A standard cost card is prepared after manufacturing standards have been developed for direct materials,direct labor,and factory overhead.
Correct Answer:
Verified
Q13: The price variance reflects the difference between
Q14: A standard cost card is prepared before
Q15: The difference between the standard hours worked
Q16: The formula for usage variance is (AQ
Q17: The difference between the actual wages paid
Q19: The formula for usage variance is (AQ
Q20: The formula for price/rate variance is (AP
Q21: Favorable variances are represented by debit balances
Q22: Managers have no ability to control the
Q23: The difference between actual and budgeted fixed