Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of ½ a day.Each container (kanban) holds 1 cake.What is the correct number of kanbans?
A) 4
B) 1
C) 5
D) 10
E) 25
Correct Answer:
Verified
Q43: A kanban system requires that the process
Q57: With level schedules, a few large batches,
Q61: A product has annual demand of 100,000
Q62: Which of the following is NOT a
Q62: If a factory wants to cut its
Q63: Lead time for computers is 7 days
Q65: Which of the following is TRUE regarding
Q65: Which one of the following statements is
Q67: The number of kanbans should be equal
Q78: What does the Japanese word "kanban" mean?
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents