DaimlerChrysler decided not to build a $750 million plant in southeast Georgia in spite of the state spending $24 million to purchase the property and an additional $36 million to prepare the site specifically for DaimlerChrysler.The _____ offered was not enough to convince DaimlerChrysler that the Georgia site was a good location for its factory.
A) availability of customers
B) proximity of raw materials
C) low labor costs
D) local incentives
E) manufacturing environment
Correct Answer:
Verified
Q42: Which of the following is a characteristic
Q43: Which of the following is the BEST
Q44: Because with building costs soaring out of
Q45: A company that reupholsters furniture in fabric
Q46: Which of the following businesses would be
Q48: A _ shop is a manufacturing firm
Q49: Cherokee Spring Mill produces four varieties of
Q50: Levi Strauss was strongly praised when it
Q51: A continuous production process has all of
Q52: Which of the following is NOT a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents