A disadvantage of the high-low method of cost analysis is that it
A) typically results in totally inaccurate cost formula.
B) is too time consuming to apply.
C) uses only two data points,which may not be representative of normal conditions.
D) relies totally on the judgment of the person performing the cost analysis.
Correct Answer:
Verified
Q33: Engineering cost estimates are usually based on
Q34: Which cost estimation method does not use
Q35: Which of the following statements is (are)true
Q36: A manager is trying to estimate the
Q37: Which of the following statements regarding regression
Q39: Given the following information,compute the total number
Q40: Which of the following cost estimation methods
Q41: Based on the results of the high-low
Q43: If the controller uses regression analysis to
Q53: The Wiscow Manufacturing Company recorded overhead costs
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents