤال
One tactic of Total Preventive Maintenance (TPM)is to make workers responsible for routine minor maintenance of their own equipment.
سؤال
Productivity tends to increase when components are standardized because each worker performs a standardized task or work method more often each day.
سؤال
Takt time is the cycle time needed to maximize utilization of an organization's workers and equipment.
سؤال
A power cord that can be plugged in only one way is an example of a poka-yoke.
سؤال
The Japanese practice of andon means that production does not begin until a card or bin is empty.
سؤال
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called heijunka.
سؤال
Lean systems are operating systems that maximize the value added of each of its activities by paring unnecessary resources and delays from them.
سؤال
A five S program includes the activities of "simplify" and "system."
سؤال
A firm that averages sales of 320 units for every 480-minute shift it runs has a takt time of 40 seconds.
سؤال
Takt time is the cycle time needed to match the rate of production to the rate of sales.
سؤال
Five S practices can be applied to both manufacturing and service settings and can include offices,work spaces,tool rooms,and shop floors.
سؤال
A value stream map shows the flows of materials and information and the lines of responsibility and authority.
سؤال
The theory of constraints accepts existing system bottlenecks and works to maximize throughput given these constraints,while value stream mapping endeavors to understand how existing processes can be altered to eliminate bottlenecks and other wasteful activities.
سؤال
While lean systems work very well for manufacturing systems,they cannot be applied to service systems.
سؤال
A one-person cell in which a worker operates several different machines simultaneously to achieve a line flow is called a one-worker,multiple-machines (OWMM)cell.
سؤال
One benefit of a lean system is that it reduces space requirements.
سؤال
Use of value stream mapping requires construction of a current state drawing,a future state drawing,and an implementation plan.
سؤال
Group technology collects similar parts into families and organizes machine tools into separate cells.
سؤال
A Kanban is a card used to control the flow of production in many just-in-time systems.
سؤال
The value stream mapping tool often requires completion of the future state drawing before the current state drawing,to help managers see the future state goals and more easily identify problems with the current state of the process.
سؤال
Toyota sets up all of its operations as experiments and teaches employees at all levels how to use the trial and error method of problem solving.
سؤال
Options for achieving line-flow layouts in a lean system include assigning one worker to operate several different machines in a line and creating cells to produce similar product groups called families.
سؤال
Often in value stream mapping,analysts must rely on process information from shop floor workers rather than direct observation in an effort to quickly develop a work plan and accelerate implementing the improved process.
سؤال
An OWMM arrangement reduces labor requirements but increases inventory.
سؤال
To complete the current state drawing of a process,a map of the current situation is developed,including such items as material and information flows,process times,setup times,batch sizes,scrap rates,and number of people required.
سؤال
After the earthquake and tsunami of 2011,Toyota's suppliers and plants were able to maintain production levels due to their efficiency.
سؤال
The Toyota Production System requires that any process improvements are to be made at the lowest level of the organization.
سؤال
In the Toyota Production System,when a work station needs more material,it is obvious to both the worker and the supplier that material is needed.Further,the amount needed must be understood as well as the delivery time for replenishment.
سؤال
In a Kanban system,materials may be withdrawn without a withdrawal card if the operation requiring the material is about to run out of work.
سؤال
Some Kanban systems are set up without Kanban cards,and use the material containers or open spaces in a work area to withdraw materials.
سؤال
As the average processing time per container of parts increases,fewer containers are needed in a Kanban system.
سؤال
Continuous improvement with lean systems:

A)involves navigating a ship over treacherous rocks.
B)requires periodically increasing lot sizes or workforce levels to uncover problems.
C)entails systematically stressing the system and focusing on problem areas.
D)focuses exclusively on internal operations without addressing relationships with customers and suppliers.
سؤال
One big advantage of lean systems is that they can usually be put in place without any major changes to existing layouts.
سؤال
Lean systems maintain inventory in small lot sizes because small lot sizes:

A)increase pipeline inventory,allowing the organization to buffer against demand uncertainties.
B)increase the quality level of the product.
C)enable schedules to use machine capacities more efficiently.
D)increase manufacturing lead time because of the increase in waiting time.
سؤال
Companies using lean systems generally have:

A)many suppliers to ensure that material shortages never occur.
B)suppliers that are located nearby to decrease delivery lead time.
C)suppliers that are willing to accept short-term contracts.
D)suppliers who are low-cost producers.
سؤال
Mistake-proofing is known by the term:

A)andon.
B)muda.
C)jidoka.
D)poka-yoke.
سؤال
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is known as:

A)andon.
B)muda.
C)jidoka.
D)poka-yoke.
سؤال
There are many requirements for the successful implementation of the lean system of production.Which one of the following is not such a requirement?

A)uniform assembly schedule
B)short setup time
C)low machine failure and low defects
D)substantial natural resources
سؤال
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,which of the following statements is TRUE?

A)Jobs with excessive motion should be redesigned.
B)Work-in-process inventory is the direct result of underutilization of employees.
C)Manufacturing an item before it is needed helps an organization detect and reduce defects.
D)Product damage and deterioration result from using expensive high precision equipment.
سؤال
What did the production manager say to the pile of scrapped material?

A)"Hello muda."
B)"Hello fadduh."
C)"We need more kanbans."
D)"JIT II Brute?"
سؤال
The lean system concept will not work without the proper environment.Which one of the following characteristics is most common to firms that have successfully implemented a lean system?

A)uniform assembly schedules
B)specialized workforce
C)high rates of machine failures
D)longer setup times
سؤال
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,excessive movement and material handling of product between processes is part of which general waste category?

A)Motion
B)Transportation
C)Inappropriate Processing
D)Underutilization of Employees
سؤال
Lean systems try to:

A)produce a product in anticipation of demand.
B)maximize the value added by of each of its activities.
C)organize production in large lots to minimize the number of setups.
D)reduce the labor content in all processes.
سؤال
Lean systems do not need stable master production schedules.
سؤال
Using customer demand to activate production of an item or service is called:

A)the andon method.
B)the pull method.
C)the jidoka method.
D)the push method.
سؤال
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,manufacturing an item before it is needed is part of which general waste category?

A)Inappropriate Processing
B)Waiting
C)Inventory
D)Overproduction
سؤال
A method in which production of an item begins in advance of customer needs is called:

A)the andon method.
B)the pull method.
C)the jidoka method.
D)the push method.
سؤال
The goal of single-digit setups is to have a setup time:

A)of less than one shift.
B)of less than one hour.
C)of less than 30 minutes.
D)of less than 10 minutes.
سؤال
The just-in-time (JIT)system is a(n):

A)management system of people and procedures to fulfill all delivery deadlines.
B)production system of small-lot manufacturing to reduce work-in-process inventory.
C)materials management system for removing all inventories.
D)integrated system of managing resources,information,and decision processes to eliminate waste.
سؤال
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,using expensive high precision equipment when a simpler machine would suffice is part of which general waste category?

A)Motion
B)Overproduction
C)Inappropriate Processing
D)Defects
سؤال
In the Toyota Production System,services and goods flow to the next available person or machine to maintain smooth,rapid flow.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/179
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Lean Systems
1
Push systems are often used in firms with highly repetitive processes and well defined work flows of standardized items.
False
2
The just-in-time (JIT)philosophy is the belief that cutting inventory and removing non-value-added activities in operations can eliminate waste.
True
3
Kaizen is the Japanese term for continuous improvement.
True
4
In manufacturing systems,one way to achieve continuous improvement can be to maintain low inventories,and periodically cut safety stocks almost to zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
5
The goal of single-digit setup is to have a setup completed in fewer than 10 hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
6
In service systems,a common approach used to stress the system and identify problems is to reduce the number of employees doing an activity until the process begins to slow or come to a halt.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
7
In a lean system,wait times can be caused to some extent by long production runs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
8
In lean systems,work-in-process inventory is a direct result of overproduction and waiting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
9
In a lean system,large inventories are not considered a type of waste,because they prevent operator wait times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
10
Long production runs,poor material flows,and processes that are not tightly linked to one another can cause over 90% of a product's lead time to be spent waiting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
11
Using expensive,high precision equipment,even when simpler machines would suffice,is encouraged when lean systems are implemented,because this is the only way high quality manufacturing can be achieved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
12
In lean systems,the need for single-digit setups is driven by the desire for small lot sizes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
13
If infrequent,large shipments of purchased items are arranged with suppliers,large inventory savings for these items can be realized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
14
JIT II refers to a form of supplier partnership that places a supplier representative,who is empowered to plan and schedule the replenishment of materials from the supplier,in the customer's plant on a full-time basis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
15
Manufacturing an item before it is needed in a lean system is not considered waste,because it helps keep material flowing through the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
16
While overproduction creates an item before it is needed,the extra time before an item is needed makes it easier to detect defects and reduce their impact on a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
17
Just-in-time (JIT)systems need close relationships with suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
18
The push method begins the production of items in advance of customer needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
19
The pull method begins the production of an item in advance of customer needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
20
In a lean system,excess inventory hides problems on the shop floor,and thus prevents sources of waste from being identified and eliminated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
21
A firm that averages sales of 320 units for every 480-minute shift it runs has a takt time of 90 seconds.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
22
Firms that have highly repetitive processes and well-defined work flows of standardized items often use the pull method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
23
Heijunka is the leveling of production load by both volume and product mix.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
24
Preventive maintenance is typically given very low priority in just-in-time systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
25
Five S practices can enable workers to visually see everything differently,prioritize tasks,and achieve a greater degree of focus.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
26
Quality at the source is a philosophy whereby defects are caught and corrected where they are created.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
27
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called jidoka.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
28
Just-in-time (JIT)systems rely on inspectors to inspect quality into the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
29
Mixed-model assembly is a type of assembly that produces a mix of models in smaller lots.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
30
One tactic of Total Preventive Maintenance (TPM)is to make workers responsible for routine minor maintenance of their own equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
31
Productivity tends to increase when components are standardized because each worker performs a standardized task or work method more often each day.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
32
Takt time is the cycle time needed to maximize utilization of an organization's workers and equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
33
A power cord that can be plugged in only one way is an example of a poka-yoke.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
34
The Japanese practice of andon means that production does not begin until a card or bin is empty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
35
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is called heijunka.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
36
Lean systems are operating systems that maximize the value added of each of its activities by paring unnecessary resources and delays from them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
37
A five S program includes the activities of "simplify" and "system."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
38
A firm that averages sales of 320 units for every 480-minute shift it runs has a takt time of 40 seconds.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
39
Takt time is the cycle time needed to match the rate of production to the rate of sales.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
40
Five S practices can be applied to both manufacturing and service settings and can include offices,work spaces,tool rooms,and shop floors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
41
A value stream map shows the flows of materials and information and the lines of responsibility and authority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
42
The theory of constraints accepts existing system bottlenecks and works to maximize throughput given these constraints,while value stream mapping endeavors to understand how existing processes can be altered to eliminate bottlenecks and other wasteful activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
43
While lean systems work very well for manufacturing systems,they cannot be applied to service systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
44
A one-person cell in which a worker operates several different machines simultaneously to achieve a line flow is called a one-worker,multiple-machines (OWMM)cell.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
45
One benefit of a lean system is that it reduces space requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
46
Use of value stream mapping requires construction of a current state drawing,a future state drawing,and an implementation plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
47
Group technology collects similar parts into families and organizes machine tools into separate cells.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
48
A Kanban is a card used to control the flow of production in many just-in-time systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
49
The value stream mapping tool often requires completion of the future state drawing before the current state drawing,to help managers see the future state goals and more easily identify problems with the current state of the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
50
Toyota sets up all of its operations as experiments and teaches employees at all levels how to use the trial and error method of problem solving.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
51
Options for achieving line-flow layouts in a lean system include assigning one worker to operate several different machines in a line and creating cells to produce similar product groups called families.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
52
Often in value stream mapping,analysts must rely on process information from shop floor workers rather than direct observation in an effort to quickly develop a work plan and accelerate implementing the improved process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
53
An OWMM arrangement reduces labor requirements but increases inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
54
To complete the current state drawing of a process,a map of the current situation is developed,including such items as material and information flows,process times,setup times,batch sizes,scrap rates,and number of people required.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
55
After the earthquake and tsunami of 2011,Toyota's suppliers and plants were able to maintain production levels due to their efficiency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
56
The Toyota Production System requires that any process improvements are to be made at the lowest level of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
57
In the Toyota Production System,when a work station needs more material,it is obvious to both the worker and the supplier that material is needed.Further,the amount needed must be understood as well as the delivery time for replenishment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
58
In a Kanban system,materials may be withdrawn without a withdrawal card if the operation requiring the material is about to run out of work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
59
Some Kanban systems are set up without Kanban cards,and use the material containers or open spaces in a work area to withdraw materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
60
As the average processing time per container of parts increases,fewer containers are needed in a Kanban system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
61
Continuous improvement with lean systems:

A)involves navigating a ship over treacherous rocks.
B)requires periodically increasing lot sizes or workforce levels to uncover problems.
C)entails systematically stressing the system and focusing on problem areas.
D)focuses exclusively on internal operations without addressing relationships with customers and suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
62
One big advantage of lean systems is that they can usually be put in place without any major changes to existing layouts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
63
Lean systems maintain inventory in small lot sizes because small lot sizes:

A)increase pipeline inventory,allowing the organization to buffer against demand uncertainties.
B)increase the quality level of the product.
C)enable schedules to use machine capacities more efficiently.
D)increase manufacturing lead time because of the increase in waiting time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
64
Companies using lean systems generally have:

A)many suppliers to ensure that material shortages never occur.
B)suppliers that are located nearby to decrease delivery lead time.
C)suppliers that are willing to accept short-term contracts.
D)suppliers who are low-cost producers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
65
Mistake-proofing is known by the term:

A)andon.
B)muda.
C)jidoka.
D)poka-yoke.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
66
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is known as:

A)andon.
B)muda.
C)jidoka.
D)poka-yoke.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
67
There are many requirements for the successful implementation of the lean system of production.Which one of the following is not such a requirement?

A)uniform assembly schedule
B)short setup time
C)low machine failure and low defects
D)substantial natural resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
68
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,which of the following statements is TRUE?

A)Jobs with excessive motion should be redesigned.
B)Work-in-process inventory is the direct result of underutilization of employees.
C)Manufacturing an item before it is needed helps an organization detect and reduce defects.
D)Product damage and deterioration result from using expensive high precision equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
69
What did the production manager say to the pile of scrapped material?

A)"Hello muda."
B)"Hello fadduh."
C)"We need more kanbans."
D)"JIT II Brute?"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
70
The lean system concept will not work without the proper environment.Which one of the following characteristics is most common to firms that have successfully implemented a lean system?

A)uniform assembly schedules
B)specialized workforce
C)high rates of machine failures
D)longer setup times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
71
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,excessive movement and material handling of product between processes is part of which general waste category?

A)Motion
B)Transportation
C)Inappropriate Processing
D)Underutilization of Employees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
72
Lean systems try to:

A)produce a product in anticipation of demand.
B)maximize the value added by of each of its activities.
C)organize production in large lots to minimize the number of setups.
D)reduce the labor content in all processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
73
Lean systems do not need stable master production schedules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
74
Using customer demand to activate production of an item or service is called:

A)the andon method.
B)the pull method.
C)the jidoka method.
D)the push method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
75
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,manufacturing an item before it is needed is part of which general waste category?

A)Inappropriate Processing
B)Waiting
C)Inventory
D)Overproduction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
76
A method in which production of an item begins in advance of customer needs is called:

A)the andon method.
B)the pull method.
C)the jidoka method.
D)the push method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
77
The goal of single-digit setups is to have a setup time:

A)of less than one shift.
B)of less than one hour.
C)of less than 30 minutes.
D)of less than 10 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
78
The just-in-time (JIT)system is a(n):

A)management system of people and procedures to fulfill all delivery deadlines.
B)production system of small-lot manufacturing to reduce work-in-process inventory.
C)materials management system for removing all inventories.
D)integrated system of managing resources,information,and decision processes to eliminate waste.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
79
Regarding the Eight Types of Waste that must be eliminated to implement lean systems,using expensive high precision equipment when a simpler machine would suffice is part of which general waste category?

A)Motion
B)Overproduction
C)Inappropriate Processing
D)Defects
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
80
In the Toyota Production System,services and goods flow to the next available person or machine to maintain smooth,rapid flow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 179 في هذه المجموعة.