Solved

A Major Conceptual Difference Between Throughput Costing and Variable Costing

Question 65

Multiple Choice

A major conceptual difference between throughput costing and variable costing is


A) under variable costing, direct labour and variable manufacturing overhead are charged to income as period expenses.
B) under throughput costing, direct labour and variable manufacturing overhead are deferred in inventory rather than charged to income as period expenses.
C) under throughput costing, direct labour and variable manufacturing overhead are charged to income as period expenses.
D) there are no conceptual differences between the two methods.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents