A work cell is scheduled to build 120 digital light processor (DLP)assemblies each week.These assemblies are later installed into home theater projection systems.The work cell has 7.5 hours of productive work each day,six days per week.What is takt time for this cell?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q89: Brandon's computer shop has hired a consultant
Q93: A work cell is required to make
Q94: Balancing a work cell is done:
A)before the
Q248: Which of the following is NOT one
Q258: Which of the following is NOT an
Q259: Mathematically, takt time is:
A) total work time
Q269: "Having a focused work center is like
Q270: _ is the pace (frequency) of production
Q275: The minimum number of workstations depends upon
Q278: A fabrication line and an assembly line
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents