The time taken for guests to check out at a hotel front desk was measured over the course of several weeks. The management believes that the target time for checking out guests should be between 2 and 3 minutes with a target of 2.5 minutes. The data gathered for the actual process had a mean time of 2.75 minutes with a standard deviation of 0.45 minutes. The process capability index will be:
A) less than or equal to 1.
B) more than 3 but less than or equal to 5.
C) more than 4 but less than or equal to 5.
D) more than 5.
Correct Answer:
Verified
Q5: The task of_is to ensure that a
Q6: In the context of the net promoter
Q7: Keeping special cause variation from occurring is
Q8: Which of the following is true of
Q9: The 1:10:100 Rule states that if a
Q11: In the context of designing control charts,
Q12: In the context of quality control practices
Q13: The lower and upper specification limits for
Q14: In the context of the net promoter
Q15: In the context of statistical process control
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents