DaimlerChrysler decided not to build a $750 million plant in southeast Georgia in spite of the state's spending $24 million to purchase the property and an additional $36 million to prepare the site specifically for DaimlerChrysler. Which of the following factors was offered?
A) availability of customers
B) proximity of raw materials
C) low labour costs
D) local incentives
Correct Answer:
Verified
Q49: Which of the following is NOT one
Q50: What is the physical arrangement of a
Q51: After product specifications are set, a company
Q52: A process layout is best for a
Q53: Cellular manufacturing combines aspects of which of
Q55: Products that are difficult to move out
Q56: Products that require a continuous or repetitive
Q57: Which of the following is a production
Q58: What is the purchasing function sometimes known
Q59: Taco Bell does not chop the lettuce
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents