Who is typically responsible for obtaining the certificate of occupancy from the local jurisdiction?
A) Owner
B) GC
C) Architect
Correct Answer:
Verified
Q27: The project manual includes the project's construction
Q28: The owner is required to provide payment
Q29: A contract document set consists of
A)construction drawings,
Q30: The primary purpose of the contract modification
Q31: Of the various project delivery methods described
Q33: A GC would usually require performance bond
Q34: Where the owner is sufficiently familiar and
Q35: The day- to- day supervision of construction
Q36: Shop drawings are prepared during the design
Q37: All required surety bonds must be provided