This is a three-part question about critical path calculation. Consider a simple single- cycle implementation of MIPS ISA. The operation times for the major functional components for this machine are as follows:
-
Below is a copy of the MIPS single-cycle datapath design. In this implementation the clock cycle is determined by the longest possible path in the machine. The critical paths for the different instruction types that need to be considered are: R-format, Load-word, and store-word. All instructions have the same instruction fetch and decode steps. The basic register transfer of the instructions are:
Fetch/Decode: Instruction <- IMEM[PC];
R-type: R[rd] <- R[rs] op R[rt]; PC <- PC + 4;
load: R[rt] <- DMEM[ R[rs] + signext(offset)]; PC <- PC +4; store: DMEM[ R[rs] + signext(offset)] <- R[Rt]; PC <- PC +4;
(Part A)
In the table below, indicate the components that determine the critical path for the respective instruction, in the order that the critical path occurs. If a component is used, but not part of the critical path of the instruction (ie happens in parallel with another component), it should not be in the table. The register file is used for reading and for writing; it will appear twice for some instructions. All instruction begin by reading the PC register with a latency of 2ns.
![This is a three-part question about critical path calculation. Consider a simple single- cycle implementation of MIPS ISA. The operation times for the major functional components for this machine are as follows: - Below is a copy of the MIPS single-cycle datapath design. In this implementation the clock cycle is determined by the longest possible path in the machine. The critical paths for the different instruction types that need to be considered are: R-format, Load-word, and store-word. All instructions have the same instruction fetch and decode steps. The basic register transfer of the instructions are: Fetch/Decode: Instruction <- IMEM[PC]; R-type: R[rd] <- R[rs] op R[rt]; PC <- PC + 4; load: R[rt] <- DMEM[ R[rs] + signext(offset)]; PC <- PC +4; store: DMEM[ R[rs] + signext(offset)] <- R[Rt]; PC <- PC +4; (Part A) In the table below, indicate the components that determine the critical path for the respective instruction, in the order that the critical path occurs. If a component is used, but not part of the critical path of the instruction (ie happens in parallel with another component), it should not be in the table. The register file is used for reading and for writing; it will appear twice for some instructions. All instruction begin by reading the PC register with a latency of 2ns.](https://d2lvgg3v3hfg70.cloudfront.net/TB5290/11eb4b6a_2494_097a_9bf3_cd586c59e320_TB5290_00.jpg)
Correct Answer:
Verified
Q9: A two-part question.
-Given four instructions, how many
Q10: Pipelining is used because it improves instruction
Q11: You are given a 4-stage pipelined
Q12: Consider the datapath below. This machine does
Q13: Structural, data and control hazards typically require
Q15: Consider the following data path diagram:
Q16: Branch Prediction. Consider the following sequence of
Q17: Forwarding logic design. For this problem you
Q18: This is a three-part question about critical
Q19: This is a three-part question about
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents