Application of Types of Control
Sam has not been receiving the information that he needs from his current control system. By the time Sam receives the information, the activity has occurred and there is nothing that can be done. Direct supervision is used extensively on the floor now, so some activities have been changed before they became costly mistakes. But Sam would like to do better. He would like to fix things before they break and anticipate more of the problems that occur.
-_____________control would require Sam to gather timely and accurate information that may be hard to develop.
A) Concurrent
B) Feedforward
C) Feedback
D) Management
Correct Answer:
Verified
Q24: Application of Designing a Control System
Gina realizes
Q25: There are three different approaches to designing
Q26: If organizational culture is open and supportive,
Q27: Which of the following is characteristic of
Q28: Since the_ belong to the company, they
Q30: When measured performance does not meet the
Q31: Alta Corp. has turned each of its
Q32: Application of Designing a Control System
Gina realizes
Q33: The greater the distance between countries within
Q34: According to recent studies, employee theft and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents