Deck 12: Project Monitoring and Control, Part II

ملء الشاشة (f)
exit full mode
سؤال
Describe at least four general guidelines that should be followed during the monitoring and control process.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
It is very important that the quality monitoring and control process be executed continuously throughout the entire project, from the time the project charter is signed until the project sponsor accepts the final deliverable.
سؤال
What is the difference between monitoring and control?
سؤال
A Pareto diagram is a bar chart that displays, by frequency and in descending order, the most important errors.
سؤال
Throughout the history of IT projects, when money is running short or time is running out and the project must be completed, the quality of the end product is often sacrificed.
سؤال
If the project team is geographically dispersed, the task of collecting data is easier.
سؤال
Monitoring is concerned with collecting and reporting information about project performance to all stakeholders and the project team.
سؤال
Describe the different components of the Pareto diagram and how it is created.
سؤال
Explain the concerns of the seller and the concerns of the buyer in the procurement administration process.
سؤال
Name and describe three tools used to monitor and control project quality.
سؤال
Describe the different components of the control chart, and explain at least three possibilities for interpreting various kinds of patterns or runs on the control chart.
سؤال
Monitoring and control are two separate steps put together into one process group within the project life cycle.
سؤال
Where does quality control process fall in the continuous quality cycle for improvement?
سؤال
In quality control, explain the difference between prevention and inspection.
سؤال
Reporting uses the information supplied by the monitoring process to bring the actual project performance in line with what was planned.
سؤال
Describe the different components of the fishbone diagram and the process and steps to create the drawing.
سؤال
Describe four different categories of performance reports.
سؤال
The triple constraint of project management includes the scope of what is to be produced, the time it should take, and the cost of producing the product or service the project was initiated to create. A fourth item that also constrains all IT projects is resources.
سؤال
Getting accurate data, depending on the size and nature of the project, is never difficult.
سؤال
Much of the monitoring function in medium to large projects is generally done by a separate department that is specifically trained and unbiased-at least this is the goal.
سؤال
Getting the sample size right is extremely important because choosing too many samples is a waste of time and money, and choosing too few will not yield accurate information.
سؤال
A cause-and-effect analysis-also called an Pareto diagram after the creator of the technique or a fishbone diagram based on what the final diagram resembles-is used when a problem or issue has been discovered and you need to determine its root cause so that the most appropriate actions can be taken.
سؤال
In the fishbone diagram, each of the rectangular boxes represents a major category of suspicion.
سؤال
The sample source is the number of results needed to determine whether a process or result is performing to standard.
سؤال
Variable sampling rates the result on a continuous scale, measuring the degree of conformity.
سؤال
The performance reporting process involves the collection of project- and product-related data and the distribution of performance information to management only.
سؤال
A result is acceptable if it falls within the range specified by the tolerance or stakeholder set specifications.
سؤال
The Pareto principle states that 20 percent of the impact of a problem will show up in 80 percent of the causes.
سؤال
A control chart is used to prevent problems before they become major issues as opposed to inspecting a final product to find issues.
سؤال
Three tools used to monitor and control project quality are: cause-and-effect analysis, process control charts, and Pareto analysis.
سؤال
Attribute sampling looks at whether the collected result conforms to defined standards at a point in time.
سؤال
Inspection attempts to keep errors out of a process, whereas prevention attempts to keep errors from reaching the final customer.
سؤال
The performance reports generally demonstrate how resources (human and other) are being utilized to achieve project objectives and cover project artifacts and product artifacts.
سؤال
In the continuous quality cycle for improvement-Plan, Do, Study, Act- the Plan and Act processes refer to the quality monitoring and control functions.
سؤال
A benefit of control chart analysis is that it helps determine whether variability is attributable to something that can be fixed or some random set of variables based on chance alone.
سؤال
A Pareto diagram displays the frequency of issues so that project teams can focus on the problems that are occurring most often or are causing the biggest issues in terms of time and/or cost.
سؤال
The process to create the Pareto drawing is relatively simple and is generally done during a group brainstorming session.
سؤال
The tools used to monitor and control project quality graphically display collected statistical results, helping a project team measure variances to aid in the continuous process of improving the quality of a product.
سؤال
In the fishbone diagram, the arrows connecting the categories to the central line have attached to them lines containing more detailed ideas of what might be the root cause for the problem.
سؤال
SWOT analysis helps determine whether the process variability and the process average result are at stable (acceptable) levels and whether one or both are out of control (unacceptable).
سؤال
The quality ________ process involves monitoring specific project results (artifacts) identified during the planning phase of a project to determine whether they comply with the relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

A) assurance
B) control
C) management
D) monitoring
سؤال
The easier the project manager makes it for the team to enter up-to-date information, the more ________ it will become.

A) optional
B) difficult
C) inaccurate
D) accurate
سؤال
________ uses the information supplied by the monitoring process to bring the actual project performance in line with what was planned.

A) Control
B) Monitoring
C) Reporting
D) Analysis
سؤال
This is a bar chart that displays, by frequency and in descending order, the most important errors.

A) Pareto diagram
B) Ishikawa diagram
C) Fishbone diagram
D) Monte Carlo diagram
سؤال
Each executive is responsible for monitoring trigger conditions and updating the team on the status of mitigation strategies and their effectiveness.
سؤال
Prevention attempts to keep errors out of a process, whereas ________ attempts to keep errors from reaching the final customer.

A) monitoring
B) control
C) reaction
D) inspection
سؤال
The ________ of project management includes the scope of what is to be produced, the time it should take, and the cost of producing the product or service the project was initiated to create.

A) schedule
B) project plan
C) triple constraint
D) scope statement
سؤال
Individuals doing their own reporting may be ________ to report bad news on their progress and may hide the real numbers or report false progress.

A) hesitant
B) eager
C) forced
D) absent
سؤال
The procurement administration process is carried out by the seller only to make sure each party meets the respective contractual obligations.
سؤال
________ attempts to keep errors out of a process.

A) Monitoring
B) Control
C) Reaction
D) Prevention
سؤال
Monitoring and controlling risks is a continuous monitoring process for all previously identified risks and for any new risks.
سؤال
For items that fall outside the range of acceptability, ________ actions need to be taken to bring them back into the range of acceptable quality standards.

A) management
B) executive
C) corrective
D) reactive
سؤال
The contract change control system should include procedures for handling any changes to deliverables, completing tracking of the change request and associated implications for cost and schedule, handling dispute resolutions, and getting required approvals to enact any contractual change.
سؤال
Whoever is assigned responsibility for managing a contract must also make sure that all outcomes associated with the work of each seller are formally documented with other project documentation so any future work possibilities with the same seller can be evaluated.
سؤال
Much of the monitoring function in medium to large projects is generally done by a separate department that is specifically trained and ________-at least this is the goal.

A) contracted
B) entry-level
C) remote
D) unbiased
سؤال
________ is concerned with collecting and reporting information about project performance to all stakeholders and the project team.

A) Control
B) Monitoring
C) Reporting
D) Analysis
سؤال
Which of the following is NOT a constraint of project management?

A) Quality
B) Resources
C) Scope
D) Cost
سؤال
Throughout the history of IT projects, when money is running short or time is running out and the project must be completed, the ________ of the end product is often sacrificed.

A) quality
B) usability
C) durability
D) scalability
سؤال
The ________ a team chooses to monitor and control vary from project to project.

A) requirements
B) resources
C) metrics
D) reports
سؤال
Decisions concerning project changes must be based on accurate data, so it is extremely important for a project manager to make it as easy as possible to collect the data by ________ as much of it as possible.

A) eliminating
B) requiring
C) automating
D) optimizing
سؤال
________ sampling rates the result on a continuous scale, measuring the degree of conformity.

A) Variable
B) Attribute
C) Random
D) Statistical
سؤال
In the continuous quality cycle for improvement-Plan, Do, Study, Act- the ________ processes refer to the quality monitoring and control functions.

A) Study and Act
B) Plan and Do
C) Plan and Act
D) Do and Study
سؤال
A result is acceptable if it falls within the range specified by the ________ or stakeholder set specifications.

A) threshold
B) requirements
C) tolerance
D) criteria
سؤال
________ attempts to keep errors from reaching the final customer.

A) Monitoring
B) Inspection
C) Reaction
D) Prevention
سؤال
________ sampling looks at whether the collected result conforms to defined standards at a point in time.

A) Variable
B) Attribute
C) Random
D) Statistical
سؤال
The tools used to monitor and control project quality ________ display collected statistical results, helping a project team measure variances to aid in the continuous process of improving the quality of a product.

A) textually
B) graphically
C) summary
D) remotely
سؤال
Which of the following is NOT one of the three tools used to monitor and control project quality?

A) Monte Carlo analysis
B) Cause-and-effect analysis
C) Pareto analysis
D) Control charts
سؤال
The process is in control (operating within acceptable limits) if the result falls within the control ________.

A) threshold
B) requirements
C) tolerance
D) limits
سؤال
________ analysis helps determine whether the process variability and the process average result are at stable (acceptable) levels and whether one or both are out of control (unacceptable).

A) Pareto
B) Cause-and-effect
C) Control chart
D) SWOT
سؤال
A benefit of control chart analysis is that it helps determine whether variability is attributable to something that can be fixed or some random set of ________ based on chance alone.

A) variables
B) requirements
C) errors
D) criteria
سؤال
In the ________ diagram, each of the rectangular boxes represents a major category of suspicion.

A) SWOT
B) control chart
C) Pareto
D) fishbone
سؤال
In the fishbone diagram, the arrows connecting the categories to the central line have attached to them lines containing more detailed ideas of what might be the ________ for the problem.

A) severity
B) scope
C) root cause
D) solution
سؤال
The ________ process involves the collection of project- and product-related data and the distribution of performance information to stakeholders.

A) project status reporting
B) performance reporting
C) communication distribution
D) tabulation
سؤال
The ________ process is carried out by both a seller and a buyer to make sure each party meets the respective contractual obligations.

A) contractual
B) outsourcing
C) procurement administration
D) purchase
سؤال
A ________-also called an Ishikawa diagram after the creator of the technique or a fishbone diagram based on what the final diagram resembles-is used when a problem or issue has been discovered and you need to determine its root cause so that the most appropriate actions can be taken.

A) Pareto analysis
B) cause-and-effect analysis
C) control analysis
D) SWOT analysis
سؤال
Getting the sample ________ right is extremely important because choosing too many samples is a waste of time and money, and choosing too few will not yield accurate information.

A) size
B) source
C) data
D) population
سؤال
A ________ displays the frequency of issues so that project teams can focus on the problems that are occurring most often or are causing the biggest issues in terms of time and/or cost.

A) Pareto diagram
B) control chart
C) fishbone diagram
D) Ishikawa diagram
سؤال
A contract or seller ________ system needs to be in place to handle all changes to the contract and/or deliverables requested.

A) change control
B) management
C) relation
D) monitoring
سؤال
Each risk owner is responsible for monitoring ________ conditions and updating the team on the status of mitigation strategies and their effectiveness.

A) work package
B) environmental
C) project
D) trigger
سؤال
A ________ is used to prevent problems before they become major issues as opposed to inspecting a final product to find issues.

A) Pareto analysis
B) cause-and-effect analysis
C) control chart
D) SWOT analysis
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Project Monitoring and Control, Part II
1
Describe at least four general guidelines that should be followed during the monitoring and control process.
Listed below are general guidelines that should be followed during the monitoring and control process.
• Educate stakeholders and team members on the need for and use of progress information to foster an environment of honest and accurate reporting.
• Automate the collection of status information as much as possible.
• Frequency of collection is dependent on the size of the project and the location of participants. Regardless of the project characteristics, collection of project status information should never exceed one week, and if possible, it should be done daily.
• Frequency and formatting of reports are outlined in the stakeholder analysis described in Chapter 4.
• Figure 11-1 shows the process for integrated change control.
• Final deliverable approval must be formally obtained from stakeholders before any task can be declared complete.
2
It is very important that the quality monitoring and control process be executed continuously throughout the entire project, from the time the project charter is signed until the project sponsor accepts the final deliverable.
True
3
What is the difference between monitoring and control?
Monitoring and control are two separate steps put together into one process group within the project life cycle. Monitoring is concerned with collecting and reporting information about project performance to all stakeholders and the project team. Control uses the information supplied by the monitoring process to bring the actual project performance in line with what was planned.
4
A Pareto diagram is a bar chart that displays, by frequency and in descending order, the most important errors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
5
Throughout the history of IT projects, when money is running short or time is running out and the project must be completed, the quality of the end product is often sacrificed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
6
If the project team is geographically dispersed, the task of collecting data is easier.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
7
Monitoring is concerned with collecting and reporting information about project performance to all stakeholders and the project team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
8
Describe the different components of the Pareto diagram and how it is created.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
9
Explain the concerns of the seller and the concerns of the buyer in the procurement administration process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
10
Name and describe three tools used to monitor and control project quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
11
Describe the different components of the control chart, and explain at least three possibilities for interpreting various kinds of patterns or runs on the control chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
12
Monitoring and control are two separate steps put together into one process group within the project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
13
Where does quality control process fall in the continuous quality cycle for improvement?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
14
In quality control, explain the difference between prevention and inspection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
15
Reporting uses the information supplied by the monitoring process to bring the actual project performance in line with what was planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
16
Describe the different components of the fishbone diagram and the process and steps to create the drawing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
17
Describe four different categories of performance reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
18
The triple constraint of project management includes the scope of what is to be produced, the time it should take, and the cost of producing the product or service the project was initiated to create. A fourth item that also constrains all IT projects is resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
19
Getting accurate data, depending on the size and nature of the project, is never difficult.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
20
Much of the monitoring function in medium to large projects is generally done by a separate department that is specifically trained and unbiased-at least this is the goal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
21
Getting the sample size right is extremely important because choosing too many samples is a waste of time and money, and choosing too few will not yield accurate information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
22
A cause-and-effect analysis-also called an Pareto diagram after the creator of the technique or a fishbone diagram based on what the final diagram resembles-is used when a problem or issue has been discovered and you need to determine its root cause so that the most appropriate actions can be taken.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
23
In the fishbone diagram, each of the rectangular boxes represents a major category of suspicion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
24
The sample source is the number of results needed to determine whether a process or result is performing to standard.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
25
Variable sampling rates the result on a continuous scale, measuring the degree of conformity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
26
The performance reporting process involves the collection of project- and product-related data and the distribution of performance information to management only.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
27
A result is acceptable if it falls within the range specified by the tolerance or stakeholder set specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
28
The Pareto principle states that 20 percent of the impact of a problem will show up in 80 percent of the causes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
29
A control chart is used to prevent problems before they become major issues as opposed to inspecting a final product to find issues.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
30
Three tools used to monitor and control project quality are: cause-and-effect analysis, process control charts, and Pareto analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
31
Attribute sampling looks at whether the collected result conforms to defined standards at a point in time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
32
Inspection attempts to keep errors out of a process, whereas prevention attempts to keep errors from reaching the final customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
33
The performance reports generally demonstrate how resources (human and other) are being utilized to achieve project objectives and cover project artifacts and product artifacts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
34
In the continuous quality cycle for improvement-Plan, Do, Study, Act- the Plan and Act processes refer to the quality monitoring and control functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
35
A benefit of control chart analysis is that it helps determine whether variability is attributable to something that can be fixed or some random set of variables based on chance alone.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
36
A Pareto diagram displays the frequency of issues so that project teams can focus on the problems that are occurring most often or are causing the biggest issues in terms of time and/or cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
37
The process to create the Pareto drawing is relatively simple and is generally done during a group brainstorming session.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
38
The tools used to monitor and control project quality graphically display collected statistical results, helping a project team measure variances to aid in the continuous process of improving the quality of a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
39
In the fishbone diagram, the arrows connecting the categories to the central line have attached to them lines containing more detailed ideas of what might be the root cause for the problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
40
SWOT analysis helps determine whether the process variability and the process average result are at stable (acceptable) levels and whether one or both are out of control (unacceptable).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
41
The quality ________ process involves monitoring specific project results (artifacts) identified during the planning phase of a project to determine whether they comply with the relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

A) assurance
B) control
C) management
D) monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
42
The easier the project manager makes it for the team to enter up-to-date information, the more ________ it will become.

A) optional
B) difficult
C) inaccurate
D) accurate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
43
________ uses the information supplied by the monitoring process to bring the actual project performance in line with what was planned.

A) Control
B) Monitoring
C) Reporting
D) Analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
44
This is a bar chart that displays, by frequency and in descending order, the most important errors.

A) Pareto diagram
B) Ishikawa diagram
C) Fishbone diagram
D) Monte Carlo diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
45
Each executive is responsible for monitoring trigger conditions and updating the team on the status of mitigation strategies and their effectiveness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
46
Prevention attempts to keep errors out of a process, whereas ________ attempts to keep errors from reaching the final customer.

A) monitoring
B) control
C) reaction
D) inspection
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
47
The ________ of project management includes the scope of what is to be produced, the time it should take, and the cost of producing the product or service the project was initiated to create.

A) schedule
B) project plan
C) triple constraint
D) scope statement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
48
Individuals doing their own reporting may be ________ to report bad news on their progress and may hide the real numbers or report false progress.

A) hesitant
B) eager
C) forced
D) absent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
49
The procurement administration process is carried out by the seller only to make sure each party meets the respective contractual obligations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
50
________ attempts to keep errors out of a process.

A) Monitoring
B) Control
C) Reaction
D) Prevention
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
51
Monitoring and controlling risks is a continuous monitoring process for all previously identified risks and for any new risks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
52
For items that fall outside the range of acceptability, ________ actions need to be taken to bring them back into the range of acceptable quality standards.

A) management
B) executive
C) corrective
D) reactive
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
53
The contract change control system should include procedures for handling any changes to deliverables, completing tracking of the change request and associated implications for cost and schedule, handling dispute resolutions, and getting required approvals to enact any contractual change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
54
Whoever is assigned responsibility for managing a contract must also make sure that all outcomes associated with the work of each seller are formally documented with other project documentation so any future work possibilities with the same seller can be evaluated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
55
Much of the monitoring function in medium to large projects is generally done by a separate department that is specifically trained and ________-at least this is the goal.

A) contracted
B) entry-level
C) remote
D) unbiased
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
56
________ is concerned with collecting and reporting information about project performance to all stakeholders and the project team.

A) Control
B) Monitoring
C) Reporting
D) Analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following is NOT a constraint of project management?

A) Quality
B) Resources
C) Scope
D) Cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
58
Throughout the history of IT projects, when money is running short or time is running out and the project must be completed, the ________ of the end product is often sacrificed.

A) quality
B) usability
C) durability
D) scalability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
59
The ________ a team chooses to monitor and control vary from project to project.

A) requirements
B) resources
C) metrics
D) reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
60
Decisions concerning project changes must be based on accurate data, so it is extremely important for a project manager to make it as easy as possible to collect the data by ________ as much of it as possible.

A) eliminating
B) requiring
C) automating
D) optimizing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
61
________ sampling rates the result on a continuous scale, measuring the degree of conformity.

A) Variable
B) Attribute
C) Random
D) Statistical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
62
In the continuous quality cycle for improvement-Plan, Do, Study, Act- the ________ processes refer to the quality monitoring and control functions.

A) Study and Act
B) Plan and Do
C) Plan and Act
D) Do and Study
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
63
A result is acceptable if it falls within the range specified by the ________ or stakeholder set specifications.

A) threshold
B) requirements
C) tolerance
D) criteria
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
64
________ attempts to keep errors from reaching the final customer.

A) Monitoring
B) Inspection
C) Reaction
D) Prevention
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
65
________ sampling looks at whether the collected result conforms to defined standards at a point in time.

A) Variable
B) Attribute
C) Random
D) Statistical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
66
The tools used to monitor and control project quality ________ display collected statistical results, helping a project team measure variances to aid in the continuous process of improving the quality of a product.

A) textually
B) graphically
C) summary
D) remotely
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following is NOT one of the three tools used to monitor and control project quality?

A) Monte Carlo analysis
B) Cause-and-effect analysis
C) Pareto analysis
D) Control charts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
68
The process is in control (operating within acceptable limits) if the result falls within the control ________.

A) threshold
B) requirements
C) tolerance
D) limits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
69
________ analysis helps determine whether the process variability and the process average result are at stable (acceptable) levels and whether one or both are out of control (unacceptable).

A) Pareto
B) Cause-and-effect
C) Control chart
D) SWOT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
70
A benefit of control chart analysis is that it helps determine whether variability is attributable to something that can be fixed or some random set of ________ based on chance alone.

A) variables
B) requirements
C) errors
D) criteria
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
71
In the ________ diagram, each of the rectangular boxes represents a major category of suspicion.

A) SWOT
B) control chart
C) Pareto
D) fishbone
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
72
In the fishbone diagram, the arrows connecting the categories to the central line have attached to them lines containing more detailed ideas of what might be the ________ for the problem.

A) severity
B) scope
C) root cause
D) solution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
73
The ________ process involves the collection of project- and product-related data and the distribution of performance information to stakeholders.

A) project status reporting
B) performance reporting
C) communication distribution
D) tabulation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
74
The ________ process is carried out by both a seller and a buyer to make sure each party meets the respective contractual obligations.

A) contractual
B) outsourcing
C) procurement administration
D) purchase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
75
A ________-also called an Ishikawa diagram after the creator of the technique or a fishbone diagram based on what the final diagram resembles-is used when a problem or issue has been discovered and you need to determine its root cause so that the most appropriate actions can be taken.

A) Pareto analysis
B) cause-and-effect analysis
C) control analysis
D) SWOT analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
76
Getting the sample ________ right is extremely important because choosing too many samples is a waste of time and money, and choosing too few will not yield accurate information.

A) size
B) source
C) data
D) population
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
77
A ________ displays the frequency of issues so that project teams can focus on the problems that are occurring most often or are causing the biggest issues in terms of time and/or cost.

A) Pareto diagram
B) control chart
C) fishbone diagram
D) Ishikawa diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
78
A contract or seller ________ system needs to be in place to handle all changes to the contract and/or deliverables requested.

A) change control
B) management
C) relation
D) monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
79
Each risk owner is responsible for monitoring ________ conditions and updating the team on the status of mitigation strategies and their effectiveness.

A) work package
B) environmental
C) project
D) trigger
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 80 في هذه المجموعة.
فتح الحزمة
k this deck
80
A ________ is used to prevent problems before they become major issues as opposed to inspecting a final product to find issues.

A) Pareto analysis
B) cause-and-effect analysis
C) control chart
D) SWOT analysis