Use the information below to answer the following question(s) .
A production line operates for 450 minutes per day.Desired production volume is 80 units per day.Total task time to make the product is 56 minutes.
-What is the balance delay?
A) 88.88%
B) 0.44%
C) 66.67%
D) 33.33%
Correct Answer:
Verified
Q22: U-shaped production lines that are more efficient
Q23: If a line is balanced with 80-percent
Q24: Use the information below to answer the
Q25: Use the information below to answer the
Q26: In a process map,a rectangle indicates that
Q28: In Muther's grid the Symbol "X" represents
Q29: The cycle time in a production line
Q30: Fixed position layouts
A)support mass assembly of products.
B)are
Q31: The model used in designing functional layouts
Q32: A schematic picture of a process using
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents