Because an activity's pessimistic estimate may represent a much greater deviation from the most likely time than its optimistic estimate,the ________ better represents the distribution of possible alternative durations.
Correct Answer:
Verified
Q25: An activity with two or more immediate
Q26: The longest route through the network is
Q27: The term ordered activity means:
A)tasks must either
Q28: In the beta distribution,the longer tail is
Q29: _ activities have two or more immediate
Q31: Thanks to excessive dilly dallying,the subcontractor grossly
Q32: Serial activities are those that:
A)flow from one
Q33: The amount of time an activity may
Q34: These can be located by doing a
Q35: The least amount of float is found:
A)in