If the controller uses the high-low method to estimate costs,the cost equation for electricity cost is:
A) Cost = $3,726.88 + $5.77 Machine-hours.
B) Cost = $1,625.00 + $6.25 Machine-hours.
C) Cost = $6.90 Machine-hours.
D) Cost = $22,825.