The delivery of a typical building project, as described in this text, may be divided into
A) two phases.
B) three phases.
C) four phases.
D) five phases.
E) six phases.
Correct Answer:
Verified
Q7: The term MEP is an acronym for
A)mechanical,
Q8: In a typical building project, the coordination
Q9: In MasterFormat, Division 04 refers to
A)General Requirements.
B)Metals.
C)Existing
Q10: The bidding documents include
A)construction drawings, specifications, addenda,
Q11: Who is responsible for ensuring the safety
Q13: MasterFormat consists of
A)20 divisions.
B)30 divisions.
C)40 divisions.
D)50 divisions.
E)none
Q14: In MasterFormat, flooring is part of
A)Division 07.
B)Division
Q15: Establishing the project's economic feasibility and its
Q16: The construction drawings of a building project
Q17: The construction drawings of a building project
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents