An assembly line with 11 tasks is to be balanced.The longest task is 2.4 minutes,the shortest task is 0.4 minutes,and the sum of the task times is 18 minutes.The line will operate for 600 minutes per day.
(a)Determine the minimum and maximum cycle times.
(b)What range of output is theoretically possible for the line?
(c)What is the minimum number of stations needed if the maximum output rate is to be sought?
(d)What cycle time will provide an output rate of 200 units per day?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q136: You have been asked to balance a
Q137: Cyclone Appliances has developed a new European-style
Q139: An electronics manufacturer makes remote control devices
Q141: Hemo-tech,Inc. ,a biomedical technology and research laboratory,produces
Q142: A firm is planning to set up
Q144: A facility is trying to set up
Q146: An assembly line is assigned as follows.Station
Q296: Which of the following is NOT a
Q310: Identify the five common layout heuristics used
Q311: A company is trying to balance production
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents