Tests of details are designed based upon planned results of analytical review and planned results of tests of controls.Should the planned results differ materially from the actual results of analytical review and tests of controls,then
A) audit risk will be revised.
B) the planned audit program will require revision.
C) inherent risk will be revised.
D) tests of controls will not be considered for overall risk assessment processes.
Correct Answer:
Verified
Q62: Restaurant Products Company (RPC)has been an audit
Q63: Cimco Forest is a client of your
Q64: When auditors perform audit procedures relating to
Q65: The audit program for most audits is
Q66: A standard audit program can dramatically increase
A)audit
Q68: Control risk has been assessed at 100%
Q69: Which of the following ultimately determines the
Q70: "This is really confusing! I've sat in
Q71: A PA has designed an audit approach
Q72: You are conducting the audit of a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents