The beta distribution is used in project management to:
A) determine which activity should be crashed.
B) calculate the probability that a project will be completed within its budget.
C) calculate expected activity times.
D) calculate slack for activities on the critical path.
E) none of the above
Correct Answer:
Verified
Q79: A network consists of the following list.Times
Q81: A contractor's project being analyzed by PERT
Q85: An activity on a PERT network has
Q87: Analysis of a PERT problem shows the
Q88: Which of the following statements regarding PERT
Q89: The _ distribution is used by PERT
Q89: A PERT project has 45 activities,19 of
Q105: The _ distribution is appropriate for calculating
Q108: A project whose critical path has an
Q110: PERT calculations typically include the duration variance
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents