The following network shows a portion of an IT project involving programming, hardware installation, and implementation. As shown, programming and hardware installation are both estimated to be 52 days in duration. These estimates are not exact, given the uncertainty that can occur in any project environment, but they do share the same statistical distribution, with 52 as the median value.
Given what is covered in Chapter 6 regarding two tasks that merge into a common successor, what is the approximate probability that implementation can begin at the end of 52 days of concurrent work on programming and hardware installation?
A) 0%
B) 25%
C) 50%
D) 75%
E) 100%
Correct Answer:
Verified
Q1: A project team estimates that a work
Q2: Which of the following types of precedence
Q3: Activity time estimates for the following project
Q4: Which of the following schedule display formats
Q6: The following network is the basis for
Q7: The following information is the basis
Q8: The following network is the basis for
Q9: Based on the table in the previous
Q10: The following software development plan is the
Q11: Which of the following is an example
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents