Solve the problem.
-A steel company produces two types of machine dies, part A and part B and is bound by the following constraints:
· Part A requires 1 hour of casting time and 10 hours of firing time.
· Part B requires 4 hours of casting time and 3 hours of firing time.
· The maximum number of hours per week available for casting and firing are 100 and 70, respectively.
· The cost to the company is $0.75 per part A and $3.00 per part B. Total weekly costs cannot exceed
$45.00.
Let x = the number of part A produced in a week and y = the number of part B produced in a week. Write
A system of three inequalities that describes these constraints.
A)
B)
C)
D)
Correct Answer:
Verified
Q236: Solve the problem.
-A coffee store has available
Q237: Solve the problem.
-A woman works out by
Q238: Solve the problem.
-Benjamin never has more
Q239: Graph the solution set of the
Q240: Graph the inequality.
-
Q242: Solve the problem.
-A steel company produces
Q243: Graph the solution set of the
Q244: Graph the solution set of the
Q245: Graph the solution set of the
Q246: Solve the problem.
-A dietitian needs to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents