The program for a building project is prepared by the
A) architect.
B) building official of the city.
C) general contractor.
D) owner.
E) all of the above collectively.
Correct Answer:
Verified
Q1: The specifications of a typical building project
Q2: In MasterFormat, roofing is part of
A)Division 10.
B)Division
Q4: The construction document set consists of
A)construction drawings,
Q5: In MasterFormat, Division 02 refers to
A)Procurement and
Q6: The construction drawings of a building project
Q7: The term MEP is an acronym for
A)mechanical,
Q8: In a typical building project, the coordination
Q9: In MasterFormat, Division 04 refers to
A)General Requirements.
B)Metals.
C)Existing
Q10: The bidding documents include
A)construction drawings, specifications, addenda,
Q11: Who is responsible for ensuring the safety
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents