Deck 10: Production and Cost Estimation

ملء الشاشة (f)
exit full mode
سؤال
estimating a short-run average variable cost function,

A)the intercept must be forced to equal zero.
B)the cost data must be inflation-adjusted.
C)at least one input must have been constant during the period in which the data were collected.
D)both b and c
E)all of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   At what level of labor usage does the maximum average product occur?</strong> A)20 B)30 C)40 D)50 E)60 <div style=padding-top: 35px> At what level of labor usage does the maximum average product occur?

A)20
B)30
C)40
D)50
E)60
سؤال
is a problem with using a production function of the form Q = aK + bL a > 0,b > 0)?

A)MRTS is constant.
B)A positive output can be produced when one input is not used.
C)The marginal products of the inputs do not have diminishing marginal returns.
D)both a and b
E)all of the above
سؤال
estimating a short-run production function of the form <strong>estimating a short-run production function of the form   ,it is necessary to specify in the computer routine that</strong> A)A < 0. B)B > 0. C)the intercept term is forced to equal zero. D)a and b E)all of the above <div style=padding-top: 35px> ,it is necessary to specify in the computer routine that

A)A < 0.
B)B > 0.
C)the intercept term is forced to equal zero.
D)a and b
E)all of the above
سؤال
A linear specification,Q = aK + bL,is not appropriate for estimating a production function because

A)the marginal products of the inputs are assumed constant.
B)it does not allow the firm to substitute capital for labor.
C)the firm could produce positive levels of output at zero cost.
D)both b and c
E)all of the above
سؤال
average variable cost function is estimated as <strong>average variable cost function is estimated as   Which of the following cost functions is associated with this estimate?</strong> A)SMC = 96 - 4Q + 0.1Q<sup>2</sup> B)TVC = 96Q - 2Q<sup>2</sup> + 0.05Q<sup>3</sup> C)TVC = 96Q + 4Q<sup>2</sup> + 0.15Q<sup>3</sup> D)SMC = 96 - 4Q + 0.15Q<sup>2</sup> E)both b and d <div style=padding-top: 35px> Which of the following cost functions is associated with this estimate?

A)SMC = 96 - 4Q + 0.1Q2
B)TVC = 96Q - 2Q2 + 0.05Q3
C)TVC = 96Q + 4Q2 + 0.15Q3
D)SMC = 96 - 4Q + 0.15Q2
E)both b and d
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 20 units of labor,what is marginal product?</strong> A)6.0 B)1.9 C)6.3 D)4.0 E)2.4 <div style=padding-top: 35px> At 20 units of labor,what is marginal product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   What is average product when it is at its maximum level?</strong> A)3.20 B)8.75 C)6.92 D)6.00 E)9.40 <div style=padding-top: 35px> What is average product when it is at its maximum level?

A)3.20
B)8.75
C)6.92
D)6.00
E)9.40
سؤال
Which of the following represents a short-run cubic production function?

A) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above <div style=padding-top: 35px>
B) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above <div style=padding-top: 35px>
C) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above <div style=padding-top: 35px>
D) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above <div style=padding-top: 35px>
E)all of the above
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 60 units of labor,what is average product?</strong> A)9.4 B)8.6 C)3.7 D)2.4 E)6.4 <div style=padding-top: 35px> At 60 units of labor,what is average product?

A)9.4
B)8.6
C)3.7
D)2.4
E)6.4
سؤال
A potential problem with cross-section cost data is that

A)nominal cost data include the effect of inflation.
B)different firms face different input prices.
C)at least one input is fixed over time.
D)both a and b
E)none of the above
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   What is total product when average product is at its maximum level?</strong> A)94 B)86 C)100 D)128 E)150 <div style=padding-top: 35px> What is total product when average product is at its maximum level?

A)94
B)86
C)100
D)128
E)150
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 20 units of labor,what is total product?</strong> A)48 B)96 C)20 D)62 E)41 <div style=padding-top: 35px> At 20 units of labor,what is total product?

A)48
B)96
C)20
D)62
E)41
سؤال
a cubic production function of the form <strong>a cubic production function of the form   ,in order for the average and marginal product functions to have their usual theoretical properties,it must be the case that</strong> A)a < 0,b > 0 B)a > 0,b < 0 C)a < 0,b < 0 D)a > 0,b > 0 <div style=padding-top: 35px> ,in order for the average and marginal product functions to have their usual theoretical properties,it must be the case that

A)a < 0,b > 0
B)a > 0,b < 0
C)a < 0,b < 0
D)a > 0,b > 0
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 20 units of labor,what is average product?</strong> A)6.0 B)1.9 C)6.3 D)4.0 E)2.4 <div style=padding-top: 35px> At 20 units of labor,what is average product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
سؤال
An estimated short-run cost function

A)can be used to make price and output decisions.
B)holds the capital stock constant.
C)can be estimated using time-series data.
D)both a and c
E)all of the above
سؤال
theoretical restriction on the short-run cubic cost equation,TVC = aQ + bQ + cQ2,is

A)a > 0,b > 0,c > 0
B)a > 0,b < 0,c > 0
C)a > 0,b > 0,c < 0
D)a > 0,b < 0,c < 0
سؤال
Which of the following is an estimable form of a production function?

A)Q = fL,K)
B)Q = fL, <strong>Which of the following is an estimable form of a production function?</strong> A)Q = fL,K) B)Q = fL,   ) C)   D)all of the above E)none of the above <div style=padding-top: 35px> )
C) <strong>Which of the following is an estimable form of a production function?</strong> A)Q = fL,K) B)Q = fL,   ) C)   D)all of the above E)none of the above <div style=padding-top: 35px>
D)all of the above
E)none of the above
سؤال
The opportunity cost of capital owned by the firm should reflect

A)acquisition cost.
B)the return foregone by using the capital rather than renting it to another firm.
C)wage rate differences.
D)both a and b
سؤال
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 60 units of labor,what is marginal product?</strong> A)4.1 B)1.2 C)6.3 D)2.4 E)-2.4 <div style=padding-top: 35px> At 60 units of labor,what is marginal product?

A)4.1
B)1.2
C)6.3
D)2.4
E)-2.4
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total variable cost TVC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total variable cost TVC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 <div style=padding-top: 35px> If Straker Industries produces 12 units of output,what is estimated total variable cost TVC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average total cost ATC)?</strong> A)$121.93 B)$171.40 C)$463.20 D)$1,348 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average total cost ATC)?</strong> A)$121.93 B)$171.40 C)$463.20 D)$1,348 <div style=padding-top: 35px> If Straker Industries produces 12 units of output,what is estimated average total cost ATC)?

A)$121.93
B)$171.40
C)$463.20
D)$1,348
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$62.60 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$62.60 <div style=padding-top: 35px> If Straker Industries produces 12 units of output,what is estimated short-run marginal cost SMC)?

A)$28.04
B)$32.40
C)$33.33
D)$62.60
سؤال
A cubic specification for a short-run production function is appropriate when the scatter diagram indicates

A)an S-shaped total product curve.
B)marginal product of labor falls throughout the range of labor usage.
C)total product is decreasing throughout the range of labor usage.
D)an S-shaped marginal product of labor curve.
E)a <strong>A cubic specification for a short-run production function is appropriate when the scatter diagram indicates</strong> A)an S-shaped total product curve. B)marginal product of labor falls throughout the range of labor usage. C)total product is decreasing throughout the range of labor usage. D)an S-shaped marginal product of labor curve. E)a   -shaped marginal product of labor curve MP first falls and then rises as labor usage increases. <div style=padding-top: 35px> -shaped marginal product of labor curve MP first falls and then rises as labor usage increases.
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px> The estimated short-run marginal cost function SMC)at Straker Industries is:

A) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
B) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
C) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
D) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 <div style=padding-top: 35px> If Straker Industries produces 20 units of output,what is estimated short-run marginal cost SMC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average total cost ATC)?</strong> A)$19.40 B)$67.40 C)$117.40 D)$1,348 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average total cost ATC)?</strong> A)$19.40 B)$67.40 C)$117.40 D)$1,348 <div style=padding-top: 35px> If Straker Industries produces 20 units of output,what is estimated average total cost ATC)?

A)$19.40
B)$67.40
C)$117.40
D)$1,348
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total cost TC)?</strong> A)$1,000 B)$1,463 C)$2,348 D)$4,428 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total cost TC)?</strong> A)$1,000 B)$1,463 C)$2,348 D)$4,428 <div style=padding-top: 35px> If Straker Industries produces 12 units of output,what is estimated total cost TC)?

A)$1,000
B)$1,463
C)$2,348
D)$4,428
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At Straker Industries,average variable cost AVC)reaches its minimum value at $________.</strong> A)$24.50 B)$33.60 C)$72.80 D)$121.80 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At Straker Industries,average variable cost AVC)reaches its minimum value at $________.</strong> A)$24.50 B)$33.60 C)$72.80 D)$121.80 <div style=padding-top: 35px> At Straker Industries,average variable cost AVC)reaches its minimum value at $________.

A)$24.50
B)$33.60
C)$72.80
D)$121.80
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average variable cost AVC)?</strong> A)$19.40 B)$67.40 C)$171.40 D)$179.40 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average variable cost AVC)?</strong> A)$19.40 B)$67.40 C)$171.40 D)$179.40 <div style=padding-top: 35px> If Straker Industries produces 20 units of output,what is estimated average variable cost AVC)?

A)$19.40
B)$67.40
C)$171.40
D)$179.40
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total cost TC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total cost TC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 <div style=padding-top: 35px> If Straker Industries produces 20 units of output,what is estimated total cost TC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
سؤال
When estimating a cubic short-run production function <strong>When estimating a cubic short-run production function   using linear regression analysis,you must</strong> A)transform the equation into linear form by defining L3 and L2 as L<sup>3</sup> and L<sup>2</sup>,respectively. B)suppress the intercept term regress through the origin). C)convert the right-hand-side variables to logarithms. D)both a and b E)both b and c <div style=padding-top: 35px> using linear regression analysis,you must

A)transform the equation into linear form by defining L3 and L2 as L3 and L2,respectively.
B)suppress the intercept term regress through the origin).
C)convert the right-hand-side variables to logarithms.
D)both a and b
E)both b and c
سؤال
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.At _______ units of labor,marginal product of labor begins to diminish.</strong> A)32.21 B)44.44 C)66.67 D)76.66 E)82.27 <div style=padding-top: 35px> Suppose the firm employs 12 units of capital.At _______ units of labor,marginal product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At what level of output is average variable cost AVC)at its minimum point for Straker Industries?</strong> A)0.14 B)4.7 C)7 D)14 E)28 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At what level of output is average variable cost AVC)at its minimum point for Straker Industries?</strong> A)0.14 B)4.7 C)7 D)14 E)28 <div style=padding-top: 35px> At what level of output is average variable cost AVC)at its minimum point for Straker Industries?

A)0.14
B)4.7
C)7
D)14
E)28
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average variable cost AVC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$38.60 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average variable cost AVC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$38.60 <div style=padding-top: 35px> If Straker Industries produces 12 units of output,what is estimated average variable cost AVC)?

A)$28.04
B)$32.40
C)$33.33
D)$38.60
سؤال
For the short-run cost function AVC = a + bQ + cQ2,

A)the AVC curve is <strong>For the short-run cost function AVC = a + bQ + cQ<sup>2</sup>,</strong> A)the AVC curve is   -shaped when a < 0,b > 0,and c < 0. B)the AVC curve is   -shaped when a > 0,b < 0,and c > 0. C)the corresponding SMC function is   . D)both a and c E)all of the above <div style=padding-top: 35px> -shaped when a < 0,b > 0,and c < 0.
B)the AVC curve is <strong>For the short-run cost function AVC = a + bQ + cQ<sup>2</sup>,</strong> A)the AVC curve is   -shaped when a < 0,b > 0,and c < 0. B)the AVC curve is   -shaped when a > 0,b < 0,and c > 0. C)the corresponding SMC function is   . D)both a and c E)all of the above <div style=padding-top: 35px> -shaped when a > 0,b < 0,and c > 0.
C)the corresponding SMC function is <strong>For the short-run cost function AVC = a + bQ + cQ<sup>2</sup>,</strong> A)the AVC curve is   -shaped when a < 0,b > 0,and c < 0. B)the AVC curve is   -shaped when a > 0,b < 0,and c > 0. C)the corresponding SMC function is   . D)both a and c E)all of the above <div style=padding-top: 35px> .
D)both a and c
E)all of the above
سؤال
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.The product curves)in the short-run are</strong> A)TP = -12.96 L<sup>3</sup> + 1,728L<sup>2</sup>. B)AP = -12.96 L<sup>3</sup> + 1,728L<sup>2</sup>. C)MP = -38.88 L<sup>2</sup> + 3,456L. D)both a and b E)both a and c <div style=padding-top: 35px> Suppose the firm employs 12 units of capital.The product curves)in the short-run are

A)TP = -12.96 L3 + 1,728L2.
B)AP = -12.96 L3 + 1,728L2.
C)MP = -38.88 L2 + 3,456L.
D)both a and b
E)both a and c
سؤال
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total variable cost TVC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 <div style=padding-top: 35px> and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total variable cost TVC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 <div style=padding-top: 35px> If Straker Industries produces 20 units of output,what is estimated total variable cost TVC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
سؤال
The empirical specification <strong>The empirical specification   can be used to estimate</strong> A)a short-run cubic production function. B)short-run cubic cost function. C)a family of U-shaped product curves. D)both a and c E)none of the above <div style=padding-top: 35px> can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a family of U-shaped product curves.
D)both a and c
E)none of the above
سؤال
The empirical specification <strong>The empirical specification   can be used to estimate</strong> A)a short-run cubic production function. B)short-run cubic cost function. C)a   -shaped TVC curve. D)both b and c E)none of the above <div style=padding-top: 35px> can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a <strong>The empirical specification   can be used to estimate</strong> A)a short-run cubic production function. B)short-run cubic cost function. C)a   -shaped TVC curve. D)both b and c E)none of the above <div style=padding-top: 35px> -shaped TVC curve.
D)both b and c
E)none of the above
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,average variable cost AVC)is</strong> A)rising B)falling C)greater than short-run marginal cost D)less than short-run marginal cost E)both b and c <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,average variable cost AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both b and c
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is short-run marginal cost SMC)?</strong> A)$20 B)$42 C)$72 D)$90 E)$100 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is short-run marginal cost SMC)?

A)$20
B)$42
C)$72
D)$90
E)$100
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.What is total variable cost TVC)at Greene Enterprises when average variable cost AVC)is at its minimum?</strong> A)$48,000 B)$101,101 C)$137,222 D)$190,476 E)$437,212 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.What is total variable cost TVC)at Greene Enterprises when average variable cost AVC)is at its minimum?

A)$48,000
B)$101,101
C)$137,222
D)$190,476
E)$437,212
سؤال
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.Marginal product when 10 units of labor are employed is</strong> A)12,248 B)13,142 C)14,287 D)15,984 E)30,672 <div style=padding-top: 35px> Suppose the firm employs 12 units of capital.Marginal product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.At what level of output does average variable cost AVC)reach its minimum value for Greene Enterprises?</strong> A)800 B)3,144 C)3,800 D)4,333 E)51,672 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.At what level of output does average variable cost AVC)reach its minimum value for Greene Enterprises?

A)800
B)3,144
C)3,800
D)4,333
E)51,672
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 6,000 units,average variable cost AVC)is</strong> A)rising B)falling C)greater than short-run marginal cost D)less than short-run marginal cost E)both a and d <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 6,000 units,average variable cost AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both a and d
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is average variable cost AVC)?</strong> A)$20 B)$48 C)$62 D)$72 E)$85 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is average variable cost AVC)?

A)$20
B)$48
C)$62
D)$72
E)$85
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated average total cost ATC)?</strong> A)$40 B)$75.25 C)$80 D)$90 E)$168.42 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated average total cost ATC)?

A)$40
B)$75.25
C)$80
D)$90
E)$168.42
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.At Greene Enterprises,average variable cost AVC)reaches its minimum value at $________.</strong> A)$28.00 B)$31.67 C)$39.64 D)$43.33 E)$82.00 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.At Greene Enterprises,average variable cost AVC)reaches its minimum value at $________.

A)$28.00
B)$31.67
C)$39.64
D)$43.33
E)$82.00
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is total cost TC)?</strong> A)$144,000 B)$396,000 C)$444,000 D)$642,000 E)$846,000 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is total cost TC)?

A)$144,000
B)$396,000
C)$444,000
D)$642,000
E)$846,000
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$45.60 B)$62.40 C)$83 D)$92 E)$100 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated short-run marginal cost SMC)?

A)$45.60
B)$62.40
C)$83
D)$92
E)$100
سؤال
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene Enterprises produces 6,000 units,average variable cost AVC)is $_________.</strong> A)$40 B)$49.62 C)$55 D)$60 E)$72.46 <div style=padding-top: 35px> Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene Enterprises produces 6,000 units,average variable cost AVC)is $_________.

A)$40
B)$49.62
C)$55
D)$60
E)$72.46
سؤال
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.Average product when 10 units of labor are employed is</strong> A)12,248 B)13,142 C)14,287 D)15,984 E)30,672 <div style=padding-top: 35px> Suppose the firm employs 12 units of capital.Average product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
سؤال
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.At ________ units of labor,average product of labor begins to diminish.</strong> A)32.21 B)44.44 C)66.67 D)76.66 E)82.27 <div style=padding-top: 35px> Suppose the firm employs 12 units of capital.At ________ units of labor,average product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
سؤال
A short-run marginal cost function is estimated as <strong>A short-run marginal cost function is estimated as   .Which of the following cost functions is associated with this estimated SMC equation?</strong> A)TVC = 96Q - 2Q<sup>2</sup> + 0.05Q<sup>3</sup> B)SMC = 96 - 4Q + 0.1Q<sup>2</sup> C)TVC = 96Q + 4Q<sup>2</sup> + 0.15Q<sup>3</sup> D)AVC = 96 - 2Q + 0.05Q<sup>2</sup> E)a and d <div style=padding-top: 35px> .Which of the following cost functions is associated with this estimated SMC equation?

A)TVC = 96Q - 2Q2 + 0.05Q3
B)SMC = 96 - 4Q + 0.1Q2
C)TVC = 96Q + 4Q2 + 0.15Q3
D)AVC = 96 - 2Q + 0.05Q2
E)a and d
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Production and Cost Estimation
1
estimating a short-run average variable cost function,

A)the intercept must be forced to equal zero.
B)the cost data must be inflation-adjusted.
C)at least one input must have been constant during the period in which the data were collected.
D)both b and c
E)all of the above
D
2
A short-run production function was estimated as <strong>A short-run production function was estimated as   At what level of labor usage does the maximum average product occur?</strong> A)20 B)30 C)40 D)50 E)60 At what level of labor usage does the maximum average product occur?

A)20
B)30
C)40
D)50
E)60
C
3
is a problem with using a production function of the form Q = aK + bL a > 0,b > 0)?

A)MRTS is constant.
B)A positive output can be produced when one input is not used.
C)The marginal products of the inputs do not have diminishing marginal returns.
D)both a and b
E)all of the above
E
4
estimating a short-run production function of the form <strong>estimating a short-run production function of the form   ,it is necessary to specify in the computer routine that</strong> A)A < 0. B)B > 0. C)the intercept term is forced to equal zero. D)a and b E)all of the above ,it is necessary to specify in the computer routine that

A)A < 0.
B)B > 0.
C)the intercept term is forced to equal zero.
D)a and b
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
A linear specification,Q = aK + bL,is not appropriate for estimating a production function because

A)the marginal products of the inputs are assumed constant.
B)it does not allow the firm to substitute capital for labor.
C)the firm could produce positive levels of output at zero cost.
D)both b and c
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
average variable cost function is estimated as <strong>average variable cost function is estimated as   Which of the following cost functions is associated with this estimate?</strong> A)SMC = 96 - 4Q + 0.1Q<sup>2</sup> B)TVC = 96Q - 2Q<sup>2</sup> + 0.05Q<sup>3</sup> C)TVC = 96Q + 4Q<sup>2</sup> + 0.15Q<sup>3</sup> D)SMC = 96 - 4Q + 0.15Q<sup>2</sup> E)both b and d Which of the following cost functions is associated with this estimate?

A)SMC = 96 - 4Q + 0.1Q2
B)TVC = 96Q - 2Q2 + 0.05Q3
C)TVC = 96Q + 4Q2 + 0.15Q3
D)SMC = 96 - 4Q + 0.15Q2
E)both b and d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 20 units of labor,what is marginal product?</strong> A)6.0 B)1.9 C)6.3 D)4.0 E)2.4 At 20 units of labor,what is marginal product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
A short-run production function was estimated as <strong>A short-run production function was estimated as   What is average product when it is at its maximum level?</strong> A)3.20 B)8.75 C)6.92 D)6.00 E)9.40 What is average product when it is at its maximum level?

A)3.20
B)8.75
C)6.92
D)6.00
E)9.40
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following represents a short-run cubic production function?

A) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above
B) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above
C) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above
D) <strong>Which of the following represents a short-run cubic production function?</strong> A)   B)   C)   D)   E)all of the above
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 60 units of labor,what is average product?</strong> A)9.4 B)8.6 C)3.7 D)2.4 E)6.4 At 60 units of labor,what is average product?

A)9.4
B)8.6
C)3.7
D)2.4
E)6.4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
A potential problem with cross-section cost data is that

A)nominal cost data include the effect of inflation.
B)different firms face different input prices.
C)at least one input is fixed over time.
D)both a and b
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
A short-run production function was estimated as <strong>A short-run production function was estimated as   What is total product when average product is at its maximum level?</strong> A)94 B)86 C)100 D)128 E)150 What is total product when average product is at its maximum level?

A)94
B)86
C)100
D)128
E)150
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 20 units of labor,what is total product?</strong> A)48 B)96 C)20 D)62 E)41 At 20 units of labor,what is total product?

A)48
B)96
C)20
D)62
E)41
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
a cubic production function of the form <strong>a cubic production function of the form   ,in order for the average and marginal product functions to have their usual theoretical properties,it must be the case that</strong> A)a < 0,b > 0 B)a > 0,b < 0 C)a < 0,b < 0 D)a > 0,b > 0 ,in order for the average and marginal product functions to have their usual theoretical properties,it must be the case that

A)a < 0,b > 0
B)a > 0,b < 0
C)a < 0,b < 0
D)a > 0,b > 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 20 units of labor,what is average product?</strong> A)6.0 B)1.9 C)6.3 D)4.0 E)2.4 At 20 units of labor,what is average product?

A)6.0
B)1.9
C)6.3
D)4.0
E)2.4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
An estimated short-run cost function

A)can be used to make price and output decisions.
B)holds the capital stock constant.
C)can be estimated using time-series data.
D)both a and c
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
theoretical restriction on the short-run cubic cost equation,TVC = aQ + bQ + cQ2,is

A)a > 0,b > 0,c > 0
B)a > 0,b < 0,c > 0
C)a > 0,b > 0,c < 0
D)a > 0,b < 0,c < 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following is an estimable form of a production function?

A)Q = fL,K)
B)Q = fL, <strong>Which of the following is an estimable form of a production function?</strong> A)Q = fL,K) B)Q = fL,   ) C)   D)all of the above E)none of the above )
C) <strong>Which of the following is an estimable form of a production function?</strong> A)Q = fL,K) B)Q = fL,   ) C)   D)all of the above E)none of the above
D)all of the above
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
The opportunity cost of capital owned by the firm should reflect

A)acquisition cost.
B)the return foregone by using the capital rather than renting it to another firm.
C)wage rate differences.
D)both a and b
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
A short-run production function was estimated as <strong>A short-run production function was estimated as   At 60 units of labor,what is marginal product?</strong> A)4.1 B)1.2 C)6.3 D)2.4 E)-2.4 At 60 units of labor,what is marginal product?

A)4.1
B)1.2
C)6.3
D)2.4
E)-2.4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total variable cost TVC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total variable cost TVC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 If Straker Industries produces 12 units of output,what is estimated total variable cost TVC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average total cost ATC)?</strong> A)$121.93 B)$171.40 C)$463.20 D)$1,348 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average total cost ATC)?</strong> A)$121.93 B)$171.40 C)$463.20 D)$1,348 If Straker Industries produces 12 units of output,what is estimated average total cost ATC)?

A)$121.93
B)$171.40
C)$463.20
D)$1,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$62.60 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$62.60 If Straker Industries produces 12 units of output,what is estimated short-run marginal cost SMC)?

A)$28.04
B)$32.40
C)$33.33
D)$62.60
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
A cubic specification for a short-run production function is appropriate when the scatter diagram indicates

A)an S-shaped total product curve.
B)marginal product of labor falls throughout the range of labor usage.
C)total product is decreasing throughout the range of labor usage.
D)an S-shaped marginal product of labor curve.
E)a <strong>A cubic specification for a short-run production function is appropriate when the scatter diagram indicates</strong> A)an S-shaped total product curve. B)marginal product of labor falls throughout the range of labor usage. C)total product is decreasing throughout the range of labor usage. D)an S-shaped marginal product of labor curve. E)a   -shaped marginal product of labor curve MP first falls and then rises as labor usage increases. -shaped marginal product of labor curve MP first falls and then rises as labor usage increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)   The estimated short-run marginal cost function SMC)at Straker Industries is:

A) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)
B) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)
C) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)
D) <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   The estimated short-run marginal cost function SMC)at Straker Industries is:</strong> A)   B)   C)   D)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$171.40 B)$463.20 C)$1,348 D)$2,348 If Straker Industries produces 20 units of output,what is estimated short-run marginal cost SMC)?

A)$171.40
B)$463.20
C)$1,348
D)$2,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average total cost ATC)?</strong> A)$19.40 B)$67.40 C)$117.40 D)$1,348 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average total cost ATC)?</strong> A)$19.40 B)$67.40 C)$117.40 D)$1,348 If Straker Industries produces 20 units of output,what is estimated average total cost ATC)?

A)$19.40
B)$67.40
C)$117.40
D)$1,348
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total cost TC)?</strong> A)$1,000 B)$1,463 C)$2,348 D)$4,428 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated total cost TC)?</strong> A)$1,000 B)$1,463 C)$2,348 D)$4,428 If Straker Industries produces 12 units of output,what is estimated total cost TC)?

A)$1,000
B)$1,463
C)$2,348
D)$4,428
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At Straker Industries,average variable cost AVC)reaches its minimum value at $________.</strong> A)$24.50 B)$33.60 C)$72.80 D)$121.80 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At Straker Industries,average variable cost AVC)reaches its minimum value at $________.</strong> A)$24.50 B)$33.60 C)$72.80 D)$121.80 At Straker Industries,average variable cost AVC)reaches its minimum value at $________.

A)$24.50
B)$33.60
C)$72.80
D)$121.80
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average variable cost AVC)?</strong> A)$19.40 B)$67.40 C)$171.40 D)$179.40 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated average variable cost AVC)?</strong> A)$19.40 B)$67.40 C)$171.40 D)$179.40 If Straker Industries produces 20 units of output,what is estimated average variable cost AVC)?

A)$19.40
B)$67.40
C)$171.40
D)$179.40
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total cost TC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total cost TC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 If Straker Industries produces 20 units of output,what is estimated total cost TC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
When estimating a cubic short-run production function <strong>When estimating a cubic short-run production function   using linear regression analysis,you must</strong> A)transform the equation into linear form by defining L3 and L2 as L<sup>3</sup> and L<sup>2</sup>,respectively. B)suppress the intercept term regress through the origin). C)convert the right-hand-side variables to logarithms. D)both a and b E)both b and c using linear regression analysis,you must

A)transform the equation into linear form by defining L3 and L2 as L3 and L2,respectively.
B)suppress the intercept term regress through the origin).
C)convert the right-hand-side variables to logarithms.
D)both a and b
E)both b and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.At _______ units of labor,marginal product of labor begins to diminish.</strong> A)32.21 B)44.44 C)66.67 D)76.66 E)82.27 Suppose the firm employs 12 units of capital.At _______ units of labor,marginal product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At what level of output is average variable cost AVC)at its minimum point for Straker Industries?</strong> A)0.14 B)4.7 C)7 D)14 E)28 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   At what level of output is average variable cost AVC)at its minimum point for Straker Industries?</strong> A)0.14 B)4.7 C)7 D)14 E)28 At what level of output is average variable cost AVC)at its minimum point for Straker Industries?

A)0.14
B)4.7
C)7
D)14
E)28
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average variable cost AVC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$38.60 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 12 units of output,what is estimated average variable cost AVC)?</strong> A)$28.04 B)$32.40 C)$33.33 D)$38.60 If Straker Industries produces 12 units of output,what is estimated average variable cost AVC)?

A)$28.04
B)$32.40
C)$33.33
D)$38.60
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
For the short-run cost function AVC = a + bQ + cQ2,

A)the AVC curve is <strong>For the short-run cost function AVC = a + bQ + cQ<sup>2</sup>,</strong> A)the AVC curve is   -shaped when a < 0,b > 0,and c < 0. B)the AVC curve is   -shaped when a > 0,b < 0,and c > 0. C)the corresponding SMC function is   . D)both a and c E)all of the above -shaped when a < 0,b > 0,and c < 0.
B)the AVC curve is <strong>For the short-run cost function AVC = a + bQ + cQ<sup>2</sup>,</strong> A)the AVC curve is   -shaped when a < 0,b > 0,and c < 0. B)the AVC curve is   -shaped when a > 0,b < 0,and c > 0. C)the corresponding SMC function is   . D)both a and c E)all of the above -shaped when a > 0,b < 0,and c > 0.
C)the corresponding SMC function is <strong>For the short-run cost function AVC = a + bQ + cQ<sup>2</sup>,</strong> A)the AVC curve is   -shaped when a < 0,b > 0,and c < 0. B)the AVC curve is   -shaped when a > 0,b < 0,and c > 0. C)the corresponding SMC function is   . D)both a and c E)all of the above .
D)both a and c
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.The product curves)in the short-run are</strong> A)TP = -12.96 L<sup>3</sup> + 1,728L<sup>2</sup>. B)AP = -12.96 L<sup>3</sup> + 1,728L<sup>2</sup>. C)MP = -38.88 L<sup>2</sup> + 3,456L. D)both a and b E)both a and c Suppose the firm employs 12 units of capital.The product curves)in the short-run are

A)TP = -12.96 L3 + 1,728L2.
B)AP = -12.96 L3 + 1,728L2.
C)MP = -38.88 L2 + 3,456L.
D)both a and b
E)both a and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total variable cost TVC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000. <strong>Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form   and obtained the following results.Total fixed cost TFC)at Straker Industries is $1,000.   If Straker Industries produces 20 units of output,what is estimated total variable cost TVC)?</strong> A)$1,348 B)$1,498 C)$2,348 D)$4,428 If Straker Industries produces 20 units of output,what is estimated total variable cost TVC)?

A)$1,348
B)$1,498
C)$2,348
D)$4,428
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
The empirical specification <strong>The empirical specification   can be used to estimate</strong> A)a short-run cubic production function. B)short-run cubic cost function. C)a family of U-shaped product curves. D)both a and c E)none of the above can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a family of U-shaped product curves.
D)both a and c
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
The empirical specification <strong>The empirical specification   can be used to estimate</strong> A)a short-run cubic production function. B)short-run cubic cost function. C)a   -shaped TVC curve. D)both b and c E)none of the above can be used to estimate

A)a short-run cubic production function.
B)short-run cubic cost function.
C)a <strong>The empirical specification   can be used to estimate</strong> A)a short-run cubic production function. B)short-run cubic cost function. C)a   -shaped TVC curve. D)both b and c E)none of the above -shaped TVC curve.
D)both b and c
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,average variable cost AVC)is</strong> A)rising B)falling C)greater than short-run marginal cost D)less than short-run marginal cost E)both b and c Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,average variable cost AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both b and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is short-run marginal cost SMC)?</strong> A)$20 B)$42 C)$72 D)$90 E)$100 Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is short-run marginal cost SMC)?

A)$20
B)$42
C)$72
D)$90
E)$100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.What is total variable cost TVC)at Greene Enterprises when average variable cost AVC)is at its minimum?</strong> A)$48,000 B)$101,101 C)$137,222 D)$190,476 E)$437,212 Greene Enterprises faces total fixed costs TFC)of $300,000.What is total variable cost TVC)at Greene Enterprises when average variable cost AVC)is at its minimum?

A)$48,000
B)$101,101
C)$137,222
D)$190,476
E)$437,212
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.Marginal product when 10 units of labor are employed is</strong> A)12,248 B)13,142 C)14,287 D)15,984 E)30,672 Suppose the firm employs 12 units of capital.Marginal product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.At what level of output does average variable cost AVC)reach its minimum value for Greene Enterprises?</strong> A)800 B)3,144 C)3,800 D)4,333 E)51,672 Greene Enterprises faces total fixed costs TFC)of $300,000.At what level of output does average variable cost AVC)reach its minimum value for Greene Enterprises?

A)800
B)3,144
C)3,800
D)4,333
E)51,672
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 6,000 units,average variable cost AVC)is</strong> A)rising B)falling C)greater than short-run marginal cost D)less than short-run marginal cost E)both a and d Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 6,000 units,average variable cost AVC)is

A)rising
B)falling
C)greater than short-run marginal cost
D)less than short-run marginal cost
E)both a and d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is average variable cost AVC)?</strong> A)$20 B)$48 C)$62 D)$72 E)$85 Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is average variable cost AVC)?

A)$20
B)$48
C)$62
D)$72
E)$85
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated average total cost ATC)?</strong> A)$40 B)$75.25 C)$80 D)$90 E)$168.42 Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated average total cost ATC)?

A)$40
B)$75.25
C)$80
D)$90
E)$168.42
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.At Greene Enterprises,average variable cost AVC)reaches its minimum value at $________.</strong> A)$28.00 B)$31.67 C)$39.64 D)$43.33 E)$82.00 Greene Enterprises faces total fixed costs TFC)of $300,000.At Greene Enterprises,average variable cost AVC)reaches its minimum value at $________.

A)$28.00
B)$31.67
C)$39.64
D)$43.33
E)$82.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is total cost TC)?</strong> A)$144,000 B)$396,000 C)$444,000 D)$642,000 E)$846,000 Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene's output is 2,000 units,what is total cost TC)?

A)$144,000
B)$396,000
C)$444,000
D)$642,000
E)$846,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated short-run marginal cost SMC)?</strong> A)$45.60 B)$62.40 C)$83 D)$92 E)$100 Greene Enterprises faces total fixed costs TFC)of $300,000.If Greene Enterprises produces 6,000 units of output,what is estimated short-run marginal cost SMC)?

A)$45.60
B)$62.40
C)$83
D)$92
E)$100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be <strong>The manager of Greene Enterprises,Inc.,recently estimated its average variable cost AVC)function to be   Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene Enterprises produces 6,000 units,average variable cost AVC)is $_________.</strong> A)$40 B)$49.62 C)$55 D)$60 E)$72.46 Greene Enterprises faces total fixed costs TFC)of $300,000.When Greene Enterprises produces 6,000 units,average variable cost AVC)is $_________.

A)$40
B)$49.62
C)$55
D)$60
E)$72.46
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.Average product when 10 units of labor are employed is</strong> A)12,248 B)13,142 C)14,287 D)15,984 E)30,672 Suppose the firm employs 12 units of capital.Average product when 10 units of labor are employed is

A)12,248
B)13,142
C)14,287
D)15,984
E)30,672
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
A firm estimates its long-run production function to be <strong>A firm estimates its long-run production function to be   Suppose the firm employs 12 units of capital.At ________ units of labor,average product of labor begins to diminish.</strong> A)32.21 B)44.44 C)66.67 D)76.66 E)82.27 Suppose the firm employs 12 units of capital.At ________ units of labor,average product of labor begins to diminish.

A)32.21
B)44.44
C)66.67
D)76.66
E)82.27
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
A short-run marginal cost function is estimated as <strong>A short-run marginal cost function is estimated as   .Which of the following cost functions is associated with this estimated SMC equation?</strong> A)TVC = 96Q - 2Q<sup>2</sup> + 0.05Q<sup>3</sup> B)SMC = 96 - 4Q + 0.1Q<sup>2</sup> C)TVC = 96Q + 4Q<sup>2</sup> + 0.15Q<sup>3</sup> D)AVC = 96 - 2Q + 0.05Q<sup>2</sup> E)a and d .Which of the following cost functions is associated with this estimated SMC equation?

A)TVC = 96Q - 2Q2 + 0.05Q3
B)SMC = 96 - 4Q + 0.1Q2
C)TVC = 96Q + 4Q2 + 0.15Q3
D)AVC = 96 - 2Q + 0.05Q2
E)a and d
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.