EZ Set produces a quick setting concrete powder. Production of 15,000 tons was started in September, 14,000 tons were completed. Material costs were $394,670 for the month while conversion costs were $201,730. There was no beginning work-in-process; the ending work-in-process was 20% complete.
Required:
(a) What is the total cost of the product that was completed and transferred to finished goods?
(b) What is the value of the ending work-in-process?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q101: Job 599 was recently completed. The
Q102: Mason Industries restarted operations on September
Q103: Fill in the missing items for the
Q104: Assume that the following events occurred at
Q105: Logansville Manufacturing produces lamps for large
Q107: Determine the missing values from the table
Q108: Which of the following statements is true?
A)
Q109: Fill in the missing items for the
Q110: Determine the missing values from the table
Q111: A hybrid costing system that is often
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents