Solved

Performance Measures for Cost Centers

Question 37

Essay

Performance Measures for Cost Centers
A soft drink company has three bottling plants throughout the country. Bottling occurs at the regional level because of the high cost of transporting bottled soft drinks. The parent company supplies each plant with the syrup. The bottling plants combine the syrup with carbonated soda to make and bottle the soft drinks. The bottled soft drinks are then sent to regional grocery stores.
The bottling plants are treated as costs centers. The managers of the bottling plants are evaluated based on minimizing the cost per soft drink bottled and delivered. Each bottling plant uses the same equipment, but some produce more bottles of soft drinks because of different demand. The costs and output for each bottling plant are: Performance Measures for Cost Centers A soft drink company has three bottling plants throughout the country. Bottling occurs at the regional level because of the high cost of transporting bottled soft drinks. The parent company supplies each plant with the syrup. The bottling plants combine the syrup with carbonated soda to make and bottle the soft drinks. The bottled soft drinks are then sent to regional grocery stores. The bottling plants are treated as costs centers. The managers of the bottling plants are evaluated based on minimizing the cost per soft drink bottled and delivered. Each bottling plant uses the same equipment, but some produce more bottles of soft drinks because of different demand. The costs and output for each bottling plant are:   Required: a. Estimate the average cost per unit for each plant. b. Why would the manager of plant A be unhappy with using the average cost as the performance measure? c. What is an alternative performance measure that would make the manager of plant A happier? d. Under what circumstances might the average cost be a better performance measure? Required:
a. Estimate the average cost per unit for each plant.
b. Why would the manager of plant A be unhappy with using the average cost as the performance measure?
c. What is an alternative performance measure that would make the manager of plant A happier?
d. Under what circumstances might the average cost be a better performance measure?

Correct Answer:

verifed

Verified

Performance Measures for Cost Centers
a...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents