Solve the problem.
-A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 5% cement should he mix with 14 bags of 14.5% cement to produce a mix containing 12% cement?
A) 24 bags
B) 5 bags
C) 19 bags
D) 7 bags
Correct Answer:
Verified
Q60: Solve the system. If the system
Q61: Solve the problem.
-A company makes 3 types
Q62: Solve the problem.
-The following table shows
Q63: Solve the problem.
-A grain dealer sold to
Q64: Solve the problem.
-A $64,000 trust is to
Q66: Solve the problem.
-Bob fenced in a rectangular
Q67: Solve the problem.
-The perimeter of a rectangle
Q68: Solve the problem.
-The sum of a studentʹs
Q69: Solve the problem.
-The perimeter of a triangle
Q70: Solve the problem.
-Best Rentals charges a daily
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents