A constraint with positive slack or surplus is called a
A) nonbinding constraint.
B) resource constraint.
C) binding constraint.
D) nonlinear constraint.
E) linear constraint.
Correct Answer:
Verified
Q38: The simultaneous equation method is
A)an alternative to
Q39: When a constraint line bounding a feasible
Q40: In a maximization problem,when one or more
Q41: The difference between the left-hand side and
Q42: If the addition of a constraint to
Q44: If one changes the contribution rates in
Q45: Two models of a product - Regular
Q46: A straight line representing all non-negative combinations
Q47: Consider the following linear programming problem:
Q48: Which of the following is not an