The manager of a branch bank wants to build a simulation model of the lobby operation to reduce the waiting time of her customers.The number of customers waiting in line at any point of time is an example of
A) a decision variable.
B) an uncontrollable variable.
C) a time-compressed variable.
D) a dependent variable.
Correct Answer:
Verified
Q1: The manager of a branch bank wants
Q9: Which one of the following relationships is
Q11: A manager has been given the
Q11: Simulation models are:
A) useful when waiting line
Q14: Simulation is the process of reproducing the
Q15: Excel can be used to perform
A) discrete,
Q18: Decision variables are random events that the
Q18: Which of these is a special simulation
Q20: _ is a feature of simulation models
Q28: A simulation model is used to test
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents