Deck 25: Learning Curves

ملء الشاشة (f)
exit full mode
سؤال
Experience curves are the opposite of learning curves-as one rises,the other falls.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
On an ordinary graph,unit times decrease at a decreasing rate,but on a log-log graph,the learning "curve" appears as a straight line.
سؤال
The arithmetic approach (or successive doubling approach)to learning curve calculations allows us to determine the hours required for any unit.
سؤال
A firm that successfully pursues a steeper-than-industry-average learning curve and manages costs down may still fail if,by underestimating a strong competitor,it fails to gain the added volume necessary for the learning curve to exist.
سؤال
Experience curves may be valid for industrial applications,but have no role in services such as health care procedures.
سؤال
A project manager bases his time and labour estimates on a learning curve of 86%.The actual learning curve turns out to be 89%.The manager,because of the decreased learning,will complete his project in more time and with more labour use.
سؤال
Learning curves can be used to establish budgets.
سؤال
The earliest application of learning curves appears in the work of architect Frank Lloyd Wright.
سؤال
Learning curves can only be applied to labour.
سؤال
The logarithmic approach to learning curve calculations allows us to determine the hours required for any unit.
سؤال
A 90% learning curve implies that each time the production volume is doubled the direct time per unit is reduced to 90% of its previous value.
سؤال
The learning curve in the steel industry and the learning curve in heart transplant operations have both been estimated at 79%.
سؤال
The learning curve may not be permanent;it can be disrupted by changes in process,personnel,or product.
سؤال
If the first unit in a series of units takes 200 days to complete,and the learning curve is 80%,then the second unit will take 160 days.
سؤال
The learning curve coefficient approach may be simpler to use than the logarithmic approach,but it requires the presence of a table of learning coefficients.
سؤال
In the logarithmic approach formula to compute the time for the Nth unit,TN = T1Nb,the exponent b is the learning curve rate L,expressed as a decimal.
سؤال
If the learning curve for a process is 100%,then each unit in a series of units will have the same labour requirements.
سؤال
Learning curves are based on the premise that people and organizations become better at their tasks as the tasks are repeated.
سؤال
Reevaluation of learning curves is inappropriate.
سؤال
An 80% learning curve means that with each unit increase in production,labour requirements fall by 20%.
سؤال
A learning curve

A)plots man-hours per dollar versus time.
B)is mathematically described by a parabola.
C)should be plotted on polar coordinate graph paper.
D)is based on the premise that organizations learn from experience.
E)follows a normal distribution.
سؤال
Which one of the following statements about learning curves is true?

A)A learning curve assumes that the direct labour requirements per unit will DECREASE at an INCREASING rate as cumulative production increases.
B)A larger learning curve rate implies faster (greater)learning.
C)A learning curve graph usually follows a negative exponential curve.
D)Learning curves can be used only for individuals,not for the whole organization.
E)A lower learning curve rate implies weakness in learning.
سؤال
If it took 1000 hours to produce the first unit of a product,and the learning curve is 70%,how long will it take to produce units 26 through 50?

A)12,307 hours
B)8,404 hours
C)134 hours
D)3,903 hours
E)1,134 hours
سؤال
Learning curves have a variety of purposes,which can be placed into which of these broad categories?

A)services,industry,and military
B)internal,external,and strategic
C)wholesale,distribution,and retail
D)arithmetic,logarithmic,and learning coefficients
E)positive learning,neutral learning,and negative learning
سؤال
Learning curves are

A)the same for all products but different for different organizations.
B)the same for all organizations but different for different products.
C)the same for all organizations and all products.
D)different for different organizations and different products.
E)appropriate in services but not in manufacturing.
سؤال
The learning curve rate is

A)the percentage of time it will take to make each unit when the production rate doubles.
B)the log-log of the annual rate change divided by the average unit cost.
C)always based on constant value dollars.
D)only considered valid after one year of data is accumulated.
E)always equal to at least 75%.
سؤال
Which of the following statements regarding the usefulness of learning curves is false?

A)An external use of learning curves is in supply-chain negotiations.
B)A strategic use of learning curves is in evaluating company and industry performance.
C)An internal use of learning curves is in establishing costs.
D)An internal use of learning curves is in labour forecasting.
E)A strategic use of learning curves is in establishing budgets.
سؤال
Learning curves (or experience curves)were first applied to industry by ________ who was studying ________.

A)Frank Lloyd Wright;architecture
B)Frank Gilbreth;worker efficiency
C)T.P.Wright;air frame manufacture
D)Lillian Gilbreth;factory efficiency
E)Frederick W.Taylor;scientific management
سؤال
The fundamental premise underlying learning curve analysis is that

A)tasks can be easily learned in organizations.
B)organizations and people become better at their tasks as the tasks are repeated.
C)learning takes place when people in organizations change.
D)total labour costs decrease as the number of production units increases.
E)doubling output cuts labour requirements per unit in half.
سؤال
Learning curves can be applied to a variety of purposes internal to a firm,including

A)labour forecasting.
B)scheduling.
C)establishing costs.
D)establishing budgets.
E)all of these.
سؤال
The learning curve for a product is 80%.The first unit took 100 hours to complete.The manufacturer wants to determine how many hours the fifth unit will take by using the logarithmic method.The coefficient b for that calculation is approximately

A)-.0969.
B)-.2231.
C)-.3219.
D).80.
E)1.903.
سؤال
Which of the following best conveys the essence of learning curves?

A)As the number of repetitions increases,time per unit increases.
B)As the number of repetitions decreases,time per unit increases.
C)As the number of repetitions increases,time per unit decreases.
D)As the number of repetitions increases,time per unit remains constant.
E)As the number of repetitions increases,time per unit doubles.
سؤال
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 30th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 200 hours
B)from 200 to 225 hours
C)from 225 to 250 hours
D)from 2501 to 275 hours
E)275 or more hours
سؤال
Which of the following statements comparing learning curve rates (L)to improvement rates is true?

A)The learning rate is the same as the improvement rate.
B)The learning rate is a decimal value while the improvement rate is a percentage.
C)A 90% learning curve corresponds to a 10% rate of improvement.
D)Learning rates apply to labour only,while improvement rates apply to all resources.
E)"Learning rates" is American usage,while "improvement rates" is British.
سؤال
The learning curve for a product is 90%.The first unit took 10 hours to complete.The manufacturer wants to determine how many hours the fourth unit will take by using the logarithmic method.The coefficient b for that calculation is approximately

A)-.1053.
B)-.1520.
C)-.3219.
D).6931.
E)8.1.
سؤال
Which of the following statements is most appropriate with respect to a 70% learning curve?

A)There will be a 70% decrease in direct labour per unit each time the production volume doubles.
B)Each successive unit of production will take 70% of the direct labour of the previous unit.
C)There will be a 30% decrease in direct labour per unit each time production volume doubles.
D)Thirty percent of the production will be defective until full learning takes place.
E)Seventy percent of the workforce is fully educated.
سؤال
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 250 hours
B)from 251 to 275 hours
C)from 276 to 300 hours
D)from 301 to 325 hours
E)325 or more hours
سؤال
A 100% learning curve implies that

A)learning is taking place for all products and workers.
B)learning is taking place at the best possible level.
C)a 100% reduction in the direct labour time takes place each time the production is doubled.
D)no learning is taking place.
E)maximum learning is taking place.
سؤال
A job with a 90% learning curve required 20 hours for the initial unit.The fourth unit should require approximately how many hours?

A)16.0
B)16.2
C)18.0
D)20.0
E)54.2
سؤال
The fact that human activities typically improve when they are done on a repetitive basis is described by a

A)normal distribution curve.
B)binomial distribution curve.
C)learning curve.
D)Poisson distribution curve.
E)repetition curve.
سؤال
It took 60 hours to make the first unit of a product.After the second and third units were made,the learning curve was estimated to be 80%.At $10 per hour,estimate the labour bill for the fourth unit.(Use at least three decimals in the exponent if you use the logarithmic approach. )

A)$400 or less
B)from $400 to $420
C)from $420 to $440
D)from $1800 to $2000
E)over $2000
سؤال
The first unit of a product took 1,000 hours to build and the learning curve is 85%.How long will it take to make the first 5 units? (Use Table E.3 in the text. )

A)less than 4,005 hours
B)from 4,005 to 4,015 hours
C)from 4,015 to 4,025 hours
D)from 4,025 to 4,035 hours
E)from 4,035 to 4,045 hours
سؤال
The first unit took 10 hours and the eighth unit took 1.25 hours.What is the learning curve?

A)50%
B)90%
C)80%
D)12.5%
E)25%
سؤال
A company negotiates a price for two aircraft that includes a reduction in labour on the second aircraft consistent with a 70% learning curve.Suppose the first aircraft took 100 hours.If the improvement rate changes to 20%,how will the total time to complete both aircraft change?

A)no change
B)-10 hours
C)+ 10 hours
D)-50 hours
E)+ 50 hours
سؤال
The first unit took 10 hours and the third unit took 5.7 hours.What is the improvement rate?

A)70%
B)30%
C)50%
D)90%
E)10%
سؤال
The first unit took 10 hours and the fourth unit took 8.1 hours to complete.What is the learning curve?

A)100%
B)99%
C)95%
D)90%
E)80%
سؤال
Suppose that there are two products with the same first product time.However,product A has an improvement rate of 10% while product B has an improvement rate of 20%.How much longer will it take to make the 10th unit of product A compared to product B?

A)Both will have the identical time for the 10th unit.
B)A will take 48% more time.
C)A will take 48% less time.
D)A will take 23% less time.
E)A will take 23% more time.
سؤال
A defence contractor has just started producing turbines for a new government contract.The first turbine took 7000 hours to produce.If the learning curve is 90%,how long will it take to produce the 10th turbine? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 4800 hours
B)from 4800 to 4900 hours
C)from 4900 to 5000 hours
D)from 5000 to 5100 hours
E)over 5100 hours
سؤال
The first product took 10 hours to build and the learning curve is estimated to be 90%.How long with it take to make the fourth unit?

A)10 hours
B)9 hours
C)8.1 hours
D)7.5 hours
E)7.0 hours
سؤال
A defence contractor has just started producing engines for a new government contract.The first engine took 800 hours to produce.If the learning curve is 80%,how long will it take to produce the first 20 engines? (Use at least three decimals in the exponent if you use the logarithmic approach,or Use Table E.3 (in the text)cumulative coefficient. )

A)less than or equal to 1000 hours
B)from 1000 to 8000 hours
C)from 8000 to 8500 hours
D)from 8500 to 10000 hours
E)10,000 or more hours
سؤال
The first unit took 10 hours and the fourth unit 8.1 hours.What is the improvement rate?

A)99%
B)95%
C)90%
D)15%
E)none of the above
سؤال
The first unit of a product took 832 hours to build,and the learning curve is 90%.How long will it take to make the 25th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)time ≤ 500 hours
B)500 < time ≤ 525
C)525 < time ≤ 530
D)530 < time ≤ 550
E)time > 550
سؤال
The first unit of a product took 80 work days.The learning curve is estimated to be 90%.The time for the fourth unit will be about ________ work days and the time for the first four units will be about ________ work days.(Use Table E.3 in the text. )

A)51;250
B)250;51
C)65;285
D)51;cannot be determined
E)65;cannot be determined
سؤال
The first unit of a product took 50 hours to build,and the learning curve is 80%.How long will it take to make the third unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)under 30 hours
B)about 32 hours
C)about 35 hours
D)about 50 hours
E)about 75 hours
سؤال
The first unit of a product took 50 hours to build,and the learning curve is 85%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 24 hours
B)from 25 to 30 hours
C)from 30 to 35 hours
D)from 35 to 40 hours
E)more than 40 hours
سؤال
It took 18 hours to complete the first two products with an 80% learning curve.How long did the second product take?

A)8 hours
B)10 hours
C)18 hours
D)8.1 hours
E)14.4 hours
سؤال
A manager is trying to estimate the appropriate learning curve for a certain job.The manager notes that the first four units had a total time of 30 minutes.Which learning curve would yield approximately this result if the first unit took 9 minutes? (Use Table E.3 (in the text)cumulative coefficient. )

A)0.70
B)0.75
C)0.80
D)0.85
E)0.90
سؤال
The second unit of production took 9 hours.If the learning curve is 90% how long did the first unit take?

A)9 hours
B)10 hours
C)8.1 hours
D)8.5 hours
E)8.8 hours
سؤال
The first unit of production took 10 hours with an 80% learning curve.How long will it take to complete both the first and second units?

A)10 hours
B)8 hours
C)18 hours
D)9 hours
E)There is not enough information to solve the problem.
سؤال
The first unit of a product took 900 hours to build and the learning curve is 90%.How long will it take to make the first 3 units? (Use Table E.3 in the text. )

A)less than or equal to 2,470 hours
B)from 2,470 to 2,472 hours
C)from 2,472 to 2,475 hours
D)from 2,475 to 2,478 hours
E)from 2,478 to 2,481 hours
سؤال
Companies pursuing a learning curve strategy must increase

A)employee training.
B)costs.
C)quality.
D)volume.
E)staffing levels.
سؤال
Which of the following is not a limitation of the use of learning curves?

A)Any change in personnel,design,or procedure can alter the learning curve.
B)Time measurements on early units completed must be accurate.
C)The culture of the workplace may alter the learning curve.
D)Direct labour and indirect labour may not follow the same learning curves.
E)All of these are limitations of learning curves.
سؤال
What problems in scheduling can arise if adjustments for learning curve effects in operations are not made?
سؤال
Failure to consider the effects of learning can lead to ________ of labour needs.
سؤال
Why do different organizations have different learning curves?
سؤال
"By tradition,learning rates are defined in terms of the complements of their improvement rates." Explain.
سؤال
Which of the following is false regarding learning curves?

A)Learning curves differ from company to company.
B)Learning curves can always be used for indirect labour.
C)Changes in personnel can change the learning curve.
D)The learning curve may spike for a short time even if it is going to drop in the long run.
E)Learning curves help to focus on productivity.
سؤال
In addition to labour,to which other variables have learning curves been applied?
سؤال
If the learning rate for a process is 80%,that same process has a 20% ________.
سؤال
When learning curves are plotted on ________ scales,the "curves" become straight lines.
سؤال
The earliest industrial application of learning curves came from a report by ________.
سؤال
To use the table of learning curve coefficients,you must specify the ________ and the ________.
سؤال
What is the basic premise underlying the learning curve?
سؤال
________ are based on the premise that people and organizations get better at their tasks as the tasks are repeated.
سؤال
Which of the following is a limitation of the use of learning curves?

A)Change in personnel,design,or procedure leave the learning curve unchanged.
B)Learning curves are applicable to services as well as to manufacturing.
C)The culture of the workplace may alter the learning curve.
D)Direct labour and indirect labour follow the same learning curves.
E)Applications of learning curves are of tactical,not strategic,importance.
سؤال
The ________ is the simplest approach to learning curve problems.
سؤال
Which of the following is representative of a firm pursuing a learning curve strategy?

A)aggressive pricing policy
B)focus on productivity improvement
C)building on shared experience
D)keeping capacity growing ahead of demand
E)all of the above
سؤال
Which one of the following courses of actions would not be taken by a firm wanting to pursue a learning curve steeper than the industry average?

A)following an aggressive pricing policy
B)focusing on continuing cost reduction
C)keeping capacity equal to demand to control costs
D)focusing on productivity improvement
E)building on shared experience
سؤال
When comparing a 70% learning curve versus a 90% learning curve,which one results in a more rapid reduction in labour requirements? Why?
سؤال
Describe the earliest application of learning curve concepts to industry.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/111
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 25: Learning Curves
1
Experience curves are the opposite of learning curves-as one rises,the other falls.
False
2
On an ordinary graph,unit times decrease at a decreasing rate,but on a log-log graph,the learning "curve" appears as a straight line.
True
3
The arithmetic approach (or successive doubling approach)to learning curve calculations allows us to determine the hours required for any unit.
False
4
A firm that successfully pursues a steeper-than-industry-average learning curve and manages costs down may still fail if,by underestimating a strong competitor,it fails to gain the added volume necessary for the learning curve to exist.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
5
Experience curves may be valid for industrial applications,but have no role in services such as health care procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
6
A project manager bases his time and labour estimates on a learning curve of 86%.The actual learning curve turns out to be 89%.The manager,because of the decreased learning,will complete his project in more time and with more labour use.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
7
Learning curves can be used to establish budgets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
8
The earliest application of learning curves appears in the work of architect Frank Lloyd Wright.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
9
Learning curves can only be applied to labour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
10
The logarithmic approach to learning curve calculations allows us to determine the hours required for any unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
11
A 90% learning curve implies that each time the production volume is doubled the direct time per unit is reduced to 90% of its previous value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
12
The learning curve in the steel industry and the learning curve in heart transplant operations have both been estimated at 79%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
13
The learning curve may not be permanent;it can be disrupted by changes in process,personnel,or product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
14
If the first unit in a series of units takes 200 days to complete,and the learning curve is 80%,then the second unit will take 160 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
15
The learning curve coefficient approach may be simpler to use than the logarithmic approach,but it requires the presence of a table of learning coefficients.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
16
In the logarithmic approach formula to compute the time for the Nth unit,TN = T1Nb,the exponent b is the learning curve rate L,expressed as a decimal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
17
If the learning curve for a process is 100%,then each unit in a series of units will have the same labour requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
18
Learning curves are based on the premise that people and organizations become better at their tasks as the tasks are repeated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
19
Reevaluation of learning curves is inappropriate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
20
An 80% learning curve means that with each unit increase in production,labour requirements fall by 20%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
21
A learning curve

A)plots man-hours per dollar versus time.
B)is mathematically described by a parabola.
C)should be plotted on polar coordinate graph paper.
D)is based on the premise that organizations learn from experience.
E)follows a normal distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which one of the following statements about learning curves is true?

A)A learning curve assumes that the direct labour requirements per unit will DECREASE at an INCREASING rate as cumulative production increases.
B)A larger learning curve rate implies faster (greater)learning.
C)A learning curve graph usually follows a negative exponential curve.
D)Learning curves can be used only for individuals,not for the whole organization.
E)A lower learning curve rate implies weakness in learning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
23
If it took 1000 hours to produce the first unit of a product,and the learning curve is 70%,how long will it take to produce units 26 through 50?

A)12,307 hours
B)8,404 hours
C)134 hours
D)3,903 hours
E)1,134 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
24
Learning curves have a variety of purposes,which can be placed into which of these broad categories?

A)services,industry,and military
B)internal,external,and strategic
C)wholesale,distribution,and retail
D)arithmetic,logarithmic,and learning coefficients
E)positive learning,neutral learning,and negative learning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
25
Learning curves are

A)the same for all products but different for different organizations.
B)the same for all organizations but different for different products.
C)the same for all organizations and all products.
D)different for different organizations and different products.
E)appropriate in services but not in manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
26
The learning curve rate is

A)the percentage of time it will take to make each unit when the production rate doubles.
B)the log-log of the annual rate change divided by the average unit cost.
C)always based on constant value dollars.
D)only considered valid after one year of data is accumulated.
E)always equal to at least 75%.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following statements regarding the usefulness of learning curves is false?

A)An external use of learning curves is in supply-chain negotiations.
B)A strategic use of learning curves is in evaluating company and industry performance.
C)An internal use of learning curves is in establishing costs.
D)An internal use of learning curves is in labour forecasting.
E)A strategic use of learning curves is in establishing budgets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
28
Learning curves (or experience curves)were first applied to industry by ________ who was studying ________.

A)Frank Lloyd Wright;architecture
B)Frank Gilbreth;worker efficiency
C)T.P.Wright;air frame manufacture
D)Lillian Gilbreth;factory efficiency
E)Frederick W.Taylor;scientific management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
29
The fundamental premise underlying learning curve analysis is that

A)tasks can be easily learned in organizations.
B)organizations and people become better at their tasks as the tasks are repeated.
C)learning takes place when people in organizations change.
D)total labour costs decrease as the number of production units increases.
E)doubling output cuts labour requirements per unit in half.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
30
Learning curves can be applied to a variety of purposes internal to a firm,including

A)labour forecasting.
B)scheduling.
C)establishing costs.
D)establishing budgets.
E)all of these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
31
The learning curve for a product is 80%.The first unit took 100 hours to complete.The manufacturer wants to determine how many hours the fifth unit will take by using the logarithmic method.The coefficient b for that calculation is approximately

A)-.0969.
B)-.2231.
C)-.3219.
D).80.
E)1.903.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following best conveys the essence of learning curves?

A)As the number of repetitions increases,time per unit increases.
B)As the number of repetitions decreases,time per unit increases.
C)As the number of repetitions increases,time per unit decreases.
D)As the number of repetitions increases,time per unit remains constant.
E)As the number of repetitions increases,time per unit doubles.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
33
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 30th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 200 hours
B)from 200 to 225 hours
C)from 225 to 250 hours
D)from 2501 to 275 hours
E)275 or more hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following statements comparing learning curve rates (L)to improvement rates is true?

A)The learning rate is the same as the improvement rate.
B)The learning rate is a decimal value while the improvement rate is a percentage.
C)A 90% learning curve corresponds to a 10% rate of improvement.
D)Learning rates apply to labour only,while improvement rates apply to all resources.
E)"Learning rates" is American usage,while "improvement rates" is British.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
35
The learning curve for a product is 90%.The first unit took 10 hours to complete.The manufacturer wants to determine how many hours the fourth unit will take by using the logarithmic method.The coefficient b for that calculation is approximately

A)-.1053.
B)-.1520.
C)-.3219.
D).6931.
E)8.1.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following statements is most appropriate with respect to a 70% learning curve?

A)There will be a 70% decrease in direct labour per unit each time the production volume doubles.
B)Each successive unit of production will take 70% of the direct labour of the previous unit.
C)There will be a 30% decrease in direct labour per unit each time production volume doubles.
D)Thirty percent of the production will be defective until full learning takes place.
E)Seventy percent of the workforce is fully educated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
37
The first unit of a product took 832 hours to build,and the learning curve is 75%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 250 hours
B)from 251 to 275 hours
C)from 276 to 300 hours
D)from 301 to 325 hours
E)325 or more hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
38
A 100% learning curve implies that

A)learning is taking place for all products and workers.
B)learning is taking place at the best possible level.
C)a 100% reduction in the direct labour time takes place each time the production is doubled.
D)no learning is taking place.
E)maximum learning is taking place.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
39
A job with a 90% learning curve required 20 hours for the initial unit.The fourth unit should require approximately how many hours?

A)16.0
B)16.2
C)18.0
D)20.0
E)54.2
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
40
The fact that human activities typically improve when they are done on a repetitive basis is described by a

A)normal distribution curve.
B)binomial distribution curve.
C)learning curve.
D)Poisson distribution curve.
E)repetition curve.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
41
It took 60 hours to make the first unit of a product.After the second and third units were made,the learning curve was estimated to be 80%.At $10 per hour,estimate the labour bill for the fourth unit.(Use at least three decimals in the exponent if you use the logarithmic approach. )

A)$400 or less
B)from $400 to $420
C)from $420 to $440
D)from $1800 to $2000
E)over $2000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
42
The first unit of a product took 1,000 hours to build and the learning curve is 85%.How long will it take to make the first 5 units? (Use Table E.3 in the text. )

A)less than 4,005 hours
B)from 4,005 to 4,015 hours
C)from 4,015 to 4,025 hours
D)from 4,025 to 4,035 hours
E)from 4,035 to 4,045 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
43
The first unit took 10 hours and the eighth unit took 1.25 hours.What is the learning curve?

A)50%
B)90%
C)80%
D)12.5%
E)25%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
44
A company negotiates a price for two aircraft that includes a reduction in labour on the second aircraft consistent with a 70% learning curve.Suppose the first aircraft took 100 hours.If the improvement rate changes to 20%,how will the total time to complete both aircraft change?

A)no change
B)-10 hours
C)+ 10 hours
D)-50 hours
E)+ 50 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
45
The first unit took 10 hours and the third unit took 5.7 hours.What is the improvement rate?

A)70%
B)30%
C)50%
D)90%
E)10%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
46
The first unit took 10 hours and the fourth unit took 8.1 hours to complete.What is the learning curve?

A)100%
B)99%
C)95%
D)90%
E)80%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
47
Suppose that there are two products with the same first product time.However,product A has an improvement rate of 10% while product B has an improvement rate of 20%.How much longer will it take to make the 10th unit of product A compared to product B?

A)Both will have the identical time for the 10th unit.
B)A will take 48% more time.
C)A will take 48% less time.
D)A will take 23% less time.
E)A will take 23% more time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
48
A defence contractor has just started producing turbines for a new government contract.The first turbine took 7000 hours to produce.If the learning curve is 90%,how long will it take to produce the 10th turbine? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 4800 hours
B)from 4800 to 4900 hours
C)from 4900 to 5000 hours
D)from 5000 to 5100 hours
E)over 5100 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
49
The first product took 10 hours to build and the learning curve is estimated to be 90%.How long with it take to make the fourth unit?

A)10 hours
B)9 hours
C)8.1 hours
D)7.5 hours
E)7.0 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
50
A defence contractor has just started producing engines for a new government contract.The first engine took 800 hours to produce.If the learning curve is 80%,how long will it take to produce the first 20 engines? (Use at least three decimals in the exponent if you use the logarithmic approach,or Use Table E.3 (in the text)cumulative coefficient. )

A)less than or equal to 1000 hours
B)from 1000 to 8000 hours
C)from 8000 to 8500 hours
D)from 8500 to 10000 hours
E)10,000 or more hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
51
The first unit took 10 hours and the fourth unit 8.1 hours.What is the improvement rate?

A)99%
B)95%
C)90%
D)15%
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
52
The first unit of a product took 832 hours to build,and the learning curve is 90%.How long will it take to make the 25th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)time ≤ 500 hours
B)500 < time ≤ 525
C)525 < time ≤ 530
D)530 < time ≤ 550
E)time > 550
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
53
The first unit of a product took 80 work days.The learning curve is estimated to be 90%.The time for the fourth unit will be about ________ work days and the time for the first four units will be about ________ work days.(Use Table E.3 in the text. )

A)51;250
B)250;51
C)65;285
D)51;cannot be determined
E)65;cannot be determined
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
54
The first unit of a product took 50 hours to build,and the learning curve is 80%.How long will it take to make the third unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)under 30 hours
B)about 32 hours
C)about 35 hours
D)about 50 hours
E)about 75 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
55
The first unit of a product took 50 hours to build,and the learning curve is 85%.How long will it take to make the 10th unit? (Use at least three decimals in the exponent if you use the logarithmic approach. )

A)less than 24 hours
B)from 25 to 30 hours
C)from 30 to 35 hours
D)from 35 to 40 hours
E)more than 40 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
56
It took 18 hours to complete the first two products with an 80% learning curve.How long did the second product take?

A)8 hours
B)10 hours
C)18 hours
D)8.1 hours
E)14.4 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
57
A manager is trying to estimate the appropriate learning curve for a certain job.The manager notes that the first four units had a total time of 30 minutes.Which learning curve would yield approximately this result if the first unit took 9 minutes? (Use Table E.3 (in the text)cumulative coefficient. )

A)0.70
B)0.75
C)0.80
D)0.85
E)0.90
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
58
The second unit of production took 9 hours.If the learning curve is 90% how long did the first unit take?

A)9 hours
B)10 hours
C)8.1 hours
D)8.5 hours
E)8.8 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
59
The first unit of production took 10 hours with an 80% learning curve.How long will it take to complete both the first and second units?

A)10 hours
B)8 hours
C)18 hours
D)9 hours
E)There is not enough information to solve the problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
60
The first unit of a product took 900 hours to build and the learning curve is 90%.How long will it take to make the first 3 units? (Use Table E.3 in the text. )

A)less than or equal to 2,470 hours
B)from 2,470 to 2,472 hours
C)from 2,472 to 2,475 hours
D)from 2,475 to 2,478 hours
E)from 2,478 to 2,481 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
61
Companies pursuing a learning curve strategy must increase

A)employee training.
B)costs.
C)quality.
D)volume.
E)staffing levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which of the following is not a limitation of the use of learning curves?

A)Any change in personnel,design,or procedure can alter the learning curve.
B)Time measurements on early units completed must be accurate.
C)The culture of the workplace may alter the learning curve.
D)Direct labour and indirect labour may not follow the same learning curves.
E)All of these are limitations of learning curves.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
63
What problems in scheduling can arise if adjustments for learning curve effects in operations are not made?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
64
Failure to consider the effects of learning can lead to ________ of labour needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
65
Why do different organizations have different learning curves?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
66
"By tradition,learning rates are defined in terms of the complements of their improvement rates." Explain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following is false regarding learning curves?

A)Learning curves differ from company to company.
B)Learning curves can always be used for indirect labour.
C)Changes in personnel can change the learning curve.
D)The learning curve may spike for a short time even if it is going to drop in the long run.
E)Learning curves help to focus on productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
68
In addition to labour,to which other variables have learning curves been applied?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
69
If the learning rate for a process is 80%,that same process has a 20% ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
70
When learning curves are plotted on ________ scales,the "curves" become straight lines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
71
The earliest industrial application of learning curves came from a report by ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
72
To use the table of learning curve coefficients,you must specify the ________ and the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
73
What is the basic premise underlying the learning curve?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
74
________ are based on the premise that people and organizations get better at their tasks as the tasks are repeated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
75
Which of the following is a limitation of the use of learning curves?

A)Change in personnel,design,or procedure leave the learning curve unchanged.
B)Learning curves are applicable to services as well as to manufacturing.
C)The culture of the workplace may alter the learning curve.
D)Direct labour and indirect labour follow the same learning curves.
E)Applications of learning curves are of tactical,not strategic,importance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
76
The ________ is the simplest approach to learning curve problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which of the following is representative of a firm pursuing a learning curve strategy?

A)aggressive pricing policy
B)focus on productivity improvement
C)building on shared experience
D)keeping capacity growing ahead of demand
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
78
Which one of the following courses of actions would not be taken by a firm wanting to pursue a learning curve steeper than the industry average?

A)following an aggressive pricing policy
B)focusing on continuing cost reduction
C)keeping capacity equal to demand to control costs
D)focusing on productivity improvement
E)building on shared experience
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
79
When comparing a 70% learning curve versus a 90% learning curve,which one results in a more rapid reduction in labour requirements? Why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
80
Describe the earliest application of learning curve concepts to industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 111 في هذه المجموعة.