A production-volume variance is calculated as the applied volume minus the actual volume multiplied by the actual overhead rate.
Correct Answer:
Verified
Q24: Gross margin appears in a variable-costing income
Q27: The absorption-costing method has fixed factory overhead
Q28: When actual volume is more than expected
Q30: It is possible for variable overhead to
Q31: The variable-costing method does not include fixed
Q32: Most companies consider production-volume variances to be
Q33: Any difference in variable-costing and absorption-costing operating
Q34: Production-volume variance = applied fixed overhead -
Q137: An unfavorable production volume variance decreases the
Q150: When sales exceed production,variable-costing income is greater