An activity with two or more immediate predecessors is a(n) :
A) merge activity.
B) burst activity.
C) float activity.
D) event.
Correct Answer:
Verified
Q21: Activities that can be worked on simultaneously
Q22: _ activities have two or more immediate
Q23: Pessimistic and optimistic values are estimated at
Q24: Concurrent activities are:
A)activities that must be done
Q26: The longest route through the network is
Q27: The term ordered activity means:
A)tasks must either
Q28: In the beta distribution,the longer tail is
Q29: _ activities have two or more immediate
Q30: Because an activity's pessimistic estimate may represent
Q54: You must know the mean of an