A company has tool cribs where workmen draw parts. Two men have applied for the position of distributing parts to the workmen. George Fuller is fresh out of trade school and expects a $6 per hour salary. His average service time is 4 minutes. John Cox is a veteran who expects $12 per hour. His average service time is 2 minutes. A workman's time is figured at $10 per hour. Workmen arrive to draw parts at an average rate of 12 per hour.
a.What is the average waiting time a workman would spend in the system under each applicant?
b.Which applicant should be hired?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q24: The equations provided in the textbook for
Q40: If arrivals occur according to the Poisson
Q41: Arrivals at a box office in the
Q41: The post office uses a multiple channel
Q42: For an M/G/1 system with λ =
Q43: Quick Clean Rooter cleans out clogged drains.
Q46: For an M/G/1 system with λ =
Q48: The machine repair problem is an application
Q49: In a waiting line situation, arrivals occur
Q50: Andy Archer, Ph.D., is a training consultant
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents